Construction of sanitary sewage system in Polanka Wielka – stage I – part 2 task 1-5 (Q85325)

From EU Knowledge Graph
Revision as of 09:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85325 in Poland
Language Label Description Also known as
English
Construction of sanitary sewage system in Polanka Wielka – stage I – part 2 task 1-5
Project Q85325 in Poland

    Statements

    0 references
    4,612,307.56 zloty
    0 references
    1,106,953.81 Euro
    13 January 2020
    0 references
    5,426,244.19 zloty
    0 references
    1,302,298.61 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2021
    0 references
    GMINA POLANKA WIELKA
    0 references
    Q2514653 (Deleted Item)
    0 references
    0 references
    Projekt będzie realizowany na terenie gminy Polanka Wielka, w województwie małopolskim, w powiecie oświęcimskim, w miejscowości Polanka Wielka, wchodzącej w skład Aglomeracji Oświęcim. Zakres projektu Projekt zakłada budowę kanalizacji w ramach przedsięwzięcia "Kanalizacja sanitarna dla miejscowości Polanka Wielka - etap I" i obejmuje część 2, zadania 1-5. W ramach projektu wybudowana zostanie sieć kanalizacji sanitarnej w ulicach: Zadanie 1. Ulice: Pałacowa, Kasztanowa, Długa, Stroma, Południowa, Ogrodowa, Kościelna, długość kanalizacji w ramach zadania: 2390,2 m Zadanie 2. Polna, Południowa, Słoneczna, długość kanalizacji: 3853,7 m; Zadanie 3. Słoneczna, Łąkowa, długość kanalizacji: 3198,2 m; Zadanie 4. Długa, Południowa, Północna, Krótka, Cicha, długość kanalizacji: 5269 m; Zadanie 5. długość kanalizacji: 3228 m. Łączna długość kanalizacji sanitarnej objętej przedmiotowym projektem: 17939,1 m (Polish)
    0 references
    The project will be implemented in the Polanka Wielka commune, in Małopolskie Voivodeship, in the Oświęcim district, in Polanka Wielka, part of the Oświęcim Agglomeration. The scope of the project The project assumes the construction of sewage systems as part of the project “Sanitary Canalisation for Polanka Wielka – Stage I” and includes part 2, tasks 1-5. As part of the project, a sanitary sewer network will be built in the streets: Task 1. Streets: Palace, Chestnut, Długa, Stroma, South, Garden, Church, length of sewage as part of the task: 2390.2 m Task 2. Polna, South, Sun, Sewerage length: 3853,7 m; Task 3. Solar, Meadow, Sewerage Length: 3198,2 m; Task 4. Long, South, North, Short, Silent, Sewerage length: 5269 m; Task 5. Sewerage length: 3228 m. The total length of the sanitary sewage system covered by the project: 17939.1 m (English)
    14 October 2020
    0 references
    Le projet sera mis en œuvre dans la commune de Polanka Wielka, voïvodie de Małopolskie, dans le district d’Oświęcim, dans le village de Polanka Wielka, qui fait partie de l’agglomération d’Oświęcim. Portée du projet Le projet comprend la construction de systèmes d’assainissement dans le cadre du projet «Étude sanitaire pour Polanka Wielka — phase I» et couvre la partie 2, tâches 1 à 5. Le projet permettra de construire un réseau d’assainissement sanitaire dans les rues: Activité 1. Rues: Palais, Kastanowa, Długa, Stroma, Sud, Jardin, Église, longueur d’égouts dans le cadre de la tâche: 2 390,2 m Tâche 2. Polna, Sud, Solaire, longueur d’égout: 3 853,7 m; Tâche 3. Solaire, prairie, longueur des égouts: 3 198,2 m; Tâche 4. Long, sud, nord, court, calme, longueur des égouts: 5 269 m; Tâche 5. longueur des égouts: 3 228 m. La longueur totale du réseau d’assainissement couvert par le projet: 17 939,1 m (French)
    30 November 2021
    0 references
    Das Projekt wird in der Gemeinde Polanka Wielka, Woiwodschaft Małopolskie, im Bezirk Oświęcim, im Dorf Polanka Wielka, der Teil der Agglomeration Oświęcim ist, durchgeführt. Projektumfang Das Projekt umfasst den Bau von Kanalisationssystemen im Rahmen des Projekts „Study Sanitary for Polanka Wielka – Phase I“ und umfasst Teil 2, Aufgaben 1-5. Das Projekt wird ein Sanitärkanalnetz auf den Straßen aufbauen: Aktivität 1. Straßen: Palast, Kastanowa, Długa, Stroma, Süden, Garten, Kirche, Länge der Kanalisation im Rahmen der Aufgabe: 2 390,2 m Aufgabe 2. Polna, Süd, Solar, Länge der Kanalisation: 3 853,7 m; Aufgabe 3. Solar, Wiese, Kanallänge: 3 198,2 m; Aufgabe 4. Lang, Süden, Norden, Kurz, Ruhig, Kanallänge: 5 269 m; Aufgabe 5. Länge der Kanalisation: 3 228 m. Gesamtlänge der sanitären Kanalisation, die Gegenstand des Projekts ist: 17 939,1 m (German)
    7 December 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0096/17
    0 references