Extension of DW 878 on the section from the border of the town of Rzeszów to the intersection of ul. Grunwaldska from St. Orkana in Tycin (DP No 1404 R) (Q88477)

From EU Knowledge Graph
Revision as of 10:01, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q88477 in Poland
Language Label Description Also known as
English
Extension of DW 878 on the section from the border of the town of Rzeszów to the intersection of ul. Grunwaldska from St. Orkana in Tycin (DP No 1404 R)
Project Q88477 in Poland

    Statements

    0 references
    14,686,452.22 zloty
    0 references
    3,524,748.53 Euro
    13 January 2020
    0 references
    17,278,179.09 zloty
    0 references
    4,146,762.98 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 February 2017
    0 references
    31 January 2019
    0 references
    WOJEWÓDZTWO PODKARPACKIE
    0 references
    Przedmiotem niniejszego projektu jest rozbudowa odcinka drogi wojewódzkiej nr 878 do 4 pasów ruchu po 2 w obu kierunkach od km 5+026,8 (koniec odcinka 4 pasowego ulicy Wł. Sikorskiego w Rzeszowie) do km 5+861,80 (koniec rozbudowy skrzyżowania z drogą powiatową nr 1404R – ul. Orkana w Tyczynie). Inwestycja obejmuje również budowę mostu na rzece Strug w km 5+067,42 wraz z niezbędną infrastrukturą techniczną, rozbudowę skrzyżowania z drogą powiatową nr 1404R w km 5+740,33 oraz skrzyżowania z ulicą Stawową, a także budowę dodatkowego pasa do skrętu w lewo do bazy MPGK. Łączna długość rozbudowanego odcinka drogi to 0,83 km. Rozbudowana droga będzie charakteryzować się następującymi parametrami: klasa G, nośność: 115 kN/oś, jezdnia o szerokości 16,5m (3,5 + 3,25 + 3,0 +3,25 + 3,5). Budowany most nad rzeką Strug będzie miał następujące parametry: długość całkowita: ok. 42m, szerokość całkowita: ok. 28m, nośność: 50t, klasa A wg PN-85/S-10030. Przewidziane jest również wykonanie mostu tymczasowego. W ramach projektu przewidziana jest również m.in.: - budowa ścieżki rowerowej dwukierunkowej lewostronnej o szerokości 2,00m - budowa chodników: prawostronnego o szerokości 2,00 m oraz lewostronnego o szerokości 1,50 m - budowa i przebudowa zatok autobusowych oraz zjazdów indywidualnych i publicznych - budowa murów oporowych - budowa kanalizacji deszczowej wraz z wylotem - budowa oświetlenia ulicznego; - demontaż istniejącej oraz budowa nowej sygnalizacji świetlnej; - przebudowa infrastruktury technicznej kolidującej z inwestycją Głównymi użytkownikami projektu będą: mieszkańcy Tyczyna, Rzeszowa i okolicznych gmin, przedsiębiorcy prowadzący działalność na tym terenie, pracownicy, dostawcy, klienci, a także pozostali użytkownicy dróg z terenu województwa podkarpackiego, a w szczególności jego południowej części. (Polish)
    0 references
    The subject of this project is the extension of the section of Voivodeship Road No. 878 to 4 lanes after 2 in both directions from km 5 + 026.8 (end of section 4 of Wł street. Sikorski in Rzeszów) to km 5 + 861.80 (end of extension of the intersection with district road no.1404R – ul. Orkana in Tyczyn). The investment also includes the construction of a bridge over the Strug river in km 5 + 067.42, together with the necessary technical infrastructure, the extension of the intersection with district road No. 1404R in km 5 + 740.33 and the intersection with pond street, as well as the construction of an additional lane to the left to the MPGK base. The total length of the extended section of the road is 0.83 km. The extended road will be characterised by the following parameters: class G, load capacity: 115 kN/axis, 16.5 m wide road (3,5 + 3,25 + 3,0 + 3.25 + 3.5). The built bridge over the Strug River will have the following parameters: overall length: it’s okay. 42 m, overall width: it’s okay. 28 m, load capacity: 50 t, class A according to PN-85/S-10030. A temporary bridge is also planned. The project also includes: — construction of a two-way bicycle path with a width of 2.00 m – construction of pavements: right-hand side with a width of 2.00 m and a left-hand side with a width of 1.50 m – construction and reconstruction of bus bays and individual and public exits – construction of resistance walls – construction of rainwater drainage including outlet – construction of street lighting; — the dismantling of the existing and the construction of a new light-signalling system; — reconstruction of technical infrastructure conflicting with the investment The main users of the project will be: residents of Tyczyn, Rzeszów and surrounding communes, entrepreneurs operating in this area, employees, suppliers, customers, as well as other road users from the Podkarpackie Voivodeship, and in particular its southern part. (English)
    14 October 2020
    0 references
    L’objet de ce projet est d’étendre le tronçon de la route de voïvodie no 878 à 4 voies de 2 dans les deux sens à partir du km 5 + 026.8 (fin de 4 voies de la section Wł. Sikorskiego à Rzeszów) au km 5 + 861,80 (fin de l’extension de l’intersection avec la route de district no 1404R — ul. Orkana à Tyczyn). L’investissement comprend également la construction d’un pont au-dessus de la rivière Strug au km 5+ 067.42 avec l’infrastructure technique nécessaire, l’extension de l’intersection avec la route de district no 1404R au km 5+ 740.33 et l’intersection avec la rue Stawowa, ainsi que la construction d’une voie de virage gauche supplémentaire à la base MPGK. La longueur totale du tronçon étendu de la route est de 0,83 km. La route étendue sera caractérisée par les paramètres suivants: classe G, capacité de charge: 115 kN/essieu, 16,5 m de large chaussée (3,5+ 3,25+ 3,0+ 3,25+ 3,5). Le pont construit au-dessus de la rivière Strug aura les paramètres suivants: longueur hors tout: D’accord, d’accord. 42 m, largeur hors tout: D’accord, d’accord. 28 m, capacité de charge: 50 t, classe A selon PN-85/S-10030. Un pont temporaire est également prévu. Le projet prévoit également: — construction d’une piste cyclable bidirectionnelle sur le côté gauche avec une largeur de 2,00 m — construction de trottoirs: le côté droit avec une largeur de 2,00 m et le côté gauche avec une largeur de 1,50 m — construction et reconstruction de baies d’autobus et de sorties individuelles et publiques — construction de murs de soutènement — construction de drains de pluie et de sorties — construction d’éclairage public; — démontage des feux de circulation existants et construction de nouveaux feux de circulation; — la reconstruction de l’infrastructure technique en conflit avec les principaux utilisateurs du projet sera: résidents de Tyczyna, de Rzeszów et des municipalités environnantes, entrepreneurs opérant dans la région, employés, fournisseurs, clients, ainsi que d’autres usagers de la route de la voïvodie de Podkarpackie, et en particulier de la partie sud de celle-ci. (French)
    30 November 2021
    0 references
    Ziel dieses Projekts ist es, den Abschnitt der Woiwodschaft Straße Nr. 878 auf 4 Fahrspuren von 2 in beide Richtungen von km 5 + 026.8 (Ende von 4 Spurabschnitt Wł. Sikorskiego in Rzeszów) bis km 5 + 861,80 (Ende der Erweiterung der Kreuzung mit Kreisstraße Nr. 1404R – ul. Orkana in Tyczyn). Die Investition umfasst auch den Bau einer Brücke über den Fluss Strug in km 5+ 067.42 mit der erforderlichen technischen Infrastruktur, die Erweiterung der Kreuzung mit der Kreisstraße Nr. 1404R in km 5+ 740.33 und die Kreuzung mit der Stawowa Street sowie den Bau einer zusätzlichen linken Spur zum MPGK-Basis. Die Gesamtlänge des erweiterten Straßenabschnitts beträgt 0,83 km. Die erweiterte Straße wird durch folgende Parameter gekennzeichnet sein: Klasse G, Tragfähigkeit: 115 kN/Achse, 16,5 m breite Fahrbahn (3.5+ 3,25+ 3,0+ 3,25+ 3,5). Die gebaute Brücke über den Fluss Strug hat folgende Parameter: Gesamtlänge: okay, okay, okay. 42 m, Gesamtbreite: okay, okay, okay. 28 m, Tragkraft: 50 t, Klasse A nach PN-85/S-10030. Eine temporäre Brücke ist ebenfalls vorgesehen. Das Projekt sieht außerdem Folgendes vor: — Bau eines zweiseitigen Radwegs auf der linken Seite mit einer Breite von 2,00 m – Bau von Gehwegen: die rechte Seite mit einer Breite von 2,00 m und der linken Seite mit einer Breite von 1,50 m – Bau und Rekonstruktion von Busbuchten und einzelnen und öffentlichen Ausgängen – Bau von Stützmauern – Bau von Regenabflüssen und -ausgängen – Bau von Straßenbeleuchtung; — Demontage bestehender Ampel und Bau neuer Ampel; — der Wiederaufbau der technischen Infrastruktur, die im Widerspruch zu den Hauptnutzern des Projekts steht, wird Folgendes umfassen: Einwohner von Tyczyna, Rzeszów und umliegenden Gemeinden, in der Region tätige Unternehmer, Mitarbeiter, Lieferanten, Kunden sowie andere Verkehrsteilnehmer der Woiwodschaft Podkarpackie, insbesondere des südlichen Teils der Woiwodschaft Podkarpackie. (German)
    7 December 2021
    0 references

    Identifiers

    POPW.02.02.00-18-0005/16
    0 references