Reconstruction, overbuilding and extension of the building at ul. Sitki 3 in Mielec for the needs of the House of Daily Stay and Workshops of the Occupational Therapy (Q119178)

From EU Knowledge Graph
Revision as of 19:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q119178 in Poland
Language Label Description Also known as
English
Reconstruction, overbuilding and extension of the building at ul. Sitki 3 in Mielec for the needs of the House of Daily Stay and Workshops of the Occupational Therapy
Project Q119178 in Poland

    Statements

    0 references
    2,715,462.07 zloty
    0 references
    651,710.90 Euro
    13 January 2020
    0 references
    3,194,661.3 zloty
    0 references
    766,718.71 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 April 2016
    0 references
    16 February 2018
    0 references
    GMINA MIEJSKA MIELEC
    0 references
    0 references
    Projekt polega na przebudowie, nadbudowie i rozbudowie budynku przy ulicy Sitki na potrzeby Domu Dziennego Pobytu oraz Warsztatów Terapii Zajęciowej. Realizacja projektu ma na celu zwiększenie dostępności usług społecznych na terenie Gminy Miejskiej Mielec. W obiekcie wydzielony będzie funkcjonalnie Dom Dziennego Pobytu dla osób starszych – (40 uczestników) na parterze budynku oraz Warsztaty Terapii Zajęciowej dla osób niepełnosprawnych (25 uczestników) zlokalizowane w części dwukondygnacyjnej, tj. na parterze i poddaszu, z pomieszczeniami połączonymi windą. Przedmiotowe przedsięwzięcie obejmuje: przebudowę, rozbudowę i nadbudowę istniejącego budynku gospodarczo – garażowego poprzez poszerzenie oraz dobudowanie skrzydła. Do głównych efektów realizacji projektu zalicza się rozszerzenie oferty placówki opiekuńczo-pobytowej, wsparcie procesu aktywizacji społecznej dla osób starszych, zminimalizowanie izolacji społecznej i psychicznej osób starszych, rozwój infrastruktury społecznej. (Polish)
    0 references
    The project consists of the reconstruction, superstructure and extension of the building on Sitki Street for the needs of the House of Stay and the Workshops of Occupational Therapy. The project aims to increase the availability of social services in the Municipality of Mielec. In the building will be separated functionally the House of Daily Stay for the elderly – (40 participants) on the ground floor of the building and the workshop for disabled persons (25 participants) located in the two-storey part, i.e. on the ground floor and attic, with rooms connected by lift. The project shall include: reconstruction, expansion and superstructure of the existing economic and garage building through the extension and extension of the wing. The main effects of the project include extending the offer of the care and accommodation facility, supporting the process of social activation for older people, minimising the social and mental isolation of older people, development of social infrastructure. (English)
    20 October 2020
    0 references
    Le projet consiste en la reconstruction, la superstructure et l’extension du bâtiment de la rue Sitki pour répondre aux besoins de la résidence quotidienne et des ateliers d’ergothérapie. La mise en œuvre du projet vise à accroître la disponibilité des services sociaux dans la municipalité de Mielec. Le bâtiment sera fonctionnellement séparé de la maison de vie pour les personnes âgées — (40 participants) au rez-de-chaussée du bâtiment et de l’atelier d’ergothérapie pour les handicapés (25 participants) situé dans la partie de deux étages, c’est-à-dire au rez-de-chaussée et grenier, avec des chambres reliées par un ascenseur. Le projet en question comprend: reconstruction, extension et surconstruction d’un bâtiment existant économiquement et garage par l’élargissement et l’ajout d’une aile. Les principaux résultats du projet sont l’extension de l’offre de services de soins et de résidence, le soutien au processus d’activation sociale pour les personnes âgées, la réduction de l’isolement social et mental des personnes âgées et le développement des infrastructures sociales. (French)
    2 December 2021
    0 references
    Das Projekt besteht aus dem Wiederaufbau, dem Aufbau und dem Ausbau des Gebäudes an der Sitki Street für die Bedürfnisse des Daily Residence House und der Arbeitstherapie Workshops. Die Umsetzung des Projekts zielt darauf ab, die Verfügbarkeit sozialer Dienstleistungen in der Gemeinde Mielec zu erhöhen. Das Gebäude wird funktional vom Wohnhaus für die Älteren getrennt – (40 Teilnehmer) im Erdgeschoss des Gebäudes und der Werkstatt der Berufstherapie für Behinderte (25 Teilnehmer) im zweigeschossigen Teil, d. h. im Erdgeschoss und im Dachgeschoss, mit Zimmern, die über einen Aufzug verbunden sind. Das betreffende Projekt umfasst: Umbau, Erweiterung und Überbau eines bestehenden wirtschaftlichen und Garagengebäudes durch Erweiterung und Zugabe eines Flügels. Die wichtigsten Ergebnisse des Projekts sind die Ausweitung des Angebots an Betreuungs- und Aufenthaltseinrichtungen, die Unterstützung des sozialen Aktivierungsprozesses für ältere Menschen, die Minimierung der sozialen und geistigen Isolation älterer Menschen und die Entwicklung sozialer Infrastrukturen. (German)
    7 December 2021
    0 references

    Identifiers

    RPPK.06.02.02-18-0052/16
    0 references