Reconstruction of the track-road system in ul. It’s a gene shaft. Sikorski and al. John Paul II with the construction of a tram and bus lane in Toruń – bit-City II (Q98389)

From EU Knowledge Graph
Revision as of 13:43, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q98389 in Poland
Language Label Description Also known as
English
Reconstruction of the track-road system in ul. It’s a gene shaft. Sikorski and al. John Paul II with the construction of a tram and bus lane in Toruń – bit-City II
Project Q98389 in Poland

    Statements

    0 references
    36,808,082.1 zloty
    0 references
    8,833,939.70 Euro
    13 January 2020
    0 references
    43,824,362.55 zloty
    0 references
    10,517,847.01 Euro
    13 January 2020
    0 references
    83.99 percent
    0 references
    1 June 2015
    0 references
    28 February 2022
    0 references
    GMINA MIASTA TORUŃ
    0 references
    0 references
    W ramach projektu zaplanowano przebudowę ul. Chopina od skrzyżowania al. 500-lecia Torunia do skrzyżowania z al. św. Jana Pawła II, przebudowę al. św. Jana Pawła od mostu im. J. Piłsudskiego do Placu Niepodległości wraz z placem oraz ul. Wały gen. Sikorskiego od Pl. Artylerii Polskiej do skrzyżowania z al. Solidarności bez tego skrzyżowania. Ponadto zaprojektowano przebudowę krótkiego odcinka torowiska w ul. Kraszewskiego oraz w ul. Czerwona Droga. W ramach tej inwestycji zaplanowano budowę jezdni o nawierzchni bitumicznej i kamiennej, budowę chodników, ścieżek rowerowych, zjazdów oraz 7 peronów tramwajowych, a także przejść i przejazdów przez torowisko. W ul. Chopina, al. św. Jana Pawła II oraz dalej w ul. Kraszewskiego i ul. Czerwona Droga torowisko zaplanowano jako wydzielone z jezdni. W ul. Wały gen. Sikorskiego torowisko zaprojektowano jako zintegrowane z jezdnią w środku jej przekroju. Sumaryczna długość projektowanego torowiska wynosi 2+748,989 metrów toru pojedynczego.Przewidziano przebudowę istniejących sygnalizacji świetlnych oraz budowę sygnalizacji świetlnej wzbudzanej przez tramwaj na wszystkich przejazdach tramwajowych i przejściach przez torowisko. Przewidziano budowę sygnalizacji świetlnej na skrzyżowaniach al. św. Jana Pawła II z ulicami: Fryderyka Chopina, Wały gen. Sikorskiego oraz Czerwona Droga / Józefa Kraszewskiego. (Polish)
    0 references
    As part of the project, a reconstruction of the street was planned. Chopin from the intersection of al. The 500th anniversary of Toruń to the junction with St. John Paul II, reconstruction of St. John Paul from the J. Piłsudski Bridge to the Independence Square along with the square and street. It’s a gene shaft. Sikorski from Pl. Polish Artillery to the intersection with al. Solidarity without this intersection. In addition, the construction of a short section of the track was designed in a street. Kraszewskiego and St. The Red Road. As part of this investment, the construction of roads with bituminous and stone pavements, the construction of pavements, bicycle paths, exits and 7 tram platforms, as well as crossings and crossings were planned. In the hive. Chopin, St. John Paul II and further on in St. Kraszewskiego and ul. The red road track is planned to be separated from the road. In the hive. It’s a gene shaft. Sikorski track was designed as integrated with the road in the middle of its cross section. The total length of the designed track is 2 + 748.989 meters of single track.There are plans to reconstruct the existing traffic lights and to build a traffic signal generated by the tram on all tram crossings and crossing the track. Construction of traffic lights is planned at the junctions of St. John Paul II with streets: Frederic Chopin, Wal Gene. Sikorski and the Red Road/Józef Kraszewski. (English)
    15 October 2020
    0 references
    Dans le cadre du projet, la reconstruction d’ul. Chopin de l’intersection d’al. 500e anniversaire de Toruń à l’intersection avec St. Jean-Paul II, reconstruction d’al. St. John Paul du pont J. Piłsudski à la place de l’Indépendance, avec la place et ul. Des arbres géniques. Sikorski de Pl. L’artillerie polonaise à l’intersection avec al. Solidarité sans cette intersection. En outre, la reconstruction d’une courte section de la voie en ul. Kraszewski et ul. La route rouge. Dans le cadre de cet investissement, la construction de routes à surfaces bitumineuses et en pierre, la construction de trottoirs, de pistes cyclables, de toboggans de descente et de 7 quais de tramway, ainsi que des passages et passages à travers les voies sont prévus. Dans le st. Chopin, al. St. Jean-Paul II et plus loin dans ul. Kraszewski et ul. La voie rouge devrait être séparée de la chaussée. Dans le st. Des arbres géniques. La piste de Sikorski a été conçue pour être intégrée à la chaussée au milieu de sa section transversale. La longueur totale de la voie prévue est de 2 + 748 989 mètres de voie unique. Il a été envisagé de reconstruire les feux de circulation existants et de construire des feux de circulation déclenchés par le tramway sur tous les passages à niveau. La construction de feux de circulation aux intersections de St. St. Jean-Paul II avec des rues: Fryderyk Chopina, Wałł Gen. Sikorski et la route rouge/Józef Kraszewski. (French)
    1 December 2021
    0 references
    Im Rahmen des Projekts die Rekonstruktion von ul. Chopin von der Kreuzung von al. 500. Jahrestag von Toruń zur Kreuzung mit St. St. Johannes Paul II., Rekonstruktion von al. St. Johannes Paul von der J. Piłsudski Brücke zum Unabhängigkeitsplatz, zusammen mit dem Platz und ul. Genwellen. Sikorski von Pl. Polnische Artillerie zur Kreuzung mit al. Solidarität ohne diese Kreuzung. Darüber hinaus die Rekonstruktion eines kurzen Abschnitts der Strecke in ul. Kraszewski und in ul. Die Rote Straße. Im Rahmen dieser Investition sind der Bau von Straßen mit bituminösen und steinernen Flächen, der Bau von Gehwegen, Radwegen, Abfahrtsbahnen und 7 Straßenbahnsteigen sowie Passagen und Passagen durch die Gleise geplant. In st. Chopin, al. St. Johannes Paul II. und weiter in ul. Kraszewski und ul. Die rote Straße soll von der Straße getrennt werden. In st. Genwellen. Die Sikorski-Strecke wurde so konzipiert, dass sie in der Mitte seines Querschnitts in die Fahrbahn integriert werden soll. Die Gesamtlänge der geplanten Strecke beträgt 2+ 748.989 Meter eingleisig. Es war geplant, die bestehenden Ampel wieder aufzubauen und Ampel zu bauen, die durch die Straßenbahn an allen Straßenbahn- und Gleisübergängen ausgelöst werden. Der Bau von Ampeln an den Kreuzungen von St. St. Johannes Paul II. mit Straßen: Fryderyk Chopina, Wałł Gen. Sikorski und die Rote Straße/Józef Kraszewski. (German)
    7 December 2021
    0 references

    Identifiers

    RPKP.03.05.02-04-0001/17
    0 references