Route of the Łódź Railway Node (TEN-T), stage II, section Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec (Q85990)

From EU Knowledge Graph
Revision as of 09:38, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85990 in Poland
Language Label Description Also known as
English
Route of the Łódź Railway Node (TEN-T), stage II, section Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec
Project Q85990 in Poland

    Statements

    0 references
    1,219,254,777.36 zloty
    0 references
    292,621,146.57 Euro
    13 January 2020
    0 references
    1,434,417,385.13 zloty
    0 references
    344,260,172.43 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 December 2017
    0 references
    30 September 2022
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    0 references

    51°46'23.2"N, 19°28'42.2"E
    0 references
    Przedmiotem Projektu jest budowa linii kolejowej w tunelu liniowym (REG-A) od dworca Łódź Kaliska oraz od przystanku osobowego Łódź Żabieniec do dworca Łódź Fabryczna wraz z budową przystanków w rejonie ulic Ogrodowej/Karskiego/Drewnowskiej oraz w rejonie skrzyżowania ulic Zielonej i Zachodniej. Dla linii kolejowej w tunelu średnicowym określono następujące brzegowe warunki techniczne: • Max prędkość projektowa 100 km/h. • Dopuszczalny nacisk na oś: 221 kN W ramach inwestycji przewiduje się: roboty w branży torowej, niezbędne inwestycje drogowe dostosowujące układ uliczny i przebieg linii komunikacji miejskiej do prowadzonych robót, zwłaszcza w rejonach wejścia i wyjścia tunelu pod i na powierzchnię oraz w rejonie ewentualnych stacji pośrednich. Tunele szlakowe zostaną wykonane w postaci: • jednego dwutorowego tunelu wykonanego metodą tarczową, który będzie przebiegał od stacji „Łódź Fabryczna” do przystanku pośredniego „Łódź Ogrodowa”; • dwutorowego tunelu wykonanego metodą odkrywkową, który będzie przebiegał od przystanku pośredniego „Łódź Ogrodowa" do rejonu ulicy Odolanowskiej; • czterech tuneli jednotorowych wykonanych metodą odkrywkową, które będą przebiegały od ulicy Odolanowskiej do włączenia się w linię kolejową nr 15; • przystanek „Łódź Zielona” będzie wykonany metodą odkrywkową. (Polish)
    0 references
    The subject of the project is the construction of a railway line in the linear tunnel (REG-A) from the Łódź Kaliska station and from the Łódź Żabieniec passenger stop to the Łódź Fabryczna station with the construction of stops in the area of Ogrodowa/Karskiego/Drewnowska Streets and in the area of the intersection of Zielona and Zachodni streets. For a railway line in the diameter tunnel, the following technical conditions are specified: • Max design speed 100 km/h. • Allowable axle load: 221 kN The investment is expected to: works in the track industry, necessary road investments adapting the street layout and route of public transport lines to the work carried out, especially in the areas of entrance and exit of the tunnel under and to the surface and in the area of possible intermediate stations. The tunnels will be made in the form of: • one two-track circular tunnel, which will run from Łódź Fabryczna station to the intermediate stop “Łódź Ogrodowa”; • a two-track tunnel made by opencast method, which will run from the intermediate stop “Łódź Ogrodowa” to the area of Odolanowska Street; • four single track tunnels made by opencasting method, which will run from Odolanowska Street to join railway line No 15; • the “Green Lodz” stop will be made by the opencast method. (English)
    14 October 2020
    0 references
    L’objet de ce projet est la construction d’une ligne de chemin de fer dans le tunnel de ligne (REG-A) à partir de la gare de Łódź Kaliska et de l’arrêt de voyageurs de Łódžabieniec jusqu’à la gare de Łódź Fabryczna, ainsi que la construction d’arrêts dans la zone des rues Ogrodowa/Karskigo/Drewnowska et dans la zone de l’intersection des rues Zielona et occidentale. Pour la ligne de chemin de fer située au milieu du tunnel, les conditions techniques suivantes sont définies: • Vitesse maximale par construction 100 km/h. • Charge à l’essieu admissible: 221 kN Investissements comprennent: travaux dans l’industrie de la voie, investissements routiers nécessaires adaptant le réseau routier et l’itinéraire de la ligne de transport urbain aux travaux effectués, en particulier dans les zones d’entrée et de sortie du tunnel sous et à la surface et dans la zone des éventuelles stations intermédiaires. Les tunnels de sentiers seront réalisés sous la forme de: • un tunnel circulaire à double voie, qui va de la gare «Łódź Fabryczna» à l’arrêt intermédiaire «Łódź Ogrodowa»; • un tunnel à ciel ouvert à double voie, qui va de l’arrêt intermédiaire «Łódź Ogrodowa» au secteur de la rue Odolanowska; • quatre tunnels à voie unique à ciel ouvert qui s’étendront de la rue Odolanowska pour rejoindre la ligne de chemin de fer 15; • l’arrêt «Green Boat» sera effectué selon la méthode open-cast. (French)
    30 November 2021
    0 references
    Gegenstand des Projekts ist der Bau einer Eisenbahnlinie im Linientunnel (REG-A) vom Bahnhof Łódź Kaliska und von der Fahrgasthaltestelle Łódź Żabieniec zum Bahnhof Łódź Fabryczna, zusammen mit dem Bau von Haltestellen im Bereich der Straßen Ogrodowa/Karskigo/Drewnowska und im Bereich der Kreuzung von Zielona und westlichen Straßen. Für die Bahnstrecke im Mitteltunnel sind folgende technische Randbedingungen festgelegt: • Höchstgeschwindigkeit 100 km/h. • zulässige Achslast: 221 kN Investitionen umfassen: Arbeiten in der Gleisindustrie, notwendige Straßeninvestitionen zur Anpassung des Straßensystems und der Strecke der städtischen Verkehrslinie an die durchgeführten Arbeiten, insbesondere in den Ein- und Ausstiegsbereichen des Tunnels unter und an der Oberfläche und im Bereich möglicher Zwischenstationen. Trailtunnel werden in Form von: • ein zweigleisiger Rundtunnel, der von der Station „Łódź Fabryczna“ bis zur Zwischenhaltestelle „Łódź Ogrodowa“ verläuft; • ein zweigleisiger offener Tunnel, der von der Zwischenhaltestelle „Łódź Ogrodowa“ bis zum Gebiet der Odolanowska-Straße verläuft; • vier offen gegossene eingleisige Tunnel, die von der Odolanowska Street bis zur Eisenbahnlinie 15 laufen; • die Haltestelle „Green Boat“ erfolgt nach der Opencast-Methode. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.05.01.00-00-0012/16
    0 references