Construction of a photovoltaic farm by the company BOB Energetyk in Olsztyn. (Q132011)

From EU Knowledge Graph
Revision as of 06:45, 9 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q132011 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic farm by the company BOB Energetyk in Olsztyn.
Project Q132011 in Poland

    Statements

    0 references
    6,997,130.0 zloty
    0 references
    1,679,311.2 Euro
    13 January 2020
    0 references
    8,746,412.5 zloty
    0 references
    2,099,139.0 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    30 April 2019
    0 references
    30 August 2019
    0 references
    BOB ENERGETYK SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references
    Inwestycja objęta niniejszym projektem polega na budowie elektrowni fotowoltaicznej o mocy 1,66 MW,na działce nr 28/9 obręb 45 przy ul. Sielskiej w Olsztynie. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1 - instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika) - do 2 MWe/MWth. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła celom komercyjnym – wytworzeniem energii elektrycznej w celu sprzedaży do sieci OSD. Projekt spełnia warunki SzOOP w zakresie posiadania ważnych warunków technicznych podłączenia elektrowni do sieci. Dnia 29.09.2017.r. zostały wydane przez Energa Operator S.A. warunki przyłączenia do sieci dla elektrowni. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Niniejszy projekt ze względu na krótki okres realizacji przewiduje 1 etap, którym zakłada budowę naziemnej elektrowni fotowoltaicznej z wykorzystaniem technologii polikrystalicznej do produkcji energii elektrycznej. Inwestycja polega na montażu 4129 paneli fotowoltaicznych (polikrystalicznych), w elektrowni o łącznej mocy 1,66 MW połączonych w samodzielne układy wraz z falownikami, z niezbędnym okablowaniem i osprzętem. W ramach przedmiotowego projektu będą realizowane wyłącznie roboty budowlane i będzie przeprowadzone jedno postępowanie. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie wykorzystywana w celach komercyjnych i w 100% będzie wprowadzona do sieci elektroenergetycznej w celu odsprzedaży. (Polish)
    0 references
    The investment covered by this project consists of the construction of a photovoltaic power plant with a capacity of 1,66 MW, on plot No 28/9 of 45 at ul. Sielska in Olsztyn. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. The installation in accordance with the possibility described in the SzOOP will serve commercial purposes – generating electricity for sale to the OSD network. The project meets the requirements of the SzOOP for having important technical conditions for connecting the power plant to the network. On 29.09.2017.r. were issued by Energa Operator S.A. the conditions of connection to the network for power plants. The project meets all the shore conditions specified in the SHOOP RPO WiM 2014-2020. Due to the short implementation period, this project envisages the construction of a terrestrial photovoltaic power plant using polycrystalline technology to produce electricity. The investment consists of the assembly of 4129 photovoltaic (polycrystalline) panels in power plants with a total capacity of 1.66 MW combined into independent systems with inverters, with the necessary wiring and fittings. Under this project, only works will be carried out and a single procedure will be carried out. The power plant will be connected to the grid, but there will be no need to install batteries and charge regulators, as the network is able to absorb all the energy produced by the photovoltaic system. The electricity produced will be used for commercial purposes and 100 % will be introduced into the electricity grid for resale. (English)
    21 October 2020
    0 references
    L’investissement couvert par ce projet consiste en la construction d’une centrale photovoltaïque d’une capacité de 1,66 MW, sur le terrain no 28/9, volume 45 à ul. À Olsztyn. Le projet s’inscrit dans le type de projet figurant dans la norme SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations d’énergie solaire (par exemple, capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. Selon la possibilité décrite dans SzOOP, l’installation servira à des fins commerciales — produire de l’électricité en vue de la vente au réseau de GRD. Le projet répond aux exigences de SzOOP en ce qui concerne l’existence de conditions techniques importantes pour le raccordement des centrales électriques au réseau. Le 29 septembre 2017, Energa Operator S.A. a émis les conditions de raccordement au réseau de la centrale électrique. Le projet répond à toutes les conditions limites fixées dans le SzOOP ROP WiM 2014-2020. En raison de la courte période de mise en œuvre, ce projet prévoit la construction d’une centrale photovoltaïque au sol utilisant la technologie polycristalline pour produire de l’électricité. L’investissement consiste en l’installation de 4129 panneaux photovoltaïques (polycristallins) dans une centrale d’une puissance totale de 1,66 MW reliée à des systèmes autonomes avec onduleurs, avec le câblage et les accessoires nécessaires. Seuls les travaux de construction seront réalisés dans le cadre de ce projet et une procédure sera réalisée. La centrale électrique sera raccordée au réseau, mais il n’y aura pas besoin d’installer des batteries et des régulateurs de charge, car le réseau est capable d’absorber toute l’énergie produite par le système photovoltaïque. L’électricité produite sera utilisée à des fins commerciales et sera alimentée à 100 % dans le réseau électrique en vue de sa revente. (French)
    2 December 2021
    0 references
    Die Investition, die Gegenstand dieses Projekts ist, besteht in dem Bau eines Photovoltaik-Kraftwerks mit einer Leistung von 1,66 MW auf dem Grundstück Nr. 28/9, Band 45 bei ul. In Olsztyn. Das Projekt passt in den im SzOOP ROP WiM 2014-2020 aufgeführten Projekttyp für Maßnahme 4.1 – Solarenergieanlagen (z. B. Solarkollektoren, Photovoltaik) – bis zu 2 MWe/MWth. Gemäß der in SzOOP beschriebenen Möglichkeit dient die Anlage kommerziellen Zwecken – Stromerzeugung zum Verkauf an das Netz der Fernleitungsnetzbetreiber. Das Projekt erfüllt die Anforderungen von SzOOP in Bezug auf wichtige technische Bedingungen für den Anschluss von Kraftwerken an das Netz. Am 29.09.2017 erteilte Energa Operator S.A. die Netzanschlussbedingungen für das Kraftwerk. Das Projekt erfüllt alle im SzOOP ROP WiM 2014-2020 festgelegten Randbedingungen. Aufgrund des kurzen Umsetzungszeitraums sieht dieses Projekt den Bau eines bodengebundenen Photovoltaik-Kraftwerks vor, das polykristalline Technologien zur Stromerzeugung nutzt. Die Investition besteht in der Installation von 4129 Photovoltaik-Panels (Polykristalline) in einem Kraftwerk mit einer Gesamtleistung von 1,66 MW, die in Stand-alone-Anlagen mit Wechselrichtern verbunden ist, mit der notwendigen Verdrahtung und Zubehör. Im Rahmen dieses Projekts werden nur Bauarbeiten durchgeführt und ein Verfahren durchgeführt. Das Kraftwerk wird an das Netz angeschlossen, aber es wird keine Notwendigkeit geben, Batterien und Laderegler zu installieren, da das Netz in der Lage ist, die gesamte von der Photovoltaik-Anlage erzeugte Energie zu absorbieren. Der erzeugte Strom wird für kommerzielle Zwecke verwendet und wird zu 100 % für den Weiterverkauf in das Stromnetz eingespeist. (German)
    9 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0420/17
    0 references