PEDESTRIAN AND CYCLING ITINERARY IN AC116.MEIRÁS-AC114 (PQ 6+ 500/12+ 030) NARÓN AND VALDOVIÑO (Q3229926)

From EU Knowledge Graph
Revision as of 07:57, 10 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q3229926 in Spain
Language Label Description Also known as
English
PEDESTRIAN AND CYCLING ITINERARY IN AC116.MEIRÁS-AC114 (PQ 6+ 500/12+ 030) NARÓN AND VALDOVIÑO
Project Q3229926 in Spain

    Statements

    0 references
    694,794.94 Euro
    0 references
    868,493.68 Euro
    0 references
    80.0 percent
    0 references
    28 March 2019
    0 references
    31 December 2021
    0 references
    AGENCIA GALLEGA DE INFRAESTRUCTURAS (AXI)
    0 references
    0 references
    0 references

    43°30'3.96"N, 8°11'32.32"W
    0 references
    15054
    0 references
    Se proyecta una senda peatonal y ciclista, con un itinerario a lo largo del margen derecho de la carretera autonómica AC-116, entre los 6+500 – 12+030 (aproximadamente), en los ayuntamientos de Narón y Valdoviño._x000D_ De este modo, se ejecuta un itinerario continuo, que se une a diversos tramos de acera ya existentes, a lo largo de una zona en la que existe una importante presencia de edificación en todo el recorrido, dando lugar a un itinerario continuo y permitiendo la comunicación de toda esta zona de asentamientos entre sí y con los principales equipamientos municipales y los servicios del entorno. (Spanish)
    0 references
    A pedestrian and cyclist path is planned, with an itinerary along the right bank of the AC-116 autonomous highway, between 6 + 500 - 12 + 030 (approximately), at the town halls of Narón and Valdoviño._x000D_ In this way, a continuous itinerary is executed, which joins several existing sidewalk sections, along an area where there is an important building presence throughout the route, giving rise to a continuous itinerary and allowing the communication of this entire settlement area with each other and with the main municipal facilities and the surrounding services. (English)
    0 references
    Un sentier piétonnier et cycliste est prévu, avec un itinéraire le long de la rive droite de l’AC-116, entre les 6+ 500-12+ 030 (environ), dans les communes de Narón et Valdoviño._x000D_ Ainsi, un itinéraire continu, qui relie les différentes sections du trottoir existant déjà, le long d’une zone où il y a une importante présence de construction tout au long de l’itinéraire, donnant lieu à un itinéraire continu et permettant la communication de toute cette zone de peuplement entre eux et avec les principales installations municipales et les services de l’environnement. (French)
    5 December 2021
    0 references
    Ein Fußgänger- und Radweg ist geplant, mit einer Route entlang des rechten Ufers des AC-116, zwischen dem 6+ 500-12+ 030 (ungefähr), in den Gemeinden Narón und Valdoviño._x000D_ So wird eine durchgehende Route geführt, die verschiedene Abschnitte des bereits bestehenden Bürgersteigs entlang eines Gebiets entlang der gesamten Strecke verbindet, das zu einer kontinuierlichen Route führt und die Kommunikation dieses ganzen Siedlungsgebiets untereinander sowie mit den wichtigsten kommunalen Einrichtungen und den Dienstleistungen der Umwelt ermöglicht. (German)
    10 December 2021
    0 references
    Narón
    0 references

    Identifiers

    603-2019000004
    0 references