Thermal modernisation of the indoor swimming pool at the 20/22 Independence Avenue in Częstochowa (Q123991)

From EU Knowledge Graph
Revision as of 07:02, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q123991 in Poland
Language Label Description Also known as
English
Thermal modernisation of the indoor swimming pool at the 20/22 Independence Avenue in Częstochowa
Project Q123991 in Poland

    Statements

    0 references
    2,392,011.99 zloty
    0 references
    574,082.88 Euro
    13 January 2020
    0 references
    2,814,131.75 zloty
    0 references
    675,391.62 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 October 2018
    0 references
    GMINA MIASTO CZĘSTOCHOWA
    0 references
    0 references

    50°48'32.4"N, 19°7'27.8"E
    0 references
    Projekt realizowany będzie na terenie m. Częstochowy. W ramach projektu wykonane zostaną prace remontowe i instalatorskie w celu termomodernizacji, wraz z podłączeniem do miejskiej sieci cieplnej, budynku Pływalni Krytej przy Al.Niepodległości 20/22 zarządzanej przez Miejski Ośrodek Sportu i Rekreacji w Częstochowie. Zakres prac obejmuje w szczególności docieplenie ścian, wymianę stolarki otworowej wraz z ościeżami oraz docieplenie stropodachów i prace towarzyszące, podłączenie budynku do miejskiej sieci ciepłowniczej, modernizacja systemu wentylacji, a także montaż kolektorów słonecznych wspomagających podgrzewanie ciepłej wody użytkowej oraz wody w basenie. Rezultatem realizacji projektu będzie zwiększenie efektywności energetycznej budynku użyteczności publicznej oraz zmniejszenie jego negatywnego wpływu na stan powietrza w mieście. (Polish)
    0 references
    The project will be implemented in the area of Częstochowa. As part of the project, renovation and installing works will be carried out for the purpose of thermal modernisation, along with connection to the municipal heating network, the building of Kryta Swimming Pool at Al.Independence 20/22 managed by the Municipal Sport and Recreation Centre in Częstochowa. The scope of work includes, in particular, wall warming, replacement of the opening carpentry and fittings, warming and accompanying works, connection of the building to the district heating network, modernisation of the ventilation system, as well as installation of solar collectors supporting heating of hot water and water in the pool. The result of the project will be to increase the energy efficiency of the public utility building and reduce its negative impact on the city’s air condition. (English)
    21 October 2020
    0 references
    Le projet sera mis en œuvre à Częstochowa. Dans le cadre du projet, des travaux de rénovation et d’installation seront réalisés afin de thermomoderniser, ainsi que la connexion au réseau thermique municipal, la construction de la piscine intérieure à Al.Niepodległości 20/22, gérée par le Centre municipal de sports et de loisirs de Częstochowa. Le champ d’application des travaux comprend notamment l’isolation des murs, le remplacement de la menuiserie ouverte par des cadres et des travaux de chauffage et d’accompagnement, la connexion du bâtiment au réseau de chauffage urbain, la modernisation du système de ventilation, ainsi que l’installation de capteurs solaires soutenant le chauffage de l’eau chaude et de l’eau dans la piscine. Le résultat du projet sera d’accroître l’efficacité énergétique du bâtiment public et de réduire son impact négatif sur l’état de l’air de la ville. (French)
    2 December 2021
    0 references
    Das Projekt wird in Częstochowa durchgeführt. Im Rahmen des Projekts werden Renovierungs- und Installationsarbeiten durchgeführt, um zusammen mit der Anbindung an das städtische Thermalnetz den Bau des Hallenbades in Al.Niepodległości 20/22 unter Leitung des städtischen Sport- und Freizeitzentrums in Częstochowa durchzuführen. Der Umfang der Arbeiten umfasst insbesondere die Isolierung der Wände, die Ersetzung der offenen Tischlerie durch Rahmen und Wärme- und Begleitarbeiten, die Anbindung des Gebäudes an das Fernwärmenetz, die Modernisierung der Lüftungsanlage sowie die Installation von Solarkollektoren, die die Heizung von Warmwasser und Wasser im Pool unterstützen. Das Ergebnis des Projekts wird darin bestehen, die Energieeffizienz des öffentlichen Gebäudes zu erhöhen und seine negativen Auswirkungen auf die Klimasituation der Stadt zu verringern. (German)
    8 December 2021
    0 references

    Identifiers

    RPSL.04.03.02-24-04AF/17
    0 references