SMART GRID PROJECT OF THE SUIO PRIMARY CABIN (Q2017730)
Jump to navigation
Jump to search
Project Q2017730 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SMART GRID PROJECT OF THE SUIO PRIMARY CABIN |
Project Q2017730 in Italy |
Statements
3,071,358.38 Euro
0 references
4,157,453.59 Euro
0 references
73.88 percent
0 references
26 March 2018
0 references
31 December 2020
0 references
E-DISTRIBUZIONE SPA
0 references
IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITÃ SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA, DELLE CABINE SECONDARIE E DEI CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO IMPLEMENTATE NUOVE LINEE MT UTILIZZANDO I NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITÃ SMART:-SELETTIVITÃ LOGICA DEL TRONCO GUASTO-OSSERVABILITÃ DELLA RET (Italian)
0 references
THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE AIM OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE PROJECT ENVISAGES THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN, SECONDARY AND UNDERLYING SATELLITE CENTRES. IN ADDITION, NEW MT LINES WILL BE IMPLEMENTED USING NEW ALUMINIUM AND ALUMINIUM WIRE CABLES. THIS PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY GRID, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FUNCTIONS WILL BE IMPLEMENTED: (English)
0 references
LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DU SYSTÈME AFIN D’AMÉLIORER LES CONDITIONS DE FONCTIONNEMENT ET LES PRESTATIONS.LE PROJET PRÉVOIT L’UTILISATION DES DISPOSITIFS DE DERNIÈRE GÉNÉRATION QUI PERMETTENT L’INTELLIGENCE COMPLÈTE DE LA CABINE PRIMAIRE, DES CABINES SECONDAIRES ET DES CENTRES SATELLITAIRES SOUS-JACENTS. EN OUTRE, DE NOUVELLES LIGNES MT SERONT MISES EN ŒUVRE À L’AIDE DU NOUVEAU CABLES ELICORD ALUMINIUM ET ALUMINIUM.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT PUISQU’IL PRÉVOIT L’INSTALLATION D’APPAREILS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, LES FONCTIONS INTELLIGENTES SUIVANTES SONT MISES EN ŒUVRE:-SELETTIVITY LOGIQUE DE L’OBSERVABILITÉ DU TRONC DÉFECTUEUX DU RET (French)
14 December 2021
0 references
Identifiers
F51F18000000006
0 references