ATHLETICS (Q1895717)
Jump to navigation
Jump to search
Project Q1895717 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ATHLETICS |
Project Q1895717 in Italy |
Statements
50,000.0 Euro
0 references
50,000.0 Euro
0 references
100.0 percent
0 references
1 September 2017
0 references
15 October 2018
0 references
17 October 2018
0 references
IS "FERMI" CATANZARO
0 references
IL PROGETTO ATLETICA OUTDOOR PER CRESCERE IN ARMONIA PREVEDE LA REALIZZAZIONE DI UN IMPIANTO DI ATLETICA COSTITUITO DA UN RETTILINEO A TREQUATTRO CORSIE DI ADEGUATA PEDANA PER SALTI IN ESTENSIONE ED ELEVAZIONE E DI UNA FOSSA CADUTA SALTI. LA REALIZZAZIONE DELLIMPIANTO E LIMPLEMENTAZIONE DELLE ATTIVIT DIDATTICHE AD ESSO CONNESSE DI PARTICOLARE IMPORTANZA IN QUANTO CONSENTIREBBE IL RISPETTO DELLE INDICAZIONI MINISTERIALI PER IL LICEO SPORTIVO LE QUALI PREVEDONO LO STUDIO DELLATLETICA LEGGERA SIA NEL PRIMO CHE NEL SECONDO BIENNIO. ATTUALMENTE INFATTI LISTITUTO E. FERMI FORNITO DI PALESTRA MA NON DI STRUTTURE IDONEE ALLA PRATICA DELLA SPECIALIT E LIMPIANTO PI VICINO 300 M CIRCA DATO IN GESTIONE AD UNA SOCIET PRIVATA CHE NON CONCEDE IL SUO UTILIZZO AD ALTRI ENTI. (Italian)
0 references
THE ATHLETICS PROJECT TO GROW IN HARMONY REQUIRES THE ESTABLISHMENT OF AN ATHLETICS FACILITY BUILT UP BY A STRAIGHT TRACK TO ATTRACT AN APPROPRIATE BUS LANE TO EXPAND AND RAISE THE LANES AND A PIT. THE CONSTRUCTION OF THE INSTALLATION AND THE ASSOCIATED EDUCATIONAL PROCEDURES OF PARTICULAR IMPORTANCE IN THAT IT PERMITS OBSERVANCE OF THE MINISTERIAL GUIDELINES FOR THE SECONDARY SCHOOL IN RESPECT OF THE SECONDARY SCHOOL IN QUESTION, BOTH IN THE FIRST TWO YEARS AND IN THE SECOND TWO YEARS. AT PRESENT, THE NUMBER OF DETENTIONS PROVIDED, BUT NOT OF FACILITIES SUITABLE FOR THE PRACTICE OF SPECIALIT AND LIMANTO PI CLOSE TO 300 M, WHICH IS ABOUT THE MANAGEMENT OF A PRIVATE COMPANY WHICH DOES NOT GRANT ITS USE TO OTHER BODIES. (English)
0 references
LE PROJET D’ATHLÉTISME EXTÉRIEUR POUR GRANDIR EN HARMONIE IMPLIQUE LA RÉALISATION D’UNE USINE D’ATHLÉTISME COMPOSÉE D’UNE DROITE AVEC TROIS-QUATRE VOIES DE PLATE-FORME ADÉQUATE POUR LES SAUTS EN EXTENSION ET EN ÉLÉVATION ET DE SAUTS EN FOSSE DE CHUTE. LA RÉALISATION DE L’USINE ET LA MISE EN ŒUVRE DES ACTIVITÉS ÉDUCATIVES Y AFFÉRENTES D’UNE IMPORTANCE PARTICULIÈRE EN CE QU’ELLE PERMETTRAIT LE RESPECT DES INDICATIONS MINISTÉRIELLES POUR LES SPORTS DU LYCÉE QUI PRÉVOIENT L’ÉTUDE DE LA LUMIÈRE DELTLETICA DANS LES DEUX PREMIÈRES ET LES DEUXIÈMES ANNÉES. ACTUELLEMENT, L’INSTITUT E. FERRIS DISPOSE D’UN GYMNASE, MAIS PAS D’INSTALLATIONS ADAPTÉES À LA PRATIQUE DE LA SPÉCIALITÉ ET DE L’USINE PI DE PRÈS DE 300 M SOUS GESTION À UNE ENTREPRISE PRIVÉE QUI N’ACCORDE PAS SON UTILISATION À D’AUTRES ORGANISMES. (French)
10 December 2021
0 references
Identifiers
E66J17000850007
0 references