‘Installation of a renewable energy source using only agricultural biogas for electricity generation, i.e. gas obtained by methane fermentation of agricultural raw materials, agricultural by-products, liquid or solid animal faeces, by-products, waste or residues from the processing of agricultural products or forest biomass collected from other lands (Q137827)

From EU Knowledge Graph
Revision as of 20:39, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q137827 in Poland
Language Label Description Also known as
English
‘Installation of a renewable energy source using only agricultural biogas for electricity generation, i.e. gas obtained by methane fermentation of agricultural raw materials, agricultural by-products, liquid or solid animal faeces, by-products, waste or residues from the processing of agricultural products or forest biomass collected from other lands
Project Q137827 in Poland

    Statements

    0 references
    9,985,293.2 zloty
    0 references
    2,396,470.37 Euro
    13 January 2020
    0 references
    12,481,616.5 zloty
    0 references
    2,995,587.96 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    14 September 2018
    0 references
    31 December 2019
    0 references
    WIND GRUPA ADJ SP. Z O.O.
    0 references
    0 references
    W ramach realizacji projektu Wnioskodawca WIND GRUPA ADJ Sp. z o.o. wybudować instalację odnawialnych źródeł energii – biogazownię o mocy 0,8 MW. Inwestycja jest zlokalizowana w gminie Sławoborze, obręb Stare Ślepce, działka nr 8. Wnioskodawca posiada prawo do dysponowania nieruchomością na okres realizacji oraz trwałości projektu – umowa dzierżawy. Ponadto należy wskazać, że Wnioskodawca posiada komplet dokumentów niezbędnych do realizacji inwestycji (dokumentację środowiskową oraz pozwolenie na budowę). Jednocześnie mając na uwadze konieczność wykazania środków niezbędnych do realizacji projektu Wnioskodawca uzyskał promesę kredytową . Realizacja przedmiotowej inwestycji została wpisana do Planu Gospodarki Niskoemisyjnej Gminy Sławoborze. Okres realizacji inwestycji został określony: 01.08.2017 – 30.03.2019 r. W ramach projektu zostało przewidziane 1 Zadanie Budowa instalacji OZE – Biogazownia. (Polish)
    0 references
    As part of the project, the Applicant WIND GRUPA ADJ Sp. z o.o. to build a plant for renewable energy sources – a biogas plant with a capacity of 0.8 MW. The investment is located in the municipality of Sławobor, the area of Stare Ślepce, plot no. 8. The applicant has the right to dispose of the property for the period of implementation and durability of the project – a lease agreement. Furthermore, it should be pointed out that the applicant has a set of documents necessary for the implementation of the investment (environmental documentation and construction permit). At the same time, in view of the need to demonstrate the resources necessary for the implementation of the project, the applicant received a credit promotion. The implementation of this investment was included in the Low-Emission Economy Plan of the Municipality of Sławobor. The period of implementation of the investment was determined: 01.08.2017-30.03.2019. The project included 1 RES installation – Biogas plant. (English)
    21 October 2020
    0 references
    Dans le cadre de la mise en œuvre du projet, la requérante WIND GRUPA ADJ Sp. z o.o. doit construire une installation de sources d’énergie renouvelables — une usine de biogaz d’une capacité de 0,8 MW. L’investissement est situé dans la municipalité de Sławobor, la zone de Stare Ślepce, parcelle no 8. Le demandeur a le droit de disposer du bien pour la période de mise en œuvre et de durabilité du projet — un contrat de bail. En outre, il convient de noter que la requérante dispose d’un ensemble de documents nécessaires à la mise en œuvre de l’investissement (documentation environnementale et permis de construire). Dans le même temps, compte tenu de la nécessité de démontrer les ressources nécessaires à la mise en œuvre du projet, la requérante a obtenu un engagement de prêt. La mise en œuvre de cet investissement a été incluse dans le plan de gestion à faibles émissions de la municipalité de Sławobor. La période de mise en œuvre de l’investissement a été définie: 01.08.2017-30.03.2019 1 Tâche pour les SER — Construction d’usines de biogaz était prévue dans le cadre du projet. (French)
    2 December 2021
    0 references
    Im Rahmen der Projektdurchführung baut die Klägerin WIND GRUPA ADJ Sp. z o.o. eine Anlage erneuerbarer Energiequellen – eine Biogasanlage mit einer Leistung von 0,8 MW. Die Investition befindet sich in der Gemeinde Sławobor, dem Gebiet von Stare Ślepce, Grundstück Nr. 8. Der Antragsteller hat das Recht, die Immobilie für den Zeitraum der Durchführung und Dauerhaftigkeit des Projekts – einen Mietvertrag – zu veräußern. Darüber hinaus ist darauf hinzuweisen, dass der Antragsteller über eine Reihe von Unterlagen verfügt, die für die Durchführung der Investition erforderlich sind (Umweltdokumentation und Baugenehmigung). Gleichzeitig hat die Klägerin unter Berücksichtigung der Notwendigkeit, die für die Durchführung des Projekts erforderlichen Mittel nachzuweisen, ein Darlehensunternehmen erhalten. Die Umsetzung dieser Investition wurde in den emissionsarmen Bewirtschaftungsplan der Gemeinde Sławobor aufgenommen. Der Zeitraum für die Durchführung der Investition wurde festgelegt: 01.08.2017-30.03.2019 1 Aufgabe für RES – Biogasanlagenbau war im Rahmen des Projekts vorgesehen. (German)
    13 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-B253/17
    0 references