ELECTRIC STATION PICERNO (Q2021711)

From EU Knowledge Graph
Revision as of 11:14, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2021711 in Italy
Language Label Description Also known as
English
ELECTRIC STATION PICERNO
Project Q2021711 in Italy

    Statements

    0 references
    5,784,236.38 Euro
    0 references
    7,829,660.8 Euro
    0 references
    73.88 percent
    0 references
    6 September 2017
    0 references
    31 July 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°38'18.46"N, 15°38'9.13"E
    0 references
    L'INTERVENTO RIGUARDA LA REALIZZAZIONE DI UNA NUOVA STAZIONE RTN IN DOPPIA SBARRA A 150 KV DA INSERIRE IN ENTRA-ESCE SUI NUOVI COLLEGAMENTI A 150 KV 'CP TITO SMISTAMENTO-CP AVIGLIANO' E 'CP TITO SMISTAMENTO-TANAGRO'.LA REALIZZAZIONE DI TALE STAZIONE SI RENDE NECESSARIA PER AUMENTARE L'AFFIDABILITà DELLA RTN IN UN'AREA NELLA QUALE VI Ê UN'ELEVATA RICHIESTA DI CONNESSIONI (STMG APPROVATE PER 479 MW) OLTRE A PREVENTIVI ACCETTATI DAL DISTRIBUTORE (63 MW SULLA RETE AT E 6 MW SULLA RETE BTBT) CHE, IN ASSENZA DELL'OPERA IN ESAME, NON POTREBBERO ESSERE IMMESSE IN RETE A CAUSA DELLA LIMITATA PORTATA DELLE DIRETTRICI 150 KV 'TANAGRO-POTENZA' E 'TANAGRO-TITO-POTENZA' CHE HANNO UNA CAPACITà DI TRASPORTO NOMINALE DI CIRCA 145 MW CIASCUNA, PER UN TOTALE COMPLESSIVO PARI A 290 MW.L'INTERVENTO OLTRE ALLA REALIZZAZIONE DELLA NUOVA S.E. RIGUARDERà ANCHE LA REALIZZAZIONE DEI RELATIVI RACCORDI I CUI TRACCIATI SI DIRAMANO DAI DUE ELETTRODOTTI ESISTENTI TITO SMISTAMENTO-AVIGLIANO E TITO SMISTAMENTO-TA (Italian)
    0 references
    THE INTERVENTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV DOUBLE RAIL NETWORK STATION TO BE INTEGRATED INTO ENTRA-ESEC ON THE NEW 150 KV ‘CP TITO SMISTINGTO-CP AVILIANO’ AND ‘CP TITO SMISTINGTO-TANAGRO’. THE CONSTRUCTION OF THIS STATION IS NECESSARY TO INCREASE L’AFFIDABILITY IN AN AREA WHERE THERE IS A HIGH DEMAND FOR CONNECTIONS (479 MW ON THE TA NETWORK AND 6 MW ON THE BTBT NETWORK), WHICH, IN THE ABSENCE OF THE WORK IN QUESTION, CANNOT BE PLACED ON THE NETWORK BECAUSE OF THE LIMITED SCOPE OF THE 63 KV GUIDELINES ‘TANAGRO-JUDGMENT’ AND ‘TANAGRO-TITO-POWERED’, WHICH ALSO HAVE THE CONNECTIONS SET OUT IN THE TWO EXISTING LINES, TITO SMISTINGTO-AVIOGLIANO AND TITO SMISTINGTO-TA. (English)
    0 references
    LE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE STATION RTN EN DOUBLE BARRE À 150 KV QUI SERA INSÉRÉE DANS LES NOUVELLES CONNEXIONS DE 150 KV «CP TITO TRI-CP AVIGLIANO» ET «CP TITO TRI-TANAGRO».LA CONSTRUCTION DE CETTE STATION EST NÉCESSAIRE POUR ACCROÎTRE LA FIABILITÉ DU RTN DANS UNE ZONE OÙ LA DEMANDE DE CONNEXIONS EST ÉLEVÉE (STMG APPROUVÉE POUR 479 MW) EN PLUS DES ESTIMATIONS ACCEPTÉES PAR LE DISTRIBUTEUR (63 MW SUR LE RÉSEAU ET 6 MW SUR LE RÉSEAU BTBT) QUI, EN L’ABSENCE DES TRAVAUX EN QUESTION, N’ONT PAS PU ÊTRE ALIMENTÉES DANS LE RÉSEAU DE RACCORDEMENTS (STMG APPROUVÉ POUR 479 MW) DONT LA CAPACITÉ TOTALE À DEUX MW EST SUPÉRIEURE À LA CAPACITÉ TOTALE DE DEUX MW. (French)
    14 December 2021
    0 references

    Identifiers

    G83G17000880007
    0 references