Implementation of innovations within the framework of the construction of the technological innovation plant together with the technical infrastructure in Nowy Czarnów (Q137313)

From EU Knowledge Graph
Revision as of 20:46, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q137313 in Poland
Language Label Description Also known as
English
Implementation of innovations within the framework of the construction of the technological innovation plant together with the technical infrastructure in Nowy Czarnów
Project Q137313 in Poland

    Statements

    0 references
    3,532,459.0 zloty
    0 references
    847,790.16 Euro
    13 January 2020
    0 references
    10,092,740.0 zloty
    0 references
    2,422,257.6 Euro
    13 January 2020
    0 references
    35.0 percent
    0 references
    14 July 2017
    0 references
    31 October 2018
    0 references
    "GOTECH" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    W ramach projektu wdrożona będzie „innowacyjna w skali świata technologia obrotowego spawania konstrukcji stalowych wykorzystywanych w branży Offshore” . Trzon projektu stanowi innowacyjna usługa polegająca na wykonaniu platform zewnętrznych do fundamentów morskich wież wiatrowych. Jednym z najważniejszych elementów platformy zewnętrznej jest pierścień skrzynkowy, który będzie wykonywany innowacyjną opracowaną przez dział B+R technologią spawania obrotowego. Kolejną usługą wdrażaną w ramach projektu będzie także usługa wytwarzania konstrukcj cumowniczej do fundamentów morskich wież wiatrowych (Boatlanding). Realizowany projekt obejmuje kod PKD 25.11. Z. Jest to kod PKD stanowiący jeden z filarów globalnego łańcucha wartości, ponieważ planowane do wprowadzenia usługi przeznaczone będą dla sektora wielkogabarytowych konstrukcji wodnych (fundamentów morskich wież wiatrowych, platform wiertniczych)takich jak: • Produkcja statków i konstrukcji pływających - 30.11.Z • Roboty związane z budową obiektów inżynierii wodnej – 42,91.Z Planowana inwestycja obejmuje budowę Zakładu Innowacji Technologicznych wraz z infrastrukturą techniczną w Nowym Czarnowie i polegać będzie na: budowie zespołu dwóch hal produkcyjnych wzajemnie połączonych konstrukcyjnie i komunikacyjnie oraz części dróg wewnątrz zakładowych i infrastruktury technicznej niezbędnych do funkcjonowania zakładu po realizacji projektu. Realizacja projektu obejmuje także zakup maszyn, urządzeń i oprogramowania w tym m.in.: Suwnice pomostowe 2 x Q=12,5 Mg oraz 2 x 25 Mg, Suwnica bramowa Q=12,5 Mg, Obrotowe urządzenie do spawania, Automat Spawalniczy, Oczyszczarka wirnikowa rolkowa, Głowica do wiercenia która jest integralną częścią wypalarki plazmowo- gazowej, Piła taśmowa półautomatyczna, Wiertarka bramowa, Ukosowarka do blach, Stanowisko komputerowe, Drukarka laserowa A3, Drukarka wielkoformatowa (ploter) oraz oprogramowanie biurowe, do zarzadzania projektami, projektowe i do plików pdf. (Polish)
    0 references
    The project will implement “innovative world-wide rotary welding technology for steel structures used in the Offshore industry”. The core of the project is an innovative service consisting of the construction of external platforms for the foundations of offshore wind towers. One of the most important elements of the external platform is the box ring, which will be made by the innovative R & D department with rotary welding technology. Another service implemented within the project will also be the production of mooring construction to the foundations of the offshore wind towers (Boatlanding). The project includes PKD code 25.11. Z. This is a PKD code which is one of the pillars of the global value chain, since the planned services will be intended for the sector of large water structures (maritime wind towers, drilling platforms) such as: • Manufacture of ships and floating structures – 30.11.Z • Works related to the construction of water engineering facilities – 42.91.Z The planned investment includes the construction of the Technology Innovation Plant together with the technical infrastructure in Nowy Czarnów and will consist of: construction of a complex of two production halls interconnected by construction and communication, as well as parts of roads within the plant and the technical infrastructure necessary for the operation of the plant after the project. The project also includes the purchase of machines, devices and software including: Bridge cranes 2 x Q=12.5 Mg and 2 x 25 Mg, gantry crane Q=12.5 Mg, Rotary welding machine, Welding machine, Roller rotor cleaner, Head for drilling which is an integral part of the plasma-gas burner, semi-automatic tape saw, gantry drilling, beacon for sheets, Computer stand, Laser design, laser printing machine, (English)
    21 October 2020
    0 references
    Le projet mettra en œuvre la «technologie innovante mondiale de soudage rotatif des structures en acier utilisées dans l’industrie offshore». Le cœur du projet est un service innovant consistant en l’exécution de plates-formes externes pour les fondations de tours d’éoliennes offshore. L’un des éléments les plus importants de la plate-forme externe est l’anneau de boîte, qui sera réalisé par la technologie de soudage rotative innovante développée par le département R & D. Un autre service à mettre en œuvre dans le cadre du projet sera également la production d’une structure d’amarrage pour les fondations de tours d’éoliennes en mer (Boatlanding). Le projet mis en œuvre comprend le code PKD 25.11. Z. Il s’agit du code PKD, qui est l’un des piliers de la chaîne de valeur mondiale, étant donné que les services prévus pour l’introduction seront consacrés au secteur des structures d’eau à grande échelle (fonds de tours éoliens maritimes, plates-formes de forage) tels que: • Fabrication de navires et de structures flottantes — 30.11.Z • Travaux liés à la construction de structures hydrauliques — 42,91.Z L’investissement prévu comprend la construction du département de l’innovation technologique ainsi que l’infrastructure technique de Nowy Czerwo et reposera sur: construction d’un complexe de deux halls de production interconnectés par la construction et la communication et des parties de routes intérieures et d’infrastructures techniques nécessaires à l’exploitation de l’usine après le projet. Le projet comprend également l’achat de machines, d’équipements et de logiciels, notamment: Grues aériennes 2 x Q=12,5 Mg et 2 x 25 Mg, Grue Gantry Q=12,5 Mg, Dispositif de soudage rotatif, Machine de soudage automatique, Nettoyeur à rotor à rouleaux, Tête de forage qui fait partie intégrante du brûleur à gaz plasma, scie à ruban semi-automatique, perceuse Gantry, bécher en tôle, stand informatique, imprimante laser A3, imprimante grand format (plaque) et logiciel de bureau, pour la gestion de projet, la conception et pour les fichiers pdf. (French)
    3 December 2021
    0 references
    Das Projekt wird die „Welt-innovative Technologie des Drehschweißens von Stahlkonstruktionen in der Offshore-Industrie“ implementieren. Kern des Projekts ist ein innovativer Service, der in der Ausführung externer Plattformen für die Fundamente von Offshore-Windtürmen besteht. Eines der wichtigsten Elemente der externen Plattform ist der Boxring, der von der innovativen Drehschweißtechnik der F & E-Abteilung durchgeführt wird. Ein weiterer Service, der im Rahmen des Projekts durchgeführt werden soll, ist auch die Herstellung einer Liegeplatzstruktur für die Fundamente von Offshore-Windtürmen (Boatlanding). Das umgesetzte Projekt beinhaltet PKD-Code 25.11. Z. Dies ist der PKD-Code, der eine der Säulen der globalen Wertschöpfungskette ist, da die für die Einführung geplanten Dienstleistungen dem Sektor der großen Wasserstrukturen (Maritime Windtürme Stiftungen, Bohrplattformen) gewidmet sind, wie z. B.: • Herstellung von Schiffen und schwimmenden Strukturen – 30.11.Z • Arbeiten im Zusammenhang mit dem Bau von Wasserbauten – 42,91.Z Die geplante Investition umfasst den Bau der Abteilung Technologieinnovation zusammen mit der technischen Infrastruktur in Nowy Czerwo und setzt auf: Bau eines Komplexes aus zwei Produktionshallen, die durch Bau und Kommunikation miteinander verbunden sind, sowie Teile von Innenstraßen und technischen Infrastrukturen, die für den Betrieb der Anlage nach dem Projekt erforderlich sind. Das Projekt umfasst auch den Kauf von Maschinen, Geräten und Software, einschließlich: Overhead Kräne 2 x Q=12,5 Mg und 2 x 25 Mg, Gantry Kran Q=12,5 Mg, Drehschweißgerät, Automatische Schweißmaschine, Rollrotorreiniger, Bohrkopf, ein integraler Bestandteil des Plasmagasbrenners, Halbautomatische Bandsäge, Gantry-Bohrmaschine, Blechbecher, Computerständer, A3-Laserdrucker, Großformatdrucker (Ploter) und Bürosoftware, für Projektmanagement, Design und für PDF-Dateien. (German)
    13 December 2021
    0 references

    Identifiers

    RPZP.01.05.00-32-0030/17
    0 references