Development of social activity of selected social groups by providing recreational areas along the city’s defensive walls (Q139047)

From EU Knowledge Graph
Revision as of 20:55, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q139047 in Poland
Language Label Description Also known as
English
Development of social activity of selected social groups by providing recreational areas along the city’s defensive walls
Project Q139047 in Poland

    Statements

    0 references
    1,812,801.28 zloty
    0 references
    435,072.31 Euro
    13 January 2020
    0 references
    3,296,002.39 zloty
    0 references
    791,040.57 Euro
    13 January 2020
    0 references
    55.0 percent
    0 references
    2 January 2020
    0 references
    31 March 2021
    0 references
    GMINA TRZEBIATÓW
    0 references
    Przedmiotem projektu jest zagospodarowanie na cele rekreacyjno-społeczne terenów podmiejskich położonych wzdłuż murów oraz wyremontowanie zabytkowych murów obronnych wzdłuż ulicy Krętej w Trzebiatowie. Teren zielony pomiędzy murem obronnym a brzegiem rzeki pełnił będzie rolę publicznej przestrzeni służącej rekreacji. Do tego celu zamontowana zostanie odpowiednia infrastruktura, w tym: plac zabaw dla dzieci małych, plac zabaw dla dzieci większych, siłownia zewnętrzna, ławki parkowe. Miejsce wyposażone zostanie również w elementy malej architektury, takie jak: kosze na śmieci, stojak rowerowy, trejaż, tablice informacyjne oraz oświetlenie. W ramach projektu wykonane zostaną również prace zabezpieczające i konserwatorskie murów obronnych. Realizację projektu podzielono na 4 zadania. Zad.1: Przygotowanie dokumentacji projektu; Zad. 2: Zagospodarowanie na cele rekreacyjne i społeczne terenów podmiejskich położonych wzdłuż murów obronnych; Zad.3: Usługi dotyczące kosztów nadzoru nad projektem; Zad.4.: Promocja projektu. Za realizację projektu odpowiedzialny będzie Wnioskodawca - Gmina Trzebiatów, która jednocześnie będzie zarządzała projektem. Bezpośrednio po zakończeniu realizacji projektu możliwe będzie wykorzystanie pełnej funkcjonalności infrastruktury poddanej rewitalizacji w ramach projektu. Przedsięwzięcie nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. (Polish)
    0 references
    The subject of the project is the development for recreational and social purposes of suburban areas located along the walls and the renovation of historic defensive walls along Kręta Street in Trzebiatow. The green area between the defensive wall and the riverbank will serve as a public recreation area. Appropriate infrastructure shall be installed for this purpose, including: children’s playground, larger children’s playground, outdoor gym, park benches. The space will also be equipped with small architectural elements such as: garbage bins, bicycle rack, treading, information boards and lighting. As part of the project, security and conservation works of defence walls will also be carried out. The project was divided into 4 tasks. Zad.1: Preparation of project documentation; It’s the ass. 2: Recreational and social development of suburban areas along the defensive walls; Zad.3: Services related to the cost of supervision of the project; Zad.4. Promotion of the project. The project will be carried out by the Applicant – the Municipality of Trzebiatów, who will manage the project simultaneously. Immediately after the completion of the project, it will be possible to use the full functionality of the infrastructure revitalised within the project. The project does not require additional action to make full use of it. (English)
    21 October 2020
    0 references
    L’objet du projet est le développement à des fins récréatives et sociales des zones suburbaines le long des murs et la rénovation des murs défensifs historiques le long de la rue Kręta à Trzebiatów. La zone verte entre le mur défensif et la rive de la rivière servira d’espace de loisirs public. Des infrastructures appropriées seront installées à cet effet, notamment: aire de jeux pour petits enfants, aire de jeux pour les plus grands, gymnase extérieure, bancs de parc. Le lieu sera également équipé d’éléments de petite architecture, tels que: poubelles, porte-vélos, treyage, panneaux d’information et éclairage. Le projet réalisera également des travaux de sécurité et de conservation pour les murs défensifs. La mise en œuvre du projet a été divisée en quatre tâches. Zad.1: Préparation de la documentation du projet; AWW. 2: Le développement récréatif et social des zones périurbaines le long des murs défensifs; Règle 3: Les services liés aux coûts de la supervision du projet; Zad.4.: Promotion du projet. Le projet sera mis en œuvre par la requérante, la municipalité de Trzebiatów, qui gérera le projet en même temps. Immédiatement après l’achèvement du projet, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure revitalisée dans le cadre du projet. Le projet n’exige pas de mesures supplémentaires pour en tirer pleinement parti. (French)
    3 December 2021
    0 references
    Gegenstand des Projekts ist die Entwicklung für Erholungs- und Gesellschaftszwecke der Vorstädte entlang der Mauern und die Renovierung der historischen Verteidigungsmauern entlang der Kręta-Straße in Trzebiatów. Die Grünfläche zwischen der Verteidigungsmauer und dem Flussufer dient als öffentlicher Erholungsraum. Zu diesem Zweck wird eine geeignete Infrastruktur installiert, u. a.: Spielplatz für kleine Kinder, Spielplatz für größere Kinder, Fitnessraum im Freien, Parkbänke. Der Ort wird auch mit Elementen kleiner Architektur ausgestattet sein, wie z. B.: Mülltonnen, Fahrradständer, Treyage, Informationstafeln und Beleuchtung. Das Projekt wird auch Sicherheits- und Erhaltungsarbeiten für die Verteidigungsmauern durchführen. Die Durchführung des Projekts wurde in 4 Aufgaben unterteilt. Zad.1: Vorbereitung der Projektdokumentation; AWW. 2: Erholung und soziale Entwicklung der peri-urbanen Gebiete entlang der Verteidigungsmauern; Regel 3: Dienstleistungen im Zusammenhang mit den Kosten der Projektüberwachung; Zad.4.: Förderung des Projekts. Das Projekt wird von der Klägerin, der Gemeinde Trzebiatów, durchgeführt, die das Projekt gleichzeitig verwalten wird. Unmittelbar nach Abschluss des Projekts wird es möglich sein, die volle Funktionalität der im Projekt neu belebten Infrastruktur zu nutzen. Das Projekt erfordert keine zusätzlichen Maßnahmen, um es in vollem Umfang zu nutzen. (German)
    13 December 2021
    0 references

    Identifiers

    RPZP.09.03.00-32-0008/18
    0 references