196,854.0 Euro
0 references
231,593.0 Euro
0 references
85.0 percent
0 references
30 June 2016
0 references
21 April 2017
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
0 references
It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
9 July 2021
0 references
L’objectif est de mettre en œuvre une opération de prétraitement de l’effluent et l’installation d’un système de dosage de l’acide chlorhydrique dilué à la surface de l’étang de maturation afin d’éviter la prolifération des algues. L’opération assure ainsi un traitement adéquat des effluents collectés pour une population de 25006 personnes servies et contribue à l’amélioration de la qualité des masses d’eau. (French)
7 December 2021
0 references
Ziel ist es, einen Vorbehandlungsbetrieb des Abwassers und die Installation eines verdünnten Salzsäuredosiersystems auf der Oberfläche des Reifungsteiches durchzuführen, um Algenproliferation zu vermeiden. Der Betrieb gewährleistet somit eine ordnungsgemäße Behandlung der für eine Bevölkerung von 25006 gedienten Abwässer und trägt zur Verbesserung der Qualität der Wasserkörper bei. (German)
15 December 2021
0 references
Alpiarça, Alpiarça
0 references
Identifiers
POSEUR-03-2012-FC-000040
0 references