Improved Gouveia Interface (Q2878153)

From EU Knowledge Graph
Revision as of 11:27, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2878153 in Portugal
Language Label Description Also known as
English
Improved Gouveia Interface
Project Q2878153 in Portugal

    Statements

    0 references
    207,225.0 Euro
    0 references
    243,794.0 Euro
    0 references
    85.0 percent
    0 references
    26 March 2018
    0 references
    31 December 2018
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references
    Q2991041 (Deleted Item)
    0 references

    40°29'38.44"N, 7°35'30.41"W
    0 references
    Melhoria do Interface de Transportes de Gouveia através da Construção de um Interface complementar à Central de Transportes existente, assim como a recuperação exterior do edifício da Central de Transportes e espaço imediatamente contíguo. (Portuguese)
    0 references
    Improvement of the Gouveia Transport Interface through the construction of a complementary interface to the existing Central Transportation Centre, as well as the external recovery of the Central Transport Building and immediately adjoining space. (English)
    7 July 2021
    0 references
    Amélioration de l’interface de transport Gouveia grâce à la construction d’une interface complémentaire au Centre de transport existant, ainsi qu’à la restauration externe du bâtiment central des transports et de l’espace immédiatement adjacent. (French)
    4 December 2021
    0 references
    Verbesserung der Verkehrsschnittstelle Gouveia durch den Bau einer ergänzenden Schnittstelle zum bestehenden Verkehrszentrum sowie die externe Restaurierung des zentralen Verkehrsgebäudes und unmittelbar angrenzende Räume. (German)
    13 December 2021
    0 references
    Gouveia, União das freguesias de Gouveia (São Pedro e São Julião)
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000026
    0 references