Extension of sanitary sewage system – Stage V and extension and reconstruction of the water supply network in Miedziana Góra Municipality (Q127762)

From EU Knowledge Graph
Revision as of 09:36, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q127762 in Poland
Language Label Description Also known as
English
Extension of sanitary sewage system – Stage V and extension and reconstruction of the water supply network in Miedziana Góra Municipality
Project Q127762 in Poland

    Statements

    0 references
    11,615,124.18 zloty
    0 references
    2,787,629.80 Euro
    13 January 2020
    0 references
    14,518,905.23 zloty
    0 references
    3,484,537.26 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    7 January 2016
    0 references
    30 June 2022
    0 references
    GMINA MIEDZIANA GÓRA
    0 references
    Celem projektu jest zwiększenie odsetka ludności korzystającego z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych.Zostanie zrealizowany Etap V bud. kanaliz. sanit.(Zadania 1 do 5) w msc.Porzecze, Bobrza, Przyjmo i część Ćmińska dł.25,09 km w tym:22,20 km kanały grawitacyjne,2,37 km kanały tłoczne,0,52 km kanał ciśnieniowy.Wybudowanych zostanie 5 przepompowni sieciowych i 9 przepompowni przydomowych.Zakupione zostanie urządzenie ciśnieniowe czyszczące z zamontowanym zestawem do kamerowania rur. Rozbudowana zostanie sieć wodociągowa na dł. 1,7 km, oraz wymieniona sieć wodociągowa w msc.Bobrza,Przyjmo,Ćmińsk na dł. 8,00 km (Zadania 1 do 6).Wyremontowane zostaną 3 zbiorniki retencyjne,zakupiony zostanie agregat prądotwórczy do stacji wodociągowej. Uwzględniono rob.powtórzeniowe dla sieci kan. i wodociąg. oraz koszty zarządz.projektem,koszty oprac.dokument. projekt.w tym SW i zakup działek.Realizacja Etapu V pozwoli uzyskać wskaźnik skanalizowania gminy na terenie aglomeracji w wysokości 100%.Nad robotami sprawowany będzie nadzór inwestorski i autorski.Zapewnimy promocję projektu,a nad prawidłową realizacją będzie czuwał zespół projektowy (pracownicy UG).Zostaną osiągnięte nast. wskaźniki: Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków (RLM) (CI 19)-2.283,Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę (osoby) (CI 18)-1135,Długość wybudowanej kanalizacji sanitarnej (km)–25,09, Długość wybudowanej sieci wodociągowej (km)-1,70,Długość przebudowanej sieci wodociągowej (km)-8,00.Nie przewiduje się:obiektów dostosowanych do potrzeb osób z niepełnosprawnościami, szkoleń w zakresie kompetencji cyfrowych,kosztów racjonalnych usprawnień dla osób z niepełnosprawnościami,wzrostu zatrudnienia we wspieranych przedsiębiorstwach EPC i wspieranych podmiotach EPC,liczby utrzymanych miejsc pracy EPC i nowo utworzonych miejsc pracy EPC. (Polish)
    0 references
    The aim of the project is to increase the percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water.The aim of the project is to increase the percentage of the population using sewage treatment system in accordance with the directive on municipal wastewater.The Stage V bud. sanit.(Tasks 1 to 5) in the Ministry of Economy.Power, beaver, reception and part of Ćmińska tubes length 25.09 km including:22.20 km of gravitational channels, 2.37 km of pressurised channels,0,52 km of pressure channel will be completed. The water supply system will be extended. 1.7 km, and replaced water supply network in the city.Bob, accept,Ćminsk for long. 8.00 km (Tasks 1 to 6). 3 retention tanks will be repaired, a power generator for a water station will be purchased. Additional work for the sewer and water supply network and the management costs of the project, project costs. project.including SW and purchase of plots.The implementation of Stage V will provide an indicator of the scanning of the municipality in the agglomeration area of 100 %.The works will be supervised by investors and authors.We will ensure the promotion of the project, and the project team will be supervised by the project. Number of additional persons benefiting from improved waste water treatment (CI 19)-2.283,Number of additional persons benefiting from improved water supply (persons) (CI 18)-1135,Length of built sanitary sewage system (km)-25.09, Length of built-up water supply network (km)-1,70,Length of the remodeled water supply network (km)-8.00,The length of the efficiency of the e-services is not provided for: (English)
    21 October 2020
    0 references
    L’objectif du projet est d’augmenter le pourcentage de la population utilisant le système de traitement des eaux usées conformément à la directive sur les eaux urbaines résiduaires. Phase V de la construction des égouts. assainissement. (tâches 1 à 5) à msc.Porzecze, Bobrza, réception et une partie de la station d’égouts 25,09 km dans tym:22,20 km conduits gravitationnels, 2,37 km canaux de décharge, 0,52 km canal de pression. 5 stations de pompage réseau et 9 stations de pompage arrière seront construits. Le réseau d’approvisionnement en eau sera étendu. 1,7 km, et le réseau d’adduction d’eau répertorié à msc.Bobrza,obje, 8,00 km (tâches 1 à 6). 3 réservoirs de rétention seront rénovés, un générateur d’énergie sera acheté pour la station d’alimentation en eau. Les indicateurs suivants seront pris en compte pour le réseau de canettes et d’approvisionnement en eau. ainsi que les coûts de gestion.projet, les coûts du projet.Document de projet.y compris SW et l’achat de parcelles.La mise en œuvre de la phase V permettra d’obtenir un taux d’assainissement de la commune dans la zone de l’agglomération de 100 %.Les indicateurs suivants seront atteints: Nombre de personnes supplémentaires utilisant un traitement amélioré des eaux usées (RLM) (CI 19)-2.283,Nombre de personnes supplémentaires utilisant un approvisionnement en eau amélioré (personnes) (CI 18)-1135,Longueur des égouts sanitaires construits (km)-25,09,Longueur du réseau d’approvisionnement en eau construit (km)-1,70,longueur du réseau d’approvisionnement en eau reconstruit (km)-8,00.Ne prévoit pas się:obiektów adapté aux besoins des personnes handicapées, formation en matière de compétences numériques, coût d’aménagement raisonnable pour les personnes handicapées, augmentation de l’emploi dans les entreprises EPC soutenues et entités EPC soutenues, nombre d’emplois FTE maintenus et nouvellement créés. (French)
    2 December 2021
    0 references
    Ziel des Projekts ist es, den Anteil der Bevölkerung, die das Abwasserbehandlungssystem gemäß der kommunalen Abwasserrichtlinie nutzt, zu erhöhen. Stufe V des Gebäudes der Kanalisation. Abwasserentsorgung.(Aufgaben 1 bis 5) in msc.Porzecze, Bobrza, Empfang und Teil von Ćmińska 25,09 km in tym:22,20 km Gravitationskanäle, 2,37 km Ableitungskanäle, 0,52 km Druckkanal. 5 Netzpumpenstationen und 9 Hinterhof-Pumpstationen werden gebaut. Das Wasserversorgungsnetz wird erweitert. 1,7 km und das gelistete Wasserversorgungsnetz in msc.Bobrza,obje,Ćmińsk für lange Zeit. 8,00 km (Aufgaben 1 bis 6). 3 Aufbewahrungstanks werden renoviert, ein Stromerzeuger wird für die Wasserversorgungsstation gekauft. Die folgenden Indikatoren werden für das Netz der Dosen und der Wasserversorgung sowie die Kosten für die Verwaltung.Projekt, die Kosten des Projekts.Projektdokument.einschließlich SW und Kauf von Grundstücken berücksichtigt.Die Umsetzung von Stufe V ermöglicht es, eine Abwasserrate der Gemeinde im Bereich der Ballungsräume von 100 % zu erhalten.Die folgenden Indikatoren werden erreicht: Zahl der zusätzlichen Personen, die eine verbesserte Abwasserbehandlung (RLM) (CI 19)-2.283,Anzahl der zusätzlichen Personen, die eine verbesserte Wasserversorgung (Personen) (CI 18)-1135,Länge der sanitären Abwasserentsorgung (km)-25,09,Länge des gebauten Wasserversorgungsnetzes (km)-1,70,Länge des wiederaufgebauten Wasserversorgungsnetzes (km)-8,00 nutzen. (German)
    8 December 2021
    0 references

    Identifiers

    RPSW.04.03.00-26-0001/17
    0 references