Improvement of the water management system of the municipality of Opole Lubelskie (Q105619)

From EU Knowledge Graph
Revision as of 14:59, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q105619 in Poland
Language Label Description Also known as
English
Improvement of the water management system of the municipality of Opole Lubelskie
Project Q105619 in Poland

    Statements

    0 references
    2,718,843.92 zloty
    0 references
    652,522.54 Euro
    13 January 2020
    0 references
    3,198,639.92 zloty
    0 references
    767,673.58 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 December 2016
    0 references
    31 October 2020
    0 references
    OPOLSKIE PRZEDSIĘBIORSTWO KOMUNALNE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Głównym celem projektu jest poprawa jakości dostarczanych wód na cele socjalno - bytowe, oraz przemysłowe poprzez rozbudowę i modernizację istniejącej infrastruktury uzdatniania wody na terenie gminy Opole Lubelskie i wdrożenie aktywnego systemu kontroli opomiarowania i kontroli strat i wycieków wody.Grupy docelowe: - Mieszkańcy, przedsiębiorcy. Zadania w projekcie: Budowa wodociągu - Góre Kluczkowickie - Kluczkowice Osiedle; SUW Kamionka; Budowa wodociągu - Zajączków; Przebudowa wodociągu ul. Przemysłowa; Wykonanie monitoringu ujęć; Dokumentacja techniczna; Studium Wykonalności; Promocja; Zarządzanie; Nadzór inwestorski. W ramach kosztów niekwalifikowanych zrealizowane zostaną: Kanalizacja sanitarna - Zajączków; Kanalizacja sanitarna - ul. Przemysłowa. W wyniku projektu osiągnięte zostaną następujące rezultaty: Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę (CI18) [308 osoba]; Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę [15 700 osoba]; Wydajność dobowa wybudowanych ujęć wody [78,5 m3/dobę]. W ramach projektu wybudowanych zostanie2,17 km sieci wodociągowej oraz przebudowane będzie 1,25 km sieci. Monitoringiem zostanie objętych 9 ujęć wody. (Polish)
    0 references
    The main objective of the project is to improve the quality of the water supplied for social and living purposes, as well as industrial through the expansion and modernisation of the existing water treatment infrastructure in Opole Lubelskie commune and the implementation of an active control system for measuring and controlling water losses and leakages. — Residents, entrepreneurs. Tasks in the project: Construction of the water supply – Góre Kluczkowickie – Kluczkowice Osiedle; A stroke of Kamionka; Construction of water supply – Hares; Reconstruction of the water supply system ul. Industrial; Monitoring of shots; Technical documentation; Feasibility study; Promotion; Management; It’s investor supervision. As part of the ineligible costs, the following will be realised: Sanitary Sewerage – Hares; Sanitary Sewerage – St. It’s an industrial one. The project will result in the following results: The number of additional persons benefiting from improved water supply (CI18) [308 person]; The expected number of persons benefiting from improved water supply [15 700 person]; Daily capacity of built water intakes [78.5 m³/day]. As part of the project, 2.17 km of water supply network will be built and 1.25 km of network will be rebuilt. 9 water intakes will be monitored. (English)
    17 October 2020
    0 references
    L’objectif principal du projet est d’améliorer la qualité de l’eau fournie à des fins sociales, résidentielles et industrielles en étendant et modernisant les infrastructures existantes de traitement de l’eau dans la municipalité d’Opole Lubelskie et en mettant en place un système actif de mesure et de maîtrise des pertes et fuites d’eau. — Résidents, entrepreneurs. Tâches du projet: Construction de l’approvisionnement en eau — Góre Kluczkowickie — Kluczkowice Osiedle; SUW Kamionka; Construction d’un approvisionnement en eau — Bugs; Reconstruction de l’approvisionnement en eau ul. Industriel; Le suivi des tirs; La documentation technique; Étude de faisabilité; Promotion; Gestion; Surveillance des investisseurs. Dans le cadre des coûts inéligibles, les éléments suivants seront réalisés: Assainissement sanitaire — Buzzki; Assainissement sanitaire — ul. C’est industriel. Le projet permettra d’obtenir les résultats suivants: Nombre de personnes supplémentaires bénéficiant d’une amélioration de l’approvisionnement en eau (CI18) [308 personnes]; A) Nombre estimé de personnes bénéficiant d ‘une amélioration de l’ approvisionnement en eau [15 700 personnes]; Capacité quotidienne des prises d’eau construites [78,5 m³/jour]. Le projet permettra de construire 2,17 km du réseau d’approvisionnement en eau et de reconstruire 1,25 km du réseau. 9 prises d’eau seront surveillées. (French)
    1 December 2021
    0 references
    Hauptziel des Projekts ist die Verbesserung der Qualität des Wassers, das für soziale Zwecke und Wohnzwecke sowie für industrielle Zwecke bereitgestellt wird, indem die bestehende Wasseraufbereitungsinfrastruktur in der Gemeinde Opole Lubelskie erweitert und modernisiert wird und ein aktives System zur Messung und Kontrolle von Wasserverlusten und Leckagen eingeführt wird. — Anwohner, Unternehmer. Aufgaben im Projekt: Bau der Wasserversorgung – Góre Kluczkowickie – Kluczkowice Osiedle; SUW Kamionka; Bau einer Wasserversorgung – Bugs; Rekonstruktion der Wasserversorgung ul. Industrie; Überwachung der Schüsse; Technische Dokumentation; Durchführbarkeitsstudie; Beförderung; Verwaltung; Aufsicht der Anleger. Im Rahmen der nicht förderfähigen Kosten wird Folgendes realisiert: Sanitäre Kanalisation – Buzzki; Sanitäre Kanalisation – ul. Es ist industriell. Mit dem Projekt werden folgende Ergebnisse erzielt: Zahl der zusätzlichen Personen, die von einer verbesserten Wasserversorgung profitieren (CI18) [308 Person]; Geschätzte Zahl der Personen, die von einer verbesserten Wasserversorgung profitieren [15 700 Personen]; Tägliche Kapazität der bebauten Wasseraufnahmen [78,5 m³/Tag]. Das Projekt wird 2,17 km des Wasserversorgungsnetzes bauen und 1,25 km des Netzes wieder aufbauen. 9 Wasseraufnahmen werden überwacht. (German)
    7 December 2021
    0 references

    Identifiers

    RPLU.06.04.00-06-0026/18
    0 references