“Building of a photovoltaic farm on the Left Beach Wastewater Treatment Plant” (Q2692708)

From EU Knowledge Graph
Revision as of 06:33, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2692708 in Poland
Language Label Description Also known as
English
“Building of a photovoltaic farm on the Left Beach Wastewater Treatment Plant”
Project Q2692708 in Poland

    Statements

    0 references
    8,307,919.24 zloty
    0 references
    1,846,850.45 Euro
    0.2223 Euro
    0 references
    9,774,022.64 zloty
    0 references
    2,172,765.23 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 October 2018
    0 references
    31 May 2022
    0 references
    PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    0 references

    52°10'53.0"N, 18°12'55.4"E
    0 references
    ZAKRES RZECZOWY : Na konstrukcjach wsporczych zlokalizowanych na gruncie zamontowane zostanie 5940 szt. paneli fotowoltaicznych o mocy nominalnej 330 Wp, o łącznej mocy 1,96 MW. Wysokość konstrukcji naziemnych nie przekroczy 4 m. Budowy wiaty na osad odwodniony z instalacją fotowoltaiczną o łącznej mocy 222,75 kW wraz z niezbędną infrastrukturą elektroenergetyczną na terenie istniejącej Oczyszczalni Ścieków Lewy Brzeg. Na dachu wiaty na osad odwodniony zamontowane zostanie 675 szt. paneli fotowoltaicznych o mocy nominalnej 330 Wp. Montaż towarzyszącej infrastruktury elektroenergetycznej tj. instalacji niskiego napięcia, dwóch kontenerów technologicznych z transformatorami, konstrukcji wsporczych dla paneli PV, instalacji teletechnicznych, AKPiA i monitoringu oraz przyłączy kablowych SN. (Polish)
    0 references
    MATERIAL SCOPE: 5940 photovoltaic panels with a nominal power of 330 Wp, with a total capacity of 1.96 MW, will be installed on the supporting structures located on the ground. The height of ground structures will not exceed 4 m. Construction of a shelter for dehydrated sediment with a photovoltaic installation with a total power of 222,75 kW, together with the necessary electricity infrastructure in the existing Lewy Brzeg Wastewater Treatment Plant. 675 photovoltaic panels with a nominal power of 330 Wp will be installed on the roof of the drained sediment roof. Installation of associated electricity infrastructure, i.e. low-voltage installation, two process containers with transformers, supporting structures for PV panels, teletechnical installations, ACPiA and monitoring, and cable connections of the SN. (English)
    7 July 2021
    0 references
    CHAMP D’APPLICATION MATÉRIEL: 5940 panneaux photovoltaïques d’une puissance nominale de 330 Wp, d’une capacité totale de 1,96 MW, seront installés sur les structures de support situées au sol. La hauteur des structures au sol ne dépassera pas 4 m. La construction d’un abri pour sédiments déshydratés avec une installation photovoltaïque d’une puissance totale de 222,75 kW, ainsi que l’infrastructure électrique nécessaire dans la station existante de traitement des eaux usées de Lewy Brzeg. 675 panneaux photovoltaïques d’une puissance nominale de 330 Wp seront installés sur le toit du toit sédimentaire drainé. Installation d’infrastructures électriques associées, c’est-à-dire installation basse tension, deux conteneurs process avec transformateurs, structures de support pour panneaux photovoltaïques, installations télétechniques, ACPiA et surveillance, et connexions de câbles du SN. (French)
    3 December 2021
    0 references
    MATERIALUMFANG: 5940 Photovoltaik-Panels mit einer Nennleistung von 330 Wp mit einer Gesamtleistung von 1,96 MW werden auf den Stützkonstruktionen am Boden installiert. Die Höhe der Bodenstrukturen wird 4 m nicht überschreiten. Bau eines Schutzraums für dehydriertes Sediment mit einer Photovoltaikanlage mit einer Gesamtleistung von 222,75 kW sowie der notwendigen Strominfrastruktur in der bestehenden Kläranlage Lewy Brzeg. Auf dem Dach des abgetropften Sedimentdachs werden 675 Photovoltaik-Paneele mit einer Nennleistung von 330 Wp installiert. Installation der zugehörigen Strominfrastruktur, d. h. Niederspannungsinstallation, zwei Prozessbehälter mit Transformatoren, Stützkonstruktionen für PV-Panels, teletechnische Anlagen, ACPiA und Überwachung sowie Kabelanschlüsse der SN. (German)
    14 December 2021
    0 references

    Identifiers

    POIS.01.01.01-00-0006/18
    0 references