IC IG ISLAND NEW NETWORK WITH WREDWIRELESS CABLING (Q1862464)

From EU Knowledge Graph
Revision as of 09:14, 10 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q1862464 in Italy
Language Label Description Also known as
English
IC IG ISLAND NEW NETWORK WITH WREDWIRELESS CABLING
Project Q1862464 in Italy

    Statements

    0 references
    18,500.0 Euro
    0 references
    18,500.0 Euro
    0 references
    100.0 percent
    0 references
    9 February 2016
    0 references
    19 August 2016
    0 references
    13 December 2016
    0 references
    I.C. ISOLA DEL G. S. -COLLEDARA
    0 references
    0 references

    42°30'11.02"N, 13°39'34.27"E
    0 references
    SI INTENDE ATTUARE IL PROGETTO CON LA REALIZZAZIONE DI UN NUOVO CABLAGGIO ATTRAVERSO UNA SOLUZIONE IBRIDA CHE PREVEDE LUTILIZZO DELLINTERCONNESSIONE WIRED IN RAME UNITA ALLA CONNESSIONE WIFILINTERVENTO VOLTO A GARANTIRE UN ADEGUATO LIVELLO PRESTAZIONALE E DI AFFIDABILIT OPERATIVA A TUTTI GLI AMBIENTI SCOLASTICI SIANO ESSI DIDATTICI CHE AMMINISTRATIVI (Italian)
    0 references
    THE INTENTION IS TO IMPLEMENT THE PROJECT BY IMPLEMENTING A NEW CABLING THROUGH A HYBRID SOLUTION INVOLVING THE USE OF COPPER WIRED IN COMBINATION WITH THE WFILINTERVENTION CONNECTION TO ENSURE AN ADEQUATE PERFORMANCE LEVEL AND AFFIDABILIT TO ALL EDUCATIONAL ENVIRONMENTS, BOTH EDUCATIONAL AND ADMINISTRATIVE (English)
    0 references
    IL EST DESTINÉ À METTRE EN ŒUVRE LE PROJET AVEC LA RÉALISATION D’UN NOUVEAU CÂBLAGE À TRAVERS UNE SOLUTION HYBRIDE QUI IMPLIQUE L’UTILISATION DE CUIVRE CÂBLÉ INTERCONNESSION COMBINÉ AVEC LA CONNEXION WIFILINTERVENTO VISANT À ASSURER UN NIVEAU ADÉQUAT DE PERFORMANCE ET DE FIABILITÉ OPÉRATIONNELLE À TOUS LES ENVIRONNEMENTS ÉDUCATIFS ET ADMINISTRATIFS (French)
    10 December 2021
    0 references

    Identifiers