NEW TEACHING WAY (Q1888294)

From EU Knowledge Graph
Revision as of 15:58, 10 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q1888294 in Italy
Language Label Description Also known as
English
NEW TEACHING WAY
Project Q1888294 in Italy

    Statements

    0 references
    21,999.0 Euro
    0 references
    21,999.0 Euro
    0 references
    100.0 percent
    0 references
    28 July 2016
    0 references
    31 May 2017
    0 references
    IISS BENEDETTO RADICE
    0 references

    37°47'13.78"N, 14°50'1.82"E
    0 references
    PREMESSA LA PRESENTE PROPOSTA PROGETTUALE SI INSERISCE PIENAMENTE IN UN PROGETTO MOLTO PI AMPIO CHE DA QUALCHE ANNO VIENE PORTATO AVANTI NELLA NOSTRA ISTITUZIONE SCOLASTICA. SIN DALLA.S. 20112012 LA NOSTRA ISTITUZIONE HA INTRAPRESO LA STRADA CHE CI PORTER ALLA PIENA E COMPLETA DIGITALIZZAZIONE E DEMATERIALIZZAZIONE. TALE PROCESSO STATO SUDDIVISO IN STEP SUCCESSIVI E STA TUTTORA PROCEDENDO. QUASI TUTTA LA SCUOLA STATA CABLATA TUTTI GLI AMBIENTI SONO CONNESSI VIA CAVO POSTAZIONI FISSE E VIA WIFI POSTAZIONI MOBILI ALLA RETE PRINCIPALE. LA COPERTURA TOTALE ED EFFICIENTE SAR RAGGIUNTA CON LAGGIUNTA DI UN CORE ULTRAVELOCE NUOVI HOTSPOT AC E UN SERVER NUOVO CHE SOSTITUIR QUELLO ESISTENTE PER I SERVIZI INTERNI E WEB CON IL PON LANWLAN 10.8.1.A1 E 10.8.1.A2. IN PARALLELO TRAMITE TELECOM CHE GI CI FORNISCE UNA CONNETTIVIT ADSL CON DUE LINEE A 20MBIT. STIAMO CERCANDO DI AVERE UNA CONNESSIONE ULTRAVELOCE IN FIBRA. QUESTO CI DAR LA STRUTTURA NECESSARIA PER OPERARE APPIENO UNA DIDATTICA DIGITALE (Italian)
    0 references
    THE INTRODUCTION OF THIS PROPOSAL IS FULLY IN LINE WITH A VERY EXTENSIVE PROJECT THAT HAS BEEN TAKEN FORWARD IN OUR SCHOOL INSTITUTION FOR A FEW YEARS. SINCE DALLA.S. 20112012, OUR INSTITUTION HAS STARTED THE WAY FOR US TO COMPLETE THE DIGITISATION AND DEMATERIALISATION. THIS PROCESS HAS BEEN DIVIDED INTO SUCCESSIVE STAGES AND IS STILL IN THE PROCESS OF DOING SO. NEARLY ALL WIRED SCHOOLS ARE CONNECTED BY CABLE WITH FIXED STATIONS AND WIFI LOCATIONS IN THE CORE NETWORK. THE TOTAL AND EFFICIENT SAR COVERAGE ACHIEVED WITH THE ADDITION OF A NEW CORE OF THE NEW CA HOTSPOT AND A NEW SERVER THAT IS TO PROVIDE THE EXISTING ONE FOR THE INTERNAL AND WEB SERVICES WITH THE NOP LANWLAN 10.8.1.A1 AND 10.8.1.A2. IN PARALLEL WITH TELECOM THAT GI PROVIDES US WITH TWO LINES AT 20MBIT ADSL. WE ARE TRYING TO GET VERY HIGH FIBRE INTO FIBRE. WE NEED TO DO THIS IN ORDER TO MAKE THE MOST OF A DIGITAL EDUCATION. (English)
    0 references
    SUR LA BASE DE CETTE PROPOSITION DE PROJET S’INSCRIT PLEINEMENT DANS UN TRÈS GRAND PROJET PI QUI A ÉTÉ RÉALISÉ DANS NOTRE ÉTABLISSEMENT SCOLAIRE DEPUIS QUELQUES ANNÉES. DEPUIS FALLA.S. 20112012 NOTRE INSTITUTION A PRIS LA VOIE QUE PORTER NOUS VERS LA NUMÉRISATION ET LA DÉMATÉRIALISATION COMPLÈTE ET COMPLÈTE. CE PROCESSUS A ÉTÉ DIVISÉ EN ÉTAPES SUCCESSIVES ET CONTINUE DE PROGRESSER. PRESQUE TOUTE L’ÉCOLE A ÉTÉ CÂBLÉE TOUS LES ENVIRONNEMENTS SONT DES STATIONS FIXES CÂBLÉES ET VIA DES STATIONS MOBILES WIFI VERS LE RÉSEAU PRINCIPAL. LA COUVERTURE SAR TOTALE ET EFFICACE GRÂCE À L’AJOUT D’UN NOYAU ULTRARAPIDE DE NOUVEAUX HOTSPOTS AC ET D’UN NOUVEAU SERVEUR QUI REMPLACE LE SERVEUR EXISTANT POUR LES SERVICES INTERNES ET WEB PAR LE PON LANWLAN 10.8.1.A1 ET 10.8.1.A2. PARALLÈLEMENT À TELECOM QUI NOUS FOURNIT DÉJÀ UNE CONNEXION ADSL AVEC DEUX LIGNES À 20MBIT. NOUS ESSAYONS D’AVOIR UNE CONNEXION PAR FIBRE ULTRARAPIDE. CELA NOUS DONNE LA STRUCTURE NÉCESSAIRE POUR EXPLOITER PLEINEMENT UNE DIDACTIQUE NUMÉRIQUE (French)
    10 December 2021
    0 references

    Identifiers