Construction of the bypass of Kolbuszów and Weryn along the Voivodeship Road No. 875 Mielec – Leżajsk (Q119043)

From EU Knowledge Graph
Revision as of 06:34, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q119043 in Poland
Language Label Description Also known as
English
Construction of the bypass of Kolbuszów and Weryn along the Voivodeship Road No. 875 Mielec – Leżajsk
Project Q119043 in Poland

    Statements

    0 references
    44,256,484.38 zloty
    0 references
    10,621,556.25 Euro
    13 January 2020
    0 references
    52,066,452.25 zloty
    0 references
    12,495,948.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 October 2016
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO PODKARPACKIE
    0 references
    Przedmiotem przedsięwzięcia jest budowa drogi wojewódzkiej 875 (droga klasy G, kategoria ruchu KR4) na terenie gmin Kolbuszowa i Dzikowiec. W ramach inwestycji przewidziano:- Budowę i rozbudowę drogi i jej połączeń z drogami istniejącymi;- Budowę obiektów inżynierskich wynikających z w/w zakresu drogowego (wiadukt nad koleją, most nad rzeka Werynia);- Budowę jednopoziomowych skrzyżowań z drogami przecinającymi - jedno rondo, dwa skrzyżowania skanalizowane ;- Budowę zjazdów oraz dróg dojazdowych zapewniających dostęp do dróg publicznych;- Budowę urządzeń dla ruchu pieszego;- Budowę układu odwodnienia drogi odpowiadającej warunkom decyzji środowiskowej oraz uwarunkowaniom terenowym; - Budowę oświetlenia drogi;- Budowę, przebudowę / rozbudowę lub zabezpieczenie kolidujących urządzeń infrastruktury zewnętrznej;- Budowę wymaganych urządzeń ochrony środowiska;- Wykonanie oznakowania drogi oraz urządzeń bezpieczeństwa ruchu drogowego. Podstawowe parametry techniczne budowanej drogi wojewódzkiej nr 875:- Klasa techniczna drogi - G;- Przekrój drogi - 1 jezdnia z 2 pasami ruchu;- Pas ruchu - 3,50m.;- Opaska bitumiczna - min. 0,50 m.;- Pobocze gruntowe min. 0,75 m.;- Dodatkowy pas ruchu dla pojazdów skręcających w lewo o szerokości min. 3,0 m.;- Rowy drogowe trapezowe ziemne odcinkowo umocnione;Realizacja przedmiotowego przedsięwzięcia ma na celu: skrócenie czasu przejazdu samochodów, podwyższenie bezpieczeństwa ruchu drogowego, polepszenie warunków ruchu, zmniejszenie dla mieszkańców i środowiska uciążliwości spowodowanych ruchem. (Polish)
    0 references
    The subject of the project is the construction of the 875 voivodeship road (class G road, KR4 traffic category) in the municipalities of Kolbuszowa and Dzikowiec. The investment includes:- Construction and extension of the road and its connections with existing roads;- Construction of engineering facilities resulting from the abovementioned road range (viaduct over the railway, bridge over the river Verynia);- Construction of single-level intersections with intersections – one roundabout, two intersections, two intersections;- Construction of exits and access roads providing access to public roads;- Construction of waterways for pedestrian traffic; — Construction of road lighting;- Construction, reconstruction/expansion or protection of interfering external infrastructure equipment;- Construction of required environmental protection devices;- Execution of road marking and road safety equipment. Basic technical parameters of the built voivodeship road no. 875:- Technical class of the road – G;- Cross road – 1 roadway with 2 lanes;- Traffic belt – 3,50 m.;- Bituminous rail – min. 0,50 m.;- Groundsides min. 0,75 m.;- Additional lane for vehicles turning left with a width of min. 3,0 m.;- Trapeeze ditches with a specific purpose: concretely strengthened; reduced driving times, increased road safety, improved traffic conditions, reduction of traffic burdens for residents and the environment. (English)
    20 October 2020
    0 references
    L’objet du projet est la construction de la route voïvodie 875 (route de classe G, catégorie KR4) dans les municipalités de Kolbuszowa et Dzikowiec. L’investissement prévoit:- la construction et l’extension de la route et de ses connexions avec les routes existantes;- la construction de structures techniques résultant de la route susmentionnée (passage ferroviaire, pont au-dessus de la rivière Werynia);- la construction d’intersections à un niveau avec des routes de croisement — un rond-point, deux intersections scannées;- la construction de issues et de voies d’accès donnant accès aux voies publiques;- la construction d’équipements de circulation pour piétons;- la construction d’un système de drainage des routes correspondant à la décision environnementale et aux conditions du terrain; — Construction d’éclairage routier;- Construction, reconstruction/expansion ou protection d’équipements d’infrastructure externes contradictoires;- Construction des équipements de protection de l’environnement requis;- Mise en œuvre de dispositifs de marquage et de sécurité routières. Paramètres techniques de base de la route de voïvodie no 875:- Classe technique de la route — G;- Section transversale de la route — 1 chaussée avec 2 voies;- Voie de circulation — 3,50 m;- armure bitumineuse — min. 0,50 m;- Route terrestre min. 0,75 m;- Voie supplémentaire pour véhicules tournants à gauche d’une largeur d’au moins 3,0 m;- Routes Trapézoidales avec section renforcée;La mise en œuvre du projet vise à: réduire les temps de conduite, améliorer la sécurité routière, améliorer les conditions de circulation, réduire les nuisances routières pour les résidents et l’environnement. (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist der Bau der Woiwodschaft Straße 875 (Klasse G Straße, Kategorie KR4) in den Gemeinden Kolbuszowa und Dzikowiec. Die Investition sieht Folgendes vor:- Bau und Ausbau der Straße und ihrer Verbindungen zu bestehenden Straßen;- Bau von Konstruktionsbauten aus der oben genannten Straße (Eisenbahnüberführung, Brücke über den Fluss Werynia);- Bau von einstufigen Kreuzungen mit Kreuzungen – ein Kreisverkehr, zwei Abschnitte gescannt;- Bau von Ausgängen und Zufahrtsstraßen, die Zugang zu öffentlichen Straßen bieten;- Bau von Fußgängerverkehrsausrüstungen;- Bau von Straßenentwässerungssystem entsprechend der Umweltentscheidung und Geländebedingungen; — Bau von Straßenbeleuchtung;- Bau, Wiederaufbau/Erweiterung oder Schutz widersprüchlicher externer Infrastrukturausrüstungen;- Bau der erforderlichen Umweltschutzausrüstung;- Einführung von Straßenmarkierungs- und Straßensicherheitseinrichtungen. Grundlegende technische Parameter der Woiwodschaft Straße Nr. 875:- Technische Klasse der Straße – G;- Querschnitt der Straße – 1 Fahrbahn mit 2 Fahrspuren;- Verkehrsspur – 3,50 m;- bituminöse Rüstung – min. 0,50 m;- Grundfahrbahn min. 0,75 m;- Zusätzliche Spur für Linksdrehfahrzeuge mit einer Breite von mindestens 3,0 m;- Trapezoidalstraßen mit einem Abschnitt verstärkt;Die Durchführung des Projekts zielt auf: Verkürzung der Lenkzeiten, Verbesserung der Straßenverkehrssicherheit, Verbesserung der Verkehrsbedingungen, Verringerung der Verkehrslähmung für Einwohner und Umwelt. (German)
    8 December 2021
    0 references

    Identifiers

    RPPK.05.01.00-18-0002/17
    0 references