Improved Gouveia Interface (Q2878153)
Jump to navigation
Jump to search
Project Q2878153 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Improved Gouveia Interface |
Project Q2878153 in Portugal |
Statements
207,225.0 Euro
0 references
243,794.0 Euro
0 references
85.0 percent
0 references
26 March 2018
0 references
31 December 2018
0 references
MUNICÍPIO DE GOUVEIA
0 references
Q2991041 (Deleted Item)
0 references
Melhoria do Interface de Transportes de Gouveia através da Construção de um Interface complementar à Central de Transportes existente, assim como a recuperação exterior do edifício da Central de Transportes e espaço imediatamente contíguo. (Portuguese)
0 references
Improvement of the Gouveia Transport Interface through the construction of a complementary interface to the existing Central Transportation Centre, as well as the external recovery of the Central Transport Building and immediately adjoining space. (English)
7 July 2021
0 references
Amélioration de l’interface de transport Gouveia grâce à la construction d’une interface complémentaire au Centre de transport existant, ainsi qu’à la restauration externe du bâtiment central des transports et de l’espace immédiatement adjacent. (French)
4 December 2021
0 references
Verbesserung der Verkehrsschnittstelle Gouveia durch den Bau einer ergänzenden Schnittstelle zum bestehenden Verkehrszentrum sowie die externe Restaurierung des zentralen Verkehrsgebäudes und unmittelbar angrenzende Räume. (German)
13 December 2021
0 references
Gouveia, União das freguesias de Gouveia (São Pedro e São Julião)
0 references
Identifiers
CENTRO-09-1406-FEDER-000026
0 references