Requalification and Modernisation of the facilities of the Cerva Basic School, Ribeira de Pena (Q2899326)

From EU Knowledge Graph
Revision as of 19:58, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2899326 in Portugal
Language Label Description Also known as
English
Requalification and Modernisation of the facilities of the Cerva Basic School, Ribeira de Pena
Project Q2899326 in Portugal

    Statements

    0 references
    164,810.0 Euro
    0 references
    193,894.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 July 2019
    0 references
    MUNICÍPIO DE RIBEIRA DE PENA
    0 references
    0 references

    41°27'45.25"N, 7°51'4.75"W
    0 references
    Esta operação visa a substituição da cobertura fibrocimento existente e que neste momento representam um perigo para a saúde da comunidade e a construção de passadiços que ligam o edifício principal ao pavilhão da escola de forma a resguardar os alunos da chuva, junto e este passadiço será construído um abrigo/paragem de forma permitir a saída e entrada em segurança dos alunos nos transportes escolares. (Portuguese)
    0 references
    This operation aims to replace the existing fibrocement cover, which at the moment poses a danger to the health of the community and the construction of walkways that connect the main building to the school pavilion in order to protect the students from the rain, together with this walkway will be built a shelter/stop in order to allow the students to exit and safely enter the school transports. (English)
    8 July 2021
    0 references
    L’objectif de cette opération est de remplacer le toit d’amiante-ciment existant qui présente actuellement un danger pour la santé de la communauté et la construction de passerelles reliant le bâtiment principal au pavillon scolaire afin de protéger les élèves de la pluie, ainsi que la construction d’un abri/arrêt pour permettre aux élèves de partir et d’entrer en toute sécurité dans le transport scolaire. (French)
    5 December 2021
    0 references
    Ziel dieser Operation ist es, das vorhandene Asbestzementdach zu ersetzen, das derzeit eine Gefahr für die Gesundheit der Gemeinde und den Bau von Gehwegen darstellt, die das Hauptgebäude mit dem Schulpavillon verbinden, um die Schüler vor dem Regen zu schützen, zusammen mit diesem Gehweg wird ein Schutzraum/Stopp gebaut, um den Schülern zu ermöglichen, sich sicher im Schultransport zu verlassen und zu betreten. (German)
    13 December 2021
    0 references
    Ribeira de Pena, União das freguesias de Cerva e Limões
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000136
    0 references