Černíkov – construction of a pool (Q71788)

From EU Knowledge Graph
Revision as of 06:29, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q71788 in Czech Republic
Language Label Description Also known as
English
Černíkov – construction of a pool
Project Q71788 in Czech Republic

    Statements

    0 references
    472,452.7 Czech koruna
    0 references
    18,898.11 Euro
    10 January 2020
    0 references
    472,452.7 Czech koruna
    0 references
    18,898.11 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    31 August 2020
    0 references
    xxx
    0 references
    0 references

    49°23'16.62"N, 13°3'30.17"E
    0 references
    34506
    0 references
    Výstavba průtočné tůně napouštěné z hlavního odvodňovacího zařízení v nezastavěném území obce Černíkov na trvalém travním porostu a neplodné půdě. (Czech)
    0 references
    Construction of a flow pool loaded from the main drainage facility in the unbuilt area of the village Černíkov on permanent grassland and barren soil. (English)
    23 October 2020
    0 references
    La construction d’un bassin d’écoulement rempli à partir de l’installation principale de drainage dans la zone non construite de la municipalité de Černíkov sur des prairies permanentes et des sols infertiles. (French)
    29 November 2021
    0 references
    Der Bau eines Flussbeckens gefüllt aus der Hauptentwässerungsanlage in der ungebauten Fläche der Gemeinde Černíkov auf Dauergrünland und unfruchtbarem Boden. (German)
    3 December 2021
    0 references
    De bouw van een stromingspool gevuld uit de belangrijkste drainage-installatie in het ongebouwde gebied van de gemeente Černíkov op blijvend grasland en onvruchtbare grond. (Dutch)
    14 December 2021
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/19_131/0010208
    0 references