Modernisation of heat sources in single-family construction in the Miedźna commune (Q123692)

From EU Knowledge Graph
Revision as of 07:14, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q123692 in Poland
Language Label Description Also known as
English
Modernisation of heat sources in single-family construction in the Miedźna commune
Project Q123692 in Poland

    Statements

    0 references
    0 references
    2,077,974.62 zloty
    0 references
    498,713.91 Euro
    13 January 2020
    0 references
    2,444,676.02 zloty
    0 references
    586,722.24 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 April 2016
    0 references
    30 June 2018
    0 references
    GMINA MIEDŹNA
    0 references
    0 references

    49°58'37.9"N, 19°3'1.1"E
    0 references
    Przedmiotem projektu będzie instalacja paneli solarnych na budynkach mieszkalnych na terenie Gminy Miedźna (sołectwa Frydek, Gilowice, Góra, Grzawa, Miedźna, Wola). Realizacja projektu obejmować będzie: zaprojektowanie 205 instalacji, montaż instalacji oraz jej podłączenie, nadzór inwestorski i techniczny. Celem projektu jest: ograniczenie dotychczasowego zużycia produkowanej przemysłowo energii oraz ochrona środowiska naturalnego poprzez ograniczenie emisji pyłów i gazów (SO2, NOX, CO, CO2) dzięki wykorzystaniu łatwo dostępnego i niewyczerpywanego źródła energii słonecznej. W ramach projektu planowany jest montaż 617 szt. kolektorów słonecznych za pomocą 205 szt. instalacji solarnych. Projektem zostanie objętych 205 budynków mieszkalnych w Gminie Miedźna. Realizacja projektu, dzięki ograniczeniu tradycyjnego sposobu pozyskiwania ciepła, przyczyni się do poprawy stanu środowiska naturalnego, stanu zdrowia ludzi, zaspokajając zapotrzebowanie na energię cieplną. (Polish)
    0 references
    The subject of the project will be the installation of solar panels on residential buildings in the Miedźna commune (Frydek, Gilowice, Góra, Grzawa, Miedźna, Wola). The implementation of the project will include: design of 205 installations, installation and connection, investor and technical supervision. The aim of the project is to: reduce existing consumption of industrially produced energy and protect the environment by reducing emissions of dust and gases (SO2, NOX, CO, CO2) through the use of an easily accessible and non-exhaustive source of solar energy. As part of the project, 617 solar collectors are planned to be installed using 205 solar installations. The project will cover 205 residential buildings in the Miedźna Municipality. The implementation of the project, by reducing the traditional way of obtaining heat, will contribute to improving the state of the environment, the state of health of people, satisfying the demand for heat. (English)
    21 October 2020
    0 references
    Le projet aura pour objet l’installation de panneaux solaires sur des bâtiments résidentiels dans la municipalité de Miedžna (villages de Frydek, Gilowice, Góra, Grzawa, Miedźna, Wola). La mise en œuvre du projet comprendra: conception de 205 installations, installation et raccordement, investisseur et supervision technique. L’objectif du projet est de: réduire la consommation d’énergie industrielle existante et protéger l’environnement en réduisant les émissions de poussières et de gaz (SO2, NOX, CO, CO2) en utilisant une source d’énergie solaire facilement accessible et non exhaustive. Dans le cadre du projet, il est prévu d’installer 617 capteurs solaires utilisant 205 installations solaires. Le projet couvrira 205 bâtiments résidentiels dans la municipalité de Copper. La mise en œuvre du projet, en réduisant la méthode traditionnelle de production de chaleur, contribuera à améliorer l’état de l’environnement naturel, l’état de la santé humaine et la satisfaction de la demande d’énergie thermique. (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist die Installation von Solarpaneelen auf Wohngebäuden in der Gemeinde Miedźna (Frydek, Gilowice, Góra, Grzawa, Miedźna, Wola). Die Durchführung des Projekts umfasst: Entwurf von 205 Installationen, Installation und Anschluss, Investor und technische Überwachung. Ziel des Projekts ist es, Verringerung des bestehenden industriell erzeugten Energieverbrauchs und Schutz der Umwelt durch Verringerung der Staub- und Gasemissionen (SO2, NOX, CO, CO2) durch Nutzung einer leicht zugänglichen und nicht erschöpfenden Solarenergiequelle. Im Rahmen des Projekts ist die Installation von 617 Solarkollektoren mit 205 Solaranlagen geplant. Das Projekt umfasst 205 Wohngebäude in der Gemeinde Copper. Die Durchführung des Projekts, indem die traditionelle Methode der Wärmeerzeugung reduziert wird, wird dazu beitragen, den Zustand der natürlichen Umwelt, den Zustand der menschlichen Gesundheit zu verbessern und den Bedarf an Wärmeenergie zu befriedigen. (German)
    8 December 2021
    0 references

    Identifiers

    RPSL.04.01.01-24-02AF/16
    0 references