Construction of the Gołanice, Jezierzyce Kościelne, Włoszakowice line and the organisation of transfer points in the area of Leszczyński County as part of the task of reducing low emissions in the Leszczyńska Agglomeration (Q134896)

From EU Knowledge Graph
Revision as of 07:10, 9 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q134896 in Poland
Language Label Description Also known as
English
Construction of the Gołanice, Jezierzyce Kościelne, Włoszakowice line and the organisation of transfer points in the area of Leszczyński County as part of the task of reducing low emissions in the Leszczyńska Agglomeration
Project Q134896 in Poland

    Statements

    0 references
    6,723,265.04 zloty
    0 references
    1,613,583.61 Euro
    13 January 2020
    0 references
    7,909,723.6 zloty
    0 references
    1,898,333.66 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 May 2016
    0 references
    31 December 2019
    0 references
    POWIAT LESZCZYŃSKI
    0 references
    0 references
    Przedmiotem projektu jest budowa 9,953km ciągu pieszo-rowerowego na odcinku Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice wraz z organizacją 8 miejsc przesiadkowych zlokalizowanych w Święciechowie, Gołanicach, Jezierzycach Kościelnych, na Krzyżowcu, we Włoszakowicach, Boszkowie-Letnisku, Pawłowicach, Oporowie, na terenie dworca PKP w Lesznie ustawione zostaną stojaki rowerowe. W 6 miejscach przesiadkowych zamontowanie zostanie efektywne energetycznie oświetlenie o mocy do 40kW. W ramach projektu zaplanowano budowę systemu organizacji ruchu, czyli stworzenie aplikacji pozwalającej na wyszukiwanie dogodnych połączeń komunikacyjnych na terenie pow. leszczyńskiego i m.Leszna. W związku z tym, że ważne jest także pobudzanie świadomości i odpowiedzialności społecznej za jakość powietrza, budowie tras dla rowerów towarzyszyć będą działania informacyjne i promocyjne skierowane do mieszkańców powiatu leszczyńskiego i leszczyńskiego obszaru funkcjonalnego. Ma to na celu wzmocnienie wśród mieszkańców poczucia konieczności akceptacji działań prowadzących do ograniczenia zanieczyszczeń powietrza, emitowanych głównie przez środki transportu samochodowego. Wszystkie prace zaplanowane w projekcie są niezbędne, aby osiągnąć zakładane cele projektu. Zaplanowane działania, będą realizowane zgodnie ze wskazaniami dokumentacji projektowej, co pozwoli na zachowanie jakości oraz trwałości. W ramach zadania nastąpi również wypłata odszkodowań tytułem nabycia prawa własności nieruchomości przeznaczonych pod budowę ciągu pieszo-rowerowego. W ramach projektu osiągnięte zostaną następujące wskaźniki produktu: 1. Długość wybudowanych dróg dla rowerów – 9.953km (2019r.) 2. Liczba wybudowanych zintegrowanych węzłów przesiadkowych-8 szt. (2019r.) 3. Liczba akcji i kampanii informacyjno – promocyjnych- 1 szt. (2019r.) 4. Liczba nowych/ zmodernizowanych punktów świetlnych-6 szt.(2019r.). (Polish)
    0 references
    The object of the project is the construction of 9.953 km of walking-bike line on the Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice section, together with the organisation of 8 transfer places located in Święciechów, Gołanice, Jezierzyce Kościelnych, Tearow, Włoszakowice, Boszków-Letnisko, Pawłowice, Oporów, at the railway station in Leszno. Energy-efficient lighting up to 40 kW will be installed in 6 interchange points. As part of the project, the construction of a traffic organisation system was planned, i.e. the creation of an application allowing to search for convenient communication connections in the area of Leszczyński and Leszna. As it is also important to stimulate awareness and social responsibility for air quality, the construction of cycling routes will be accompanied by information and promotion measures aimed at residents of the Leszno and Leszno functional area. This is intended to strengthen the sense of acceptance among residents of the measures leading to the reduction of air pollution, mainly emitted by means of motor transport. All the work planned in the project is necessary to achieve the project’s objectives. The planned activities will be implemented in accordance with the indications of the design documentation, which will allow for the preservation of quality and durability. As part of the task, compensation will also be paid for the acquisition of property rights intended for the construction of a foot-bike line. The project will achieve the following output indicators: 1. Length of built roads for bicycles – 9.953 km (2019 years) 2. Number of built integrated interchange nodes-8 pcs. (2019) 3. Number of campaigns and information – promotional campaigns – 1 pcs. (2019) 4. Number of new/upgraded light points – 6 pcs (2019). (English)
    21 October 2020
    0 references
    Le projet a pour objet la construction d’un parcours pédestre et cyclable de 9 953 km sur le tronçon Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice, ainsi que l’organisation de 8 lieux de transfert situés à Święciechów, Gołanice, Jezierzyce Kościelne, Teutonic Knights, Włoszakowice, Boszków-Letnisk, Pawłowice, Oporów, et à la gare de Leszno. Un éclairage économe en énergie pouvant atteindre 40 kW sera installé dans 6 lieux de transfert. Dans le cadre du projet, la construction d’un système d’organisation du trafic a été prévue, c’est-à-dire la création d’une application permettant de rechercher des liaisons de transport pratiques dans les zones de Leszno et de Lesno. Étant donné qu’il est également important d’encourager la sensibilisation et la responsabilité sociale en matière de qualité de l’air, la construction de pistes cyclables s’accompagnera de mesures d’information et de promotion à l’intention des habitants du quartier de Leszczyński et de la zone fonctionnelle de Leszno. L’objectif est de renforcer le sentiment d’acceptation par les résidents des mesures visant à réduire la pollution atmosphérique, principalement émise par les transports routiers. Tous les travaux prévus dans le projet sont nécessaires pour atteindre les objectifs du projet. Les activités prévues seront réalisées conformément à la documentation du projet, qui préservera la qualité et la durabilité. Dans le cadre de cette tâche, une compensation sera également versée pour l’acquisition de la propriété d’un bien immobilier destiné à la construction d’un parcours piétonnier-vélo. Le projet permettra d’obtenir les indicateurs de réalisation suivants: 1. Longueur des routes construites pour vélos — 9,953 km (2019) 2. Nombre de moyeux intégrés construits-8 pcs. (2019) 3. Nombre de campagnes et de campagnes d’information — promotionnels — 1 pcs. (2019) 4. Nombre de points lumineux neufs/modernisés-6 pcs.(2019). (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist der Bau einer 9,953 km langen Wander- und Radroute auf dem Abschnitt Gołanice-Jezierzyce Kościelne-Krzyżowiec-Włoszakowice sowie die Organisation von 8 Transferplätzen in Święciechów, Gołanice, Jezierzyce Kościelne, Teutonic Knights, Włoszakowice, Boszków-Letnisk, Pawłowice, Oporów und am Bahnhof in Leszno. An 6 Transferplätzen wird eine energieeffiziente Beleuchtung von bis zu 40 kW installiert. Im Rahmen des Projekts wurde der Bau eines Verkehrsorganisationssystems geplant, d. h. die Erstellung einer Anwendung, die die Suche nach bequemen Verkehrsanbindungen in den Bereichen Leszno und Lesno ermöglicht. Da es auch wichtig ist, das Bewusstsein und die soziale Verantwortung für die Luftqualität zu fördern, wird der Bau von Fahrradrouten mit Informations- und Absatzförderungsmaßnahmen für die Bewohner des Bezirks Leszczyński und des Funktionsgebiets Leszno einhergehen. Ziel ist es, das Gefühl der Akzeptanz von Maßnahmen zur Verringerung der Luftverschmutzung unter den Bewohnern zu stärken, die vor allem durch den Straßenverkehr ausgestrahlt werden. Alle im Rahmen des Projekts geplanten Arbeiten sind zur Erreichung der Projektziele erforderlich. Die geplanten Maßnahmen werden in Übereinstimmung mit der Projektdokumentation durchgeführt, die Qualität und Nachhaltigkeit bewahrt. Im Rahmen der Aufgabe wird auch für den Erwerb des Eigentums an Immobilien, die für den Bau einer Fußgänger-Route bestimmt sind, eine Entschädigung gezahlt. Mit dem Projekt werden folgende Outputindikatoren erreicht: 1. Länge der bebauten Straßen für Fahrräder – 9,953 km (2019) 2. Anzahl der integrierten Hubs gebaut-8 Stk. (2019) 3. Anzahl der Kampagnen und Informationskampagnen – Promotion – 1 Stk. (2019) 4. Anzahl der neuen/modernisierten Lichtpunkte-6 Stk.(2019). (German)
    9 December 2021
    0 references

    Identifiers

    RPWP.03.03.01-30-0019/16
    0 references