Construction of a 986 kW photovoltaic farm with the necessary technical infrastructure and connection to the power grid in Pomierzn (Q137742)

From EU Knowledge Graph
Revision as of 20:37, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q137742 in Poland
Language Label Description Also known as
English
Construction of a 986 kW photovoltaic farm with the necessary technical infrastructure and connection to the power grid in Pomierzn
Project Q137742 in Poland

    Statements

    0 references
    1,707,433.93 zloty
    0 references
    409,784.14 Euro
    13 January 2020
    0 references
    2,134,292.43 zloty
    0 references
    512,230.18 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    10 September 2018
    0 references
    29 March 2019
    0 references
    ALFA FRUIT SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIĄ
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o mocy 0,986 MW Pomierzynie na działkach o ew. nr 88/1 i 88/3. Projekt ma charakter stacjonarny i będzie składał się z jednego etapu polegającego na budowie farmy. W ramach realizacji projektu Wnioskodawca dokona zakupu kompletnej instalacji fotowoltaicznej z niezbędnymi elementami, tj. konstrukcji do paneli, paneli oraz inwerterów. Zgodnie z aktualnym projektem planuje się zainstalowanie 3 944 sztuk paneli, każdy o mocy 250W, tj. 3960x250W=986000W. W związku z faktem, iż fotowoltaika jest relatywnie nową dziedziną, w stałym procesie rozwoju i udoskonalania, Wnioskodawca jest w stanie zagwarantować jedynie moc zainstalowaną czyli 0,986 MW jako niezmienny parametr projektowanej farmy, jednak ilość i moc poszczególnych paneli fotowoltaicznych może ulec zmianie, tak, aby suma mocy zainstalowanych paneli nie przekroczyła 0,986 MW. Wynika to ze stale trwających prac dot. zwiększenia produktywności i efektywności paneli (np. W ciągu ostatnich dwóch lat standardowy panel dostępny na rynku zmienił swój parametr określający moc z wartości 230W na 250W, nie zmieniając tym samym wymiarów panela). Ponadto w celu rozpoczęcia produkcji energii elektrycznej Wnioskodawca zaplanował niezbędne z punktu widzenia prace w obrębie infrastruktury elektrycznej, takie jak: komunikacja parku, łączność, telemechanika, stacja transformatorowo - rozdzielcza nN / SN, pozostała infrastruktura elektroenergetyczna, instalacja wewnętrzna nN - trasy kablowe, instalacja zewnętrzna SN - trasa kablowa. Projekt obejmuje też wydatki związane z budową drogi, ogrodzeniem, systemem alarmowym i monitoringiem oraz zakupem tablicy informacyjnej i pamiątkowej. W wyniku projektu Wnioskodawca rozpocznie produkcję energii elektrycznej ze słońca, dzięki czemu możliwe będzie osiągnięcie określonych w we wniosku wskaźników rezultatu. Na dzień składania wniosku pozyskano wszystkystkie niezbędne zezwolenia do rozpoczęcia inwestycji. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic farm with a capacity of 0.986 MW Measurements on plots with possible 88/1 and 88/3. The project is stationary and will consist of one stage of the construction of a farm. As part of the project, the applicant will purchase a complete photovoltaic installation with the necessary elements, i.e. structures for panels, panels and inverters. According to the current project, 3 944 panels are planned to be installed, each with a capacity of 250 W, i.e. 3960x250W=986000W. Due to the fact that photovoltaics is a relatively new field, in a continuous process of development and improvement, the applicant is only able to guarantee the installed capacity of 0,986 MW as the unchanged parameter of the planned farm, but the number and power of individual photovoltaic panels may change, so that the total power of the installed panels does not exceed 0,986 MW. This is due to ongoing work on increasing productivity and efficiency of panels (e.g. Over the last two years, the standard panel available on the market has changed its power parameter from 230 W to 250 W without changing the dimensions of the panel). In addition, in order to start electricity production, the applicant has planned the necessary work within the electricity infrastructure, such as: park communication, communication, telemechanics, transformer and distribution station nN/SN, remaining power infrastructure, internal installation nN – cable routes, external installation of SN – cable route. The project also covers expenses related to the construction of the road, fence, alarm system and monitoring, as well as the purchase of an information and commemorative plaque. As a result of the project, the applicant will start producing electricity from the sun, so that the result indicators specified in the proposal can be achieved. At the date of submission of the application, all necessary permits were obtained for the start of the investment. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’une ferme photovoltaïque d’une capacité de 0,986 MW Mesure sur les parcelles 88/1 et 88/3. Le projet est stationnaire et consistera en une seule étape consistant en la construction d’une ferme. Dans le cadre de la mise en œuvre du projet, la requérante achètera une installation photovoltaïque complète avec les éléments nécessaires, à savoir la construction de panneaux, panneaux et onduleurs. Selon le projet actuel, il est prévu d’installer 3 944 panneaux, chacun d’une capacité de 250 W, c’est-à-dire 3960x250W=986000W. Étant donné que le photovoltaïque est un domaine relativement nouveau dans le processus de développement et d’amélioration continus, la requérante n’est en mesure de garantir que la capacité installée de 0,986 MW en tant que paramètre inchangé de l’exploitation prévue, mais le nombre et la capacité des différents panneaux solaires peuvent changer de manière à ce que la capacité totale des panneaux installés ne dépasse pas 0,986 MW. Cela est dû aux travaux en cours visant à accroître la productivité et l’efficacité des panneaux (p. ex. Au cours des deux dernières années, le panneau standard disponible sur le marché a changé son paramètre de puissance de 230 W à 250 W, sans modifier les dimensions du panneau). En outre, afin de commencer la production d’électricité, la requérante a planifié les travaux nécessaires sur l’infrastructure électrique, tels que: parc de communication, communication, Télémécanique, poste de transformateur et de distribution nN/SN, autre infrastructure électrique, installation interne nN — routes de câbles, installation externe de SN — route de câble. Le projet couvre également les dépenses liées à la construction de routes, de clôtures, de systèmes d’alarme et de surveillance, ainsi que l’achat d’informations et de tableaux commémoratifs. À la suite du projet, la requérante commencera à produire de l’électricité à partir du soleil afin que les indicateurs de résultat spécifiés dans la demande puissent être atteints. À la date de dépôt de la demande, toutes les autorisations nécessaires ont été obtenues pour démarrer l’investissement. (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist der Bau eines Photovoltaikbetriebs mit einer Leistung von 0,986 MW Messung auf Grundstücken z. B. 88/1 und 88/3. Das Projekt ist stationär und besteht aus einer einzigen Phase, die aus dem Bau eines Bauernhofes besteht. Im Rahmen der Projektdurchführung wird der Antragsteller eine komplette Photovoltaik-Anlage mit den notwendigen Elementen erwerben, d. h. Bau für Paneele, Paneele und Wechselrichter. Nach dem aktuellen Projekt ist geplant, 3 944 Paneele mit einer Kapazität von 250 W, d. h. 3 944 Panels, zu installieren. 3960x250W=986000W. Da Photovoltaik ein relativ neues Feld im kontinuierlichen Entwicklungs- und Verbesserungsprozess ist, kann der Antragsteller nur die installierte Leistung von 0,986 MW als unveränderten Parameter des geplanten Betriebs garantieren, aber die Anzahl und Leistung einzelner Solarmodule können sich ändern, so dass die Gesamtkapazität der installierten Paneele 0,986 MW nicht überschreitet. Dies ist auf die laufenden Arbeiten zur Steigerung der Produktivität und Effizienz von Platten (z. In den letzten zwei Jahren hat das auf dem Markt verfügbare Standardpanel seinen Leistungsparameter von 230 W auf 250 W geändert, ohne die Plattenabmessungen zu ändern. Darüber hinaus hat die Klägerin zur Aufnahme der Stromerzeugung die notwendigen Arbeiten an der Elektrizitätsinfrastruktur geplant, wie z. B.: Parkkommunikation, Kommunikation, Telemechanika, Transformator und Verteilerstation nN/SN, sonstige Strominfrastruktur, interne Installation nN – Kabelwege, externe Installation der SN – Kabelroute. Das Projekt deckt auch Ausgaben für den Straßenbau, den Zaun, das Alarmsystem und die Überwachung sowie den Erwerb von Informationen und Gedenktafeln ab. Als Ergebnis des Projekts wird der Antragsteller mit der Erzeugung von Strom aus der Sonne beginnen, damit die im Antrag angegebenen Ergebnisindikatoren erreicht werden können. Zum Zeitpunkt der Einreichung des Antrags wurden alle erforderlichen Genehmigungen für den Beginn der Investition erhalten. (German)
    13 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-B041/17
    0 references