“Regeneration of railway line No. 57 on the section Kuźnica Białostocka – Gieniusze (S)” “Regeneration of railway line No. 923 on the Bufałowo East – Bufałowo (S) section” (Q116737)

From EU Knowledge Graph
Revision as of 19:24, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q116737 in Poland
Language Label Description Also known as
English
“Regeneration of railway line No. 57 on the section Kuźnica Białostocka – Gieniusze (S)” “Regeneration of railway line No. 923 on the Bufałowo East – Bufałowo (S) section”
Project Q116737 in Poland

    Statements

    0 references
    164,041,671.2 zloty
    0 references
    39,370,001.09 Euro
    13 January 2020
    0 references
    192,990,201.43 zloty
    0 references
    46,317,648.34 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 June 2018
    0 references
    15 November 2021
    0 references
    PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
    0 references

    53°30'36.4"N, 23°38'56.8"E
    0 references

    53°24'17.6"N, 23°29'58.6"E
    0 references
    Przedmiotem projektu jest zaprojektowanie oraz rewitalizacja jednotorowych, niezelektryfikowanych, szerokotorowych (1520 mm) linii kolejowych nr 57 (na odcinku od km 161,496 do km 188,260) oraz nr 923 (na odcinku od km 0,000 do km 1,120) wraz z urządzeniami sterowania ruchem kolejowym i obiektami inżynieryjnymi. Kategoria linii nr 57 – pierwszorzędna, kategoria linii nr 923 – znaczenia miejscowego. Linia nr 57 jest na całej długości równoległa do linii kolejowej nr 6. Linia kolejowa nr 923 odchodzi od linii nr 57 w km 176,952 (w rozjeździe nr 6) i tam ma swój początek. Całość przedmiotu zamówienia obejmuje wykonanie: 1) Dokumentacji projektowej niezbędnej do prawidłowego wykonania wszystkich robót budowlanych i uzyskania dla niej wszystkich wymaganych opinii, uzgodnień, dopuszczeń, warunków, decyzji i pozwoleń niezbędnych do realizacji przedmiotu zamówienia; 2) Wszystkich robót budowlanych zgodnie z zakresem zamówienia na podstawie opracowanej przez Wykonawcę i zatwierdzonej przez Zamawiającego dokumentacji projektowej, o której mowa w ppkt 1), oraz wszystkich robót przygotowawczych niezbędnych do wykonania zakresu Umowy oraz wszelkich czynności wymaganych Prawem; 3) Przeprowadzenie oceny zgodności każdego podsystemu strukturalnego objętego zakresem zamówienia na każdym etapie (projektowania, budowy i końcowych prób podsystemu). Zamówienie obejmuje zaprojektowanie i wykonanie zakresu torowego, inżynieryjnego i sterowania ruchem kolejowym oraz wszystkich branż niezbędnych do prawidłowego wykonania zadania. Zamawiający zwraca szczególną uwagę, iż całość przedmiotu Zamówienia powinna być wykonana zgodnie z Standardami Technicznymi. (Polish)
    0 references
    The subject of the project is the design and revitalisation of single track, non-electrified, wide-track (1520 mm) railway lines No. 57 (from km 161.496 to km 188.260) and 923 (from km 0.000 to km 1.120) together with traffic control equipment and engineering facilities. Category of line No 57 – Priority, category of line No 923 – local significance. Line 57 is parallel to railway line 6. Railway No. 923 departs from line 57 in km 176.952 (passenger 6) and begins there. The whole subject-matter of the contract includes the performance of: 1) Design documentation necessary for the proper execution of all construction works and obtaining all the required opinions, arrangements, approvals, conditions, decisions and permits necessary for the performance of the subject matter of the contract; 2) All construction works according to the scope of the contract on the basis of the design documentation referred to in point (1), prepared by the Contractor and approved by the Employer, as well as all preparatory works necessary for the performance of the scope of the Agreement and any activities required by Law; 3) Conformity assessment of each structural subsystem covered by the contract at each stage (design, construction and final testing of the subsystem). The contract includes the design and execution of the track range, engineering and traffic control, as well as all sectors necessary for the proper performance of the task. The awarding entity shall pay particular attention to the fact that the whole subject of the contract should be performed in accordance with the Technical Standards. (English)
    20 October 2020
    0 references
    Le projet a pour objet la conception et la revitalisation des lignes de chemin de fer à voie unique, non électrifiées et à large écartement (1 520 mm), 57 (du km 161,496 au km 188.260) et no 923 (du km 0,000 au km 1.120), ainsi que des installations de contrôle de la circulation ferroviaire et d’ingénierie. Catégorie de la ligne 57 — Priorité, catégorie de ligne no 923 — localité. La ligne 57 est parallèle à la ligne de chemin de fer 6. La ligne de chemin de fer 923 part de la ligne 57 au km 176 952 (à l’intersection 6) et y commence. L’ensemble de l’objet du contrat comprend l’exécution: 1) la documentation du projet nécessaire à la bonne exécution de tous les travaux de construction et à l’obtention pour celui-ci de tous les avis, dispositions, approbations, conditions, décisions et permis nécessaires à l’exécution de l’objet du marché; 2) Tous les travaux de construction conformément au champ d’application du marché sur la base de la documentation de conception visée au point 1), préparée par le contractant et approuvée par le pouvoir adjudicateur, ainsi que tous les travaux préparatoires nécessaires à l’exécution du champ d’application du contrat et toute activité requise par la loi; 3) Évaluation de la conformité de chaque sous-système structurel couvert par le marché à chaque étape (conception, construction et essais finaux du sous-système). Le contrat couvre la conception et l’exécution de la gamme de voies, d’ingénierie et de contrôle du trafic ainsi que tous les secteurs nécessaires à la bonne exécution de la tâche. Le pouvoir adjudicateur accorde une attention particulière au fait que l’ensemble de l’objet de l’arrêté doit être effectué conformément aux normes techniques. (French)
    1 December 2021
    0 references
    Ziel des Projekts ist die Planung und Revitalisierung von eingleisigen, nicht elektrifizierten, breiten Spurweiten (1 520 mm) Bahnlinien 57 (von km 161.496 bis km 188.260) und Nr. 923 (von km 0,000 bis km 1.120) sowie Eisenbahnverkehrssteuerung und -technik. Kategorie der Linie 57 – Priorität, Kategorie der Linie 923 – Lokalität. Die Linie 57 ist parallel zur Eisenbahnlinie 6. Die Bahnlinie 923 fährt von der Linie 57 bei km 176.952 (in der Kreuzung 6) ab und hat dort ihren Anfang. Der gesamte Vertragsgegenstand umfasst die Ausführung von: 1) Projektdokumentation, die für die ordnungsgemäße Ausführung aller Bauarbeiten erforderlich ist und für sie alle erforderlichen Stellungnahmen, Vorkehrungen, Genehmigungen, Bedingungen, Entscheidungen und Genehmigungen, die für die Erfüllung des Auftragsgegenstands erforderlich sind, einzuholen; 2) Alle Bauarbeiten entsprechend dem Umfang des Auftrags auf der Grundlage der Konstruktionsunterlagen gemäß Nummer 1, die vom Auftragnehmer erstellt und vom öffentlichen Auftraggeber genehmigt wurden, sowie alle für die Ausführung des Auftragsumfangs erforderlichen Vorbereitungsarbeiten und alle nach dem Gesetz erforderlichen Tätigkeiten; 3) Konformitätsbewertung jedes unter den Vertrag fallenden strukturellen Teilsystems in jeder Phase (Auslegung, Konstruktion und Abschlussprüfung des Teilsystems). Der Vertrag deckt die Planung und Ausführung des Strecken-, Engineering- und Verkehrssteuerungsbereichs sowie alle Sektoren ab, die für die ordnungsgemäße Ausführung der Aufgabe erforderlich sind. Der öffentliche Auftraggeber achtet besonders darauf, dass der gesamte Gegenstand der Anordnung in Übereinstimmung mit den technischen Normen zu erfolgen hat. (German)
    7 December 2021
    0 references

    Identifiers

    RPPD.04.02.00-20-0001/17
    0 references