Construction of a heating network with connections to the property at ul. Kiliński, Kochanowski, Śmiała, Prozodowniki Labor, Piastowska in Bogatynia. (Q95796)

From EU Knowledge Graph
Revision as of 11:20, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q95796 in Poland
Language Label Description Also known as
English
Construction of a heating network with connections to the property at ul. Kiliński, Kochanowski, Śmiała, Prozodowniki Labor, Piastowska in Bogatynia.
Project Q95796 in Poland

    Statements

    0 references
    681,732.9 zloty
    0 references
    163,615.90 Euro
    13 January 2020
    0 references
    1,529,637.4 zloty
    0 references
    367,112.98 Euro
    13 January 2020
    0 references
    44.57 percent
    0 references
    6 September 2017
    0 references
    15 December 2017
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ S.A.
    0 references
    0 references
    Celem inwestycji jest uciepłownienie istniejących budynków mieszkalnych dotychczas ogrzewanych miejscowo z kotłowni węglowych i pieców przy ul. Kilińskiego, Kochanowskiego, Śmiałej, Przodowników Pracy, Piastowskiej w Bogatyni. Bogatynia jest obszarem na którym występują ponadnormatywne poziomy stężenia PM10. W ramach inwestycji do efektywnie energetycznego systemu cieplnego ciepłowniczej zostanie podłączonych 37 nieruchomości i zlikwidowane zostaną 52 piece opalane paliwem stałym. W wyniku realizacji Projektu zapotrzebowanie na moc cieplną wzrośnie o 1,0272 MW, a szacowana sprzedaż ciepła do nowopodłączonych odbiorców wynosi 6163 GJ. W wyniki likwidacji niskosprawnych źródeł ciepła i podłączenie obiektów do systemu efektywnie energetycznego, planowana oszczędność energii pierwotnej będzie wynosić 4483,5 GJ/rok. Efektem ekologicznym projektu będzie redukcja emisji CO2 o 939 Mg/rok (53%) i redukcja emisji PM10 1,71 Mg (100%). Zakres przedmiotowy projektu obejmuje budowę sieci ciepłowniczych i przyłączy o długości 1362,10 m. Sieć zostanie wpięta do istniejącej magistrali ciepłowniczej 2xDN300 i zasilać będzie indywidualne węzły ciepłownicze w poszczególnych budynkach. Sieć ciepłownicza projektowana jest jako sieć preizolowana, podziemna poza odcinkiem przejścia nad ciekiem Ślad w skrzyżowaniu z ul. Kilińskiego. Lokalizacja sieci projektowana jest w działkach Gminy Bogatynia oraz w działkach prywatnych budynków podłączonych do sieci. Sieć ciepłowniczą zaprojektowano w systemie samokompensacji. Do kompensacji wydłużeń sieci cieplnej preizolowanej wykorzystano jej załamania w planie wynikające ze sposobu prowadzenia sieci. Znaczna cześć obiektów planowanych do podłączenia jest już wyposażona w instalacje wewnętrzne. W pozostałych obiektach instalacje zostaną wykonane przez właścicieli nieruchomości, którzy podpisali umowy wstępne o przyłączeniu do sieci ciepłowniczej w ciągu roku od daty zakończenia inwestycji. Beneficjentem i operatorem Projekt (Polish)
    0 references
    The purpose of the investment is to warm up existing residential buildings so far heated locally from coal boiler rooms and furnaces at ul. Kiliński, Kochanowski, Śmiała, Prozodowniki Labor, Piastowska in Bogatynia. Bogatynia is an area where there are supranormative levels of PM10 concentrations. As part of the investment, 37 properties will be connected to the energy efficient heating system and 52 solid fuel furnaces will be liquidated. As a result of the project, the demand for thermal power will increase by 1.0272 MW, and the estimated heat sales to newly connected customers is 6163 GJ. In the results of the elimination of low-efficiency heat sources and connecting the facilities to the energy efficient system, the planned primary energy savings will be 4483.5 GJ/year. The ecological effect of the project will be a reduction of CO2 emissions by 939 Mg/year (53 %) and a reduction in PM10 1.71 Mg (100 %) emissions. The scope of the project covers the construction of district heating networks and connections with a length of 1362.10 m. The network will be plugged into the existing heating bus 2xDN300 and will power individual heating nodes in individual buildings. The heating network is designed as a pre-insulated network, underground outside the section of the passage over the river Trace at the intersection with ul. It’s Kilinski’s. The location of the network is designed in the plots of Bogatynia commune and in the plots of private buildings connected to the network. The heating network is designed in a self-compensation system. To compensate for the extensions of the pre-insulated heat grid, its breakdowns were used in the plan resulting from the way the network operates. A large part of the facilities planned for connection are already equipped with internal installations. In other facilities, the installations will be carried out by property owners who have signed preliminary agreements on connection to the heating network within one year from the date of completion of the investment. Beneficiary and Operator Project (English)
    15 October 2020
    0 references
    L’objectif de l’investissement est d’émaner des bâtiments résidentiels existants chauffés localement à partir de chaudières et de poêles au charbon à UL. Kiliński, Kochanowski, Laughing, Labor Ancestors, Piastowska à Bogatynia. Bogatynia est une zone où se produisent des niveaux de PM10 super standards. Dans le cadre de l’investissement, 37 propriétés seront raccordées à un système de chauffage efficace et 52 fours à combustible solide seront démantelés. À la suite du projet, la demande de capacité thermique augmentera de 1,0272 MW et les ventes de chaleur aux clients nouvellement connectés sont estimées à 6163 GJ. Dans les résultats du démantèlement des sources de chaleur à faible rendement et de la connexion des objets au système énergétique efficace, les économies d’énergie primaire prévues seront de 4483,5 GJ/an. L’effet environnemental du projet sera de réduire les émissions de CO2 de 939 Mg/an (53 %) et de réduire les PM10 1,71 Mg (100 %). Le projet couvre la construction de réseaux de chauffage urbain et de connexions d’une longueur de 1 362,10 m. Le réseau sera raccordé au bus de chauffage urbain existant 2xDN300 et alimentera des nœuds de chauffage individuels dans des bâtiments individuels. Le réseau de chauffage urbain est conçu comme un réseau souterrain pré-isolé à l’extérieur de la section du passage sur le ruisseau Ślad à l’intersection avec ul. C’est Kilinskiy. L’emplacement du réseau est conçu dans les parcelles de la municipalité de Bogatynia et dans les parcelles de bâtiments privés reliés au réseau. Le système de chauffage urbain a été conçu dans un système d’autocompensation. Pour compenser l’allongement du réseau thermique pré-isolé, son effondrement dans le plan a été utilisé à la suite de l’exploitation du réseau. Une partie importante des installations prévues pour le raccordement sont déjà équipées d’installations internes. Dans les autres installations, les installations seront réalisées par les propriétaires qui ont signé des accords préliminaires de raccordement au réseau de chauffage urbain dans un délai d’un an à compter de la date d’achèvement de l’investissement. Bénéficiaire et exploitant du projet (French)
    1 December 2021
    0 references
    Ziel der Investition ist es, bestehende Wohngebäude zu emanzipieren, die zuvor vor Ort aus Kohleheizkesselräumen und Öfen in ul beheizt wurden. Kiliński, Kochanowski, Laughing, Arbeitsvorfahren, Piastowska in Bogatynia. Bogatynia ist ein Gebiet, in dem Superstandard PM10-Spiegel auftreten. Im Rahmen der Investition werden 37 Eigenschaften an ein effizientes Heizsystem angeschlossen und 52 Festbrennstofföfen abgebaut. Als Ergebnis des Projekts wird die Nachfrage nach Wärmekapazität um 1,0272 MW steigen, und der geschätzte Wärmeabsatz an neu angeschlossene Kunden beträgt 6163 GJ. Im Ergebnis der Stilllegung von sparsamen Wärmequellen und der Anbindung von Objekten an das effiziente Energiesystem wird die geplante Primärenergieeinsparung 4483,5 GJ/Jahr betragen. Die Umweltauswirkungen des Projekts werden darin bestehen, die CO2-Emissionen um 939 Mg/Jahr (53 %) zu reduzieren und PM10 1,71 Mg (100 %) zu reduzieren. Das Projekt umfasst den Bau von Fernwärmenetzen und Anschlüssen mit einer Länge von 1 362,10 m. Das Netz wird an den bestehenden Fernwärmebus 2xDN300 angeschlossen und in einzelnen Gebäuden individuelle Heizknoten liefern. Das Fernwärmenetz ist als vorisoliertes unterirdisches Netz außerhalb des Abschnitts des Durchgangs über den Ślad-Strom in der Kreuzung mit ul konzipiert. Hier ist Kilinskiy. Die Lage des Netzes ist in den Grundstücken der Gemeinde Bogatynia und in den Grundstücken der privaten Gebäude mit dem Netz verbunden. Das Fernwärmesystem wurde in einem Selbstkompensationssystem konzipiert. Um die Dehnung des vorisolierten Wärmenetzes zu kompensieren, wurde der Kollaps im Plan als Folge des Betriebs des Netzes verwendet. Ein erheblicher Teil der für den Anschluss geplanten Anlagen ist bereits mit internen Installationen ausgestattet. In den übrigen Anlagen werden die Anlagen von den Eigentümern durchgeführt, die Vorabvereinbarungen über den Anschluss an das Fernwärmenetz innerhalb eines Jahres nach Abschluss der Investition unterzeichnet haben. Begünstigter und Betreiber des Projekts (German)
    7 December 2021
    0 references

    Identifiers

    RPDS.03.05.00-02-0001/16
    0 references