Improving the effectiveness of treatment of civilisation diseases caused by cardiovascular diseases and improving patient safety through the purchase of medical equipment and construction works related to the reconstruction of the unit of systemic rehabilitation with the neurological rehabilitation subdivision and the construction of an additional entrance to the Hospital with stairs and lift (Q2709707)

From EU Knowledge Graph
Revision as of 11:37, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2709707 in Poland
Language Label Description Also known as
English
Improving the effectiveness of treatment of civilisation diseases caused by cardiovascular diseases and improving patient safety through the purchase of medical equipment and construction works related to the reconstruction of the unit of systemic rehabilitation with the neurological rehabilitation subdivision and the construction of an additional entrance to the Hospital with stairs and lift
Project Q2709707 in Poland

    Statements

    0 references
    0 references
    961,560.29 zloty
    0 references
    213,754.85 Euro
    0.2223 Euro
    0 references
    1,131,247.42 zloty
    0 references
    251,476.3 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 July 2020
    0 references
    30 January 2022
    0 references
    OPOLSKIE CENTRUM REHABILITACJI W KORFANTOWIE SP. Z O.O.
    0 references
    0 references

    50°29'16.8"N, 17°35'54.2"E
    0 references
    Przedmiotem projektu jest zakup specjalistycznego sprzętu medycznego niezbędnego do leczenia chorób cywilizacyjnych wywołanych schorzeniami sercowo - naczyniowymi na oddział rehabilitacji ogólnoustrojowej z pododdziałem neurologicznym i dział fizjoterapii, a ponadto przebudowa oddziału znajdującego się na parterze budynku - pawilon "B" w zakresie adaptacji części każdej z 5 sal na łazienkę z WC, przebudowania dwóch nieużytkowanych pomieszczeń szpitalnych na salę chorych wraz z węzłem sanitarnym oraz doprowadzenie instalacji gazów medycznych bezpośrednio do paneli przyłóżkowych. W ramach projektu wykonana zostanie instalacja fotowoltaiczna wspomagająca instalację elektryczną. W celu przekierowania dotychczasowego ruchu pacjentów oraz personelu medycznego innych oddziałów, który w związku z brakiem innej możliwości przemieszczają się na zabiegi z hydroterapii przez oddział rehabilitacji ogólnoustrojowej, zaplanowano budowę dodatkowego wejścia do Szpitala wraz ze schodami i windą dla osób niepełnosprawnych. Przedsięwzięcie realizowane będzie w Korfantowie przy ul. Wyzwolenia 11 (działka nr 483/14). Poniesione w ramach wkładu własnego oraz planowanego dofinansowania nakłady inwestycyjne na zakup aparatury medycznej wyniosą 180 802,50 zł. (Polish)
    0 references
    The subject of the project is the purchase of specialised medical equipment necessary for the treatment of civilisation diseases caused by cardiovascular diseases to the unit of systemic rehabilitation with neurological sub-unit and physiotherapy department, as well as the reconstruction of the branch located on the ground floor of the building – Pavilion “B” in terms of adapting parts of each of the 5 rooms to a bathroom with toilet, rebuilding two unused hospital rooms into a sick room with a sanitary node and bringing medical gas installations directly to the bedside panels. The project will carry out a photovoltaic installation supporting the electrical installation. In order to redirect the current movement of patients and medical staff of other branches, who, due to the lack of other possibilities, move to hydrotherapy treatments through the unit of systemic rehabilitation, it is planned to build an additional entrance to the Hospital with stairs and lift for people with disabilities. The project will be implemented in Korfantów at ul. Liberation 11 (plot No 483/14). The investment expenditure for the purchase of medical equipment incurred as part of the own contribution and the planned co-financing will amount to PLN 180 802.50. (English)
    8 July 2021
    0 references
    L’objet du projet est l’achat du matériel médical spécialisé nécessaire au traitement des maladies de civilisation causées par des maladies cardiovasculaires à l’unité de réadaptation systémique avec sous-unité et physiothérapie neurologiques, ainsi que la reconstruction de la branche située au rez-de-chaussée du bâtiment — Pavillon «B» en ce qui concerne l’adaptation de parties de chacune des 5 chambres à une salle de bain avec toilettes, la reconstruction de deux salles d’hôpital inutilisées dans une salle de repos avec un nœud sanitaire et l’apport d’installations de gaz médicaux directement aux panneaux de chevet. Le projet réalisera une installation photovoltaïque soutenant l’installation électrique. Afin de réorienter le mouvement actuel des patients et du personnel médical d’autres branches, qui, en raison de l’absence d’autres possibilités, passent à des traitements d’hydrothérapie par l’intermédiaire de l’unité de réadaptation systémique, il est prévu de construire une entrée supplémentaire de l’hôpital avec des escaliers et un ascenseur pour les personnes handicapées. Le projet sera mis en œuvre à Korfantów à ul. Libération 11 (plot no 483/14). Les dépenses d’investissement pour l’achat de matériel médical encourus dans le cadre de la contribution propre et du cofinancement prévu s’élèveront à 180 802,50 PLN. (French)
    4 December 2021
    0 references
    Gegenstand des Projekts ist der Kauf von spezialisierten medizinischen Geräten, die für die Behandlung von Zivilisationskrankheiten durch Herz-Kreislauf-Erkrankungen zur Einheit der systemischen Rehabilitation mit neurologischer Untereinheit und Physiotherapie-Abteilung erforderlich sind, sowie die Rekonstruktion des Zweiges im Erdgeschoss des Gebäudes – Pavillon „B“ in Bezug auf die Anpassung von Teilen jedes der 5 Räume an ein Badezimmer mit Toilette, den Wiederaufbau zweier ungenutzter Krankenhausräume in einen kranken Raum mit einem sanitären Knoten und medizinische Gasinstallationen direkt an die Nachttafeln. Das Projekt wird eine Photovoltaikanlage zur Unterstützung der elektrischen Anlage durchführen. Um die aktuelle Bewegung von Patienten und medizinischem Personal anderer Zweige zu lenken, die aufgrund des Fehlens anderer Möglichkeiten zu Hydrotherapiebehandlungen durch die Einheit der systemischen Rehabilitation wechseln, ist geplant, einen zusätzlichen Eingang zum Krankenhaus mit Treppen und Aufzug für Menschen mit Behinderungen zu bauen. Das Projekt wird in Korfantów in ul durchgeführt. Befreiung 11 (Plot Nr. 483/14). Die Investitionsausgaben für den Kauf medizinischer Ausrüstung, die im Rahmen des Eigenbeitrags angefallen sind, und die geplante Kofinanzierung belaufen sich auf 180 802,50 PLN. (German)
    14 December 2021
    0 references

    Identifiers

    RPOP.10.01.01-16-0010/20
    0 references