Adaptation of the premises of the residential building to the Emergency Intervention Point and Consultation Point (Q2699313)

From EU Knowledge Graph
Revision as of 07:09, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2699313 in Poland
Language Label Description Also known as
English
Adaptation of the premises of the residential building to the Emergency Intervention Point and Consultation Point
Project Q2699313 in Poland

    Statements

    0 references
    1,042,985.91 zloty
    0 references
    231,855.77 Euro
    0.2223 Euro
    0 references
    1,227,042.25 zloty
    0 references
    272,771.49 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    30 June 2021
    0 references
    GMINA ŻNIN
    0 references
    0 references

    52°50'54.6"N, 17°43'18.8"E
    0 references
    Inwestycja objęta projektem ma charakter infrastrukturalny. Polega na zmianie sposobu użytkowania budynku mieszkalnego na pomieszczenia użyteczności publicznej (Punkt Interwencji Kryzysowej, Punkt Konsultacyjny) wraz z rozbudową części wejściowej, remontem elewacji północnej i zachodniej budynku głównego i dociepleniem pozostałych elewacji nieruchomości Miejskiego Ośrodka Pomocy Społecznej zlokalizowanej w granicach działki nr ewid. 1085/10 przy ul. 700-lecia 36 w Żninie.W ramach prac przewiduje się dodatkowo regulację instalacji c.o. w całym budynku, remont zjazdu na teren oraz budowę dróg i placów wewnętrznych.Zmiana pierwotnego projektu budowlanego polegała na zmianie przeznaczenia pomieszczeń I piętra oficyny, wynikającą z konieczności dostosowania obiektu do nowych przepisów regulujących pracę i zakres działalności placówek MOPS. Zmiana polega na rezygnacji z mieszkania chronionego i przeznaczeniu pozyskanej powierzchni na pomieszczenia biurowe. Konsekwencją nowej funkcji są nieistotne zmiany elewacyjne dotyczące dwóch okien i dodatkowego trzonu wentylacyjnego oraz konstrukcyjne - wiążące się z dodatkowym nadprożem nad otworem okiennym, a także instalacyjne.Projekt budowlany obejmuje swoim zakresem budowę zjazdu z drogi gminnej, jednak nie wchodzi od w zakres niniejszego opracowania. Będzie on wykonany w terminie późniejszym wraz z planowaną przez gminę Żnin modernizacją ul. 700-lecia.W ramach projektu przewidziano zakup sprzętu i wyposażenia. Należą do nich:- komputery stacjonarne (stacje robocze) – 5 szt.,- sieć LAN,- meble do gabinetu psychologa, pokoju spotkań, pokoi biurowych, aneksu kuchennego, toalet. (Polish)
    0 references
    The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10 at ul. 700th Anniversary of 36th Anniversary in Żnin.In addition, it is envisaged to regulate central heating installations throughout the building, overhaul of the exit to the site and construction of roads and internal squares. The change of the original construction project consisted of a change in the use of the premises and floor of the office, resulting from the need to adapt the facility to the new regulations governing the work and scope of activities of the ILOS facilities. The change consists of the abandonment of the protected apartment and the use of the acquired space for office space. The consequence of the new function is insignificant facade changes concerning two windows and an additional ventilation shaft and construction – involving an additional lintel above the window opening, as well as installation. The construction project covers the construction of an exit from the municipal road, but does not fall within the scope of this study. It will be carried out at a later date along with the modernisation of ul. 700th Anniversary.The project provides for the purchase of equipment and equipment. These include:- desktop computers (work stations) – 5 pcs.,- LAN,- furniture for the psychologist’s office, meeting room, office rooms, kitchenette, toilets. (English)
    7 July 2021
    0 references
    L’investissement couvert par le projet est de nature infrastructurelle. Il consiste à changer l’utilisation d’un bâtiment résidentiel en espaces publics (point d’intervention d’urgence, point de consultation) ainsi que l’extension de la partie d’entrée, la rénovation des façades nord et ouest du bâtiment principal et le réchauffement de la façade restante du Centre municipal d’assistance sociale située dans les limites de la parcelle no. 1085/10 à ul. 700ème Anniversaire du 36ème Anniversaire à 'nin. En outre, il est prévu de réglementer les installations de chauffage central dans tout le bâtiment, la révision de la sortie du site et la construction de routes et de places intérieures. Le changement du projet de construction d’origine a consisté en un changement dans l’utilisation des locaux et du plancher du bureau, résultant de la nécessité d’adapter l’installation aux nouvelles réglementations régissant les travaux et l’étendue des activités des installations ILOS. Le changement consiste en l’abandon de l’appartement protégé et l’utilisation de l’espace acquis pour les bureaux. Les conséquences de la nouvelle fonction sont les changements de façade insignifiants concernant deux fenêtres et un puits de ventilation supplémentaire et la construction — impliquant un linteau supplémentaire au-dessus de l’ouverture des fenêtres, ainsi que l’installation. Le projet de construction couvre la construction d’une sortie de la route municipale, mais ne relève pas de la présente étude. Il sera réalisé à une date ultérieure parallèlement à la modernisation de l’UL. 700e anniversaire.Le projet prévoit l’achat d’équipements et d’équipements. Ceux-ci comprennent:- ordinateurs de bureau (postes de travail) — 5 pièces.,- LAN,- meubles pour le bureau du psychologue, salle de réunion, salles de bureau, kitchenette, toilettes. (French)
    4 December 2021
    0 references
    Die von dem Projekt abgedeckten Investitionen sind Infrastrukturcharakter. Es besteht darin, die Nutzung eines Wohngebäudes in öffentliche Räume (Emergency Intervention Point, Beratungsstelle) zusammen mit der Erweiterung des Eingangsbereichs, die Renovierung der nördlichen und westlichen Fassaden des Hauptgebäudes und die Erwärmung der verbleibenden Fassade des kommunalen Sozialhilfezentrums innerhalb der Grenzen des Grundstücks Nr. 1085/10 bei ul. 700. Jahrestag des 36. Jahrestages in Żnin.Außerdem ist vorgesehen, Zentralheizungsanlagen im gesamten Gebäude zu regulieren, den Ausgang zur Baustelle zu überholen und Straßen und Innenflächen zu bauen. Die Änderung des ursprünglichen Bauvorhabens bestand in einer Änderung der Nutzung der Räumlichkeiten und des Fußbodens des Büros, die sich aus der Notwendigkeit ergibt, die Anlage an die neuen Vorschriften für die Arbeit und den Umfang der Tätigkeiten der IAOS-Anlagen anzupassen. Die Änderung besteht in der Aufgabe der geschützten Wohnung und der Nutzung des erworbenen Raumes für Büroflächen. Die Folge der neuen Funktion sind unbedeutende Fassadenveränderungen in Bezug auf zwei Fenster und eine zusätzliche Lüftungswelle und -konstruktion – mit einem zusätzlichen Sturz über der Fensteröffnung sowie der Installation. Das Bauvorhaben umfasst den Bau eines Ausstiegs aus der Gemeindestraße, fällt aber nicht in den Rahmen dieser Studie. Sie wird zu einem späteren Zeitpunkt zusammen mit der Modernisierung von ul durchgeführt. 700. Jahrestag.Das Projekt sieht den Kauf von Ausrüstung und Ausrüstung vor. Dazu gehören:- Desktop-Computer (Arbeitsstationen) – 5 Stk.,- LAN,- Möbel für das Büro des Psychologen, Tagungsraum, Büroräume, Kochnische, Toiletten. (German)
    14 December 2021
    0 references

    Identifiers

    RPKP.06.02.00-04-0011/19
    0 references