MAJOR PROJECT ‘SS 268 DEL VESUVIO — CONSTRUCTION WORK FOR THE 3ND BODY INCLUDING RELEASE OF ANGRI’ (Q2023259)
Jump to navigation
Jump to search
Project Q2023259 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | MAJOR PROJECT ‘SS 268 DEL VESUVIO — CONSTRUCTION WORK FOR THE 3ND BODY INCLUDING RELEASE OF ANGRI’ |
Project Q2023259 in Italy |
Statements
9,854,801.78 Euro
0 references
13,139,735.7 Euro
0 references
75.0 percent
0 references
1 March 2003
0 references
4 May 2017
0 references
ANAS SPA - AREA COMPARTIMENTALE PER LA CAMPANIA
0 references
IL PROGETTO CONSISTE NELLA REALIZZAZIONE DELLO SVINCOLO DELLA SS 268 DEL VESUVIO IN LOCALITà ANGRI, COMPLETANDO IL TRATTO GIà IN ESERCIZIO, TRA NAPOLI (PONTICELLI) E SCAFATI DELL'ATTUALE SS 268, E RIAMMAGLIANDO LA VIABILITà NAZIONALE CON QUELLA AUTOSTRADALE.IN PARTICOLARE, LO SVINCOLO IN PROGETTO SI ARTICOLA IN UN RAZIONALE COMPLESSO DI RAMPE E VIABILITà UNIDIREZIONALI, CHE CONSENTE TUTTE LE MANOVRE POSSIBILI IN SICUREZZA E FLUIDITà .DAL PUNTO DI VISTA TECNICO-STRUTTURALE LO SVINCOLO SI SVILUPPA PRINCIPALMENTE CON UN VIADOTTO IN TRAVI IN ACCIAIO SOSTENUTO DA PILE CIRCOLARI FONDATE SU PALI DI UGUALE DIAMETRO AMMORSATI SUL BANCO DI TUFO ESISTENTE, SUL QUALE SI INSERISCE UNA SOLETTA IN C.A.SCHEMATICAMENTE IL PROGETTO DELLO SVINCOLO PUò DIVIDERSI IN QUATTRO SOTTOELEMENTI:-LO SVINCOLO PER ANGRI - SALERNO-IL PIAZZALE DEL CASELLO DI PEDAGGIO PER L'AUTOSTRADA A3 NAPOLI - POMPEI - SALERNO-LO SVINCOLO AUTOSTRADALE-LO SVINCOLO EX SS 18 (Italian)
0 references
THE PROJECT CONSISTS OF THE COMPLETION OF THE RELEASE OF THE SS 268 OF MOUNT VESUVIO IN LOCALITWILL ANGRI, COMPLETING THE SECTION IN OPERATION, BETWEEN NAPLES (PONTICELLI) AND SCAFATI OF THE CURRENT SS 268, AND IRAMMAGLIING THE ITALIAN VIABILITUSES WITH THAT OF AN EXISTING CIRCULAR ON PILES OF DIAMETER AMMORSATI ON THE EXISTING TUFF PILES, WHICH CAN BE DIVIDED INTO FOUR SUB-ELEMENTS: (English)
0 references
LE PROJET CONSISTE EN LA RÉALISATION DE LA JONCTION DE SS 268 DE VÉSUVE À ANGRI, COMPLÉTANT LE TRONÇON DÉJÀ EN OPÉRATION, ENTRE NAPLES (PONTICELLI) ET SCAFATI DE L’ACTUELLE SS 268, ET REAMMAGING LA ROUTE NATIONALE AVEC QUE AUTOSTRADALE.EN PARTICULIER, LA JONCTION DANS LE PROJET EST DIVISÉE EN UN COMPLEXE RATIONNEL DE RAMPES ET DE ROUTES UNIDIRECTIONNELLES. QUI PERMET TOUTES LES MANŒUVRES POSSIBLES EN SÉCURITÉ ET FLUIDITÃ.DE LA VUE TECHNIQUE-STRUCTURALE LA JONCTION EST PRINCIPALEMENT DÉVELOPPÉE AVEC UN FAISCEAU EN ACIER SOUTENU PAR DES PIEUX CIRCULAIRES BASÉS SUR DES PIEUX DE DIAMÈTRE ÉGAL ADOUCIS SUR LE BANC EXISTANT, SUR LEQUEL EST INSÉRÉE UNE DALLE À C.A.SCHEMATICAMENTE LE PROJET DE LA JONCTION PUò EST DIVISÉ EN QUATRE SOUS-ÉLÉMENTS:-THE JONCTION POUR ANGRI — SALERNO-LA PLACE DE LA CABINE DE PÉAGE POUR L’A3 NAPLES — POMPÉI — SALERNO AUTOROUTE-LA JONCTION EX SS 18 (French)
14 December 2021
0 references
Identifiers
F81B02000140001
0 references