Construction of sanitary sewage system and replacement of water supply from AC pipes with PE pipes in Parzymiechy – stage II (Q124220)

From EU Knowledge Graph
Revision as of 07:04, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q124220 in Poland
Language Label Description Also known as
English
Construction of sanitary sewage system and replacement of water supply from AC pipes with PE pipes in Parzymiechy – stage II
Project Q124220 in Poland

    Statements

    0 references
    999,982.8 zloty
    0 references
    239,995.87 Euro
    13 January 2020
    0 references
    2,426,553.76 zloty
    0 references
    582,372.9 Euro
    13 January 2020
    0 references
    41.21 percent
    0 references
    4 June 2019
    0 references
    28 December 2019
    0 references
    GMINA LIPIE
    0 references
    0 references

    51°0'45.7"N, 18°47'49.9"E
    0 references
    Projekt polega na budowie sieci kanalizacji sanitarnej oraz wymianie wodociągu z rur AC na rury PE w miejscowości Parzymiechy - w ramach II etapu kanalizacji niniejszej miejscowości. Przedsięwzięcie obejmuje: Zadanie 1. Roboty budowlane: kanalizacja sanitarna: - Sieć kanalizacji sanitarnej - Przyłącza kanalizacyjne - Rurociąg tłoczny - Przepompownia ścieków P3 - Roboty odtworzeniowe Zadanie 2. Roboty budowlane: wymiana wodociągu z rur AC na rury PE: - Sieć wodociągowa - Przepięcia przyłączy wodociągowych. W wyniku realizacji projektu ścieki z gospodarstw domowych będą odprowadzane do biologiczno - mechanicznej oczyszczalni ścieków, oddanej do użytku w 2005r. o przepust. 500 m3/dobę, zlokalizowanej w Lipiu. Po zakończeniu inwestycji zwiększy się udział ludności gminy Lipie korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą 91/271/EWG, a w konsekwencji nastąpi zmniejszenie zanieczyszczenia środowiska naturalnego (zwłaszcza wód). (Polish)
    0 references
    The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English)
    21 October 2020
    0 references
    Le projet consiste en la construction d’un réseau d’assainissement sanitaire et le remplacement de l’approvisionnement en eau des conduites AC aux conduites PE à Parzymiechy — dans le cadre de la deuxième phase d’assainissement de cette ville. Le projet comprend: Activité 1. Travaux de construction: assainissement: — Réseau d’assainissement sanitaire — Connexions d’assainissement — Tuyau comprimé — Station de pompage des eaux usées P3 — Travaux de remise en état Tâche 2. Travaux de construction: remplacement des tuyaux AC par des tuyaux PE: — Réseau d’approvisionnement en eau — Débordement des connexions d’approvisionnement en eau. À la suite de ce projet, les eaux usées ménagères seront déversées dans une station d’épuration biologique et mécanique des eaux usées, mise en service en 2005 pour un ponceau. 500 m³/jour, situé à Lipia. Une fois l’investissement achevé, la part de la population de la commune de Lipie utilisant le système de traitement des eaux usées conformément à la directive 91/271/CEE augmentera et, par conséquent, la pollution de l’environnement (en particulier l’eau) sera réduite. (French)
    2 December 2021
    0 references
    Das Projekt besteht aus dem Bau eines sanitären Kanalisationsnetzes und dem Austausch der Wasserversorgung von AC-Rohren zu PE-Rohren in Parzymiechy – als Teil der zweiten Kanalisationsstufe dieser Stadt. Das Projekt umfasst: Aktivität 1. Bauarbeiten: Sanitärversorgung: — Sanitär Kanalisationsnetz – Abwasseranschlüsse – Komprimiertes Rohr – Abwasserpumpenstation P3 – Sanierungsarbeiten Aufgabe 2. Bauarbeiten: Wechselstromleitungen durch PE-Rohre ersetzen: — Wasserversorgungsnetz – Überflüsse von Wasserversorgungsverbindungen. Als Ergebnis des Projekts wird Haushaltsabwässer in eine biologische und mechanische Kläranlage geleitet, die 2005 für eine Kläranlage in Betrieb genommen wurde. 500 m³/Tag, befindet sich in Lipia. Sobald die Investition abgeschlossen ist, wird der Anteil der Bevölkerung der Gemeinde Lipie, die das Abwasserbehandlungssystem gemäß der Richtlinie 91/271/EWG nutzt, zunehmen und folglich die Umweltverschmutzung (insbesondere Wasser) verringern. (German)
    8 December 2021
    0 references

    Identifiers

    RPSL.05.01.02-24-06D6/17
    0 references