Reconstruction of station 110/20/10 kV R-128 Wrocław Krzywoustego and 110/20 kV R-186 Oława (Q86142)

From EU Knowledge Graph
Revision as of 09:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q86142 in Poland
Language Label Description Also known as
English
Reconstruction of station 110/20/10 kV R-128 Wrocław Krzywoustego and 110/20 kV R-186 Oława
Project Q86142 in Poland

    Statements

    0 references
    10,552,928.03 zloty
    0 references
    2,532,702.73 Euro
    13 January 2020
    0 references
    19,504,587.89 zloty
    0 references
    4,681,101.09 Euro
    13 January 2020
    0 references
    54.1 percent
    0 references
    21 February 2017
    0 references
    30 June 2020
    0 references
    TAURON DYSTRYBUCJA S.A.
    0 references
    0 references

    50°57'26.6"N, 17°17'26.2"E
    0 references

    51°7'34.7"N, 16°58'41.5"E
    0 references
    Projekt polega na kompleksowej modernizacji dwóch stacji elektroenergetycznych, obejmującej w szczególności: - budowę, przebudowę i rozbiórkę urządzeń i infrastruktury technicznej stacji 110/20/10 kV R-128 Wrocław Krzywoustego; - budowę, przebudowę i rozbiórkę urządzeń i infrastruktury technicznej stacji 110/20 kV R-186 Oława. Planowane przedsięwzięcie dla stacji 110/20/10 kV R-128 Wrocław Krzywoustego obejmować będzie: • demontaż istniejących obiektów (w tym istniejącej rozdzielni 110 kV, demontaż i/lub dostosowanie elementów zagospodarowania terenu, demontaż obiektów kubaturowych); • niwelację terenu; • budowę rozdzielni napowietrznej 110 kV; • budowę 2 stanowisk transformatorów mocy 110/20/10 kV; • budowę budynku technicznego; • budowę wnętrzowej, 48-polowej rozdzielni SN; • budowę wnętrzowych 4 stanowisk transformatorów potrzeb własnych TPW; • przebudowę podejść liniowych 110 kV; • budowę połączeń kablowych SN; • budowę infrastruktury dostosowanej do nowego układu stacji 2. Planowane przedsięwzięcie dla stacji 110/20 kV R-186 Oława obejmować będzie: • demontaż istniejących obiektów (w tym istniejącej rozdzielni 110 kV, demontaż i/lub dostosowanie elementów zagospodarowania terenu w postaci, demontaż obiektów kubaturowych); • niwelację terenu; • budowę rozdzielni napowietrznej 110 kV; • budowę budynku technicznego; • budowę wnętrzowej, 44-polowej rozdzielni 20 kV; • budowę wnętrzowych stanowisk transformatorów potrzeb własnych TPW; • przebudowę wnętrzowych 2 stanowisk baterii kondensatorów równoległych BKR1 10 kV i BKR2; • przebudowę połączeń kablowych SN; • budowę infrastruktury dostosowanej do nowego układu stacji (Polish)
    0 references
    The project consists of a comprehensive modernisation of two power stations, including in particular: — construction, reconstruction and demolition of equipment and technical infrastructure of the station 110/20/10 kV R-128 Wrocław Krzywoustego; — construction, reconstruction and demolition of equipment and technical infrastructure of the station 110/20 kV R-186 Oława. The planned project for station 110/20/10 kV R-128 Wrocław Krzywoustego will include: • dismantling existing facilities (including the existing 110 kV switchboard, dismantling and/or adaptation of land development elements, dismantling of cubature facilities); • levelling the site; • construction of an overhead switchboard of 110 kV; • construction of 2 power transformers 110/20/10 kV; • construction of a technical building; • construction of an interior, 48-field SN switchgear; • construction of internal 4 transformer stations of the TPW’s own needs; • reconstruction of linear approaches of 110 kV; • construction of cable connections SN; • construction of infrastructure adapted to the new station system 2. The planned project for 110/20 kV R-186 Oława will include: • dismantling existing facilities (including the existing 110 kV switchboard, dismantling and/or adaptation of land development elements in the form of, dismantling of cubature facilities); • levelling the site; • construction of an overhead switchboard of 110 kV; • construction of a technical building; • construction of an interior, 44-field switchgear 20 kV; • construction of internal transformer stations of the TPW’s own needs; • internal reconstruction of 2 parallel capacitor batteries BKR1 10 kV and BKR2; • reconstruction of cable connections SN; • construction of infrastructure adapted to the new station layout (English)
    14 October 2020
    0 references
    Le projet consiste en une modernisation complète de deux centrales électriques, notamment: — construction, reconstruction et démolition d’équipements et d’infrastructures techniques station 110/20/10 kV R-128 Wrocław Krzywoustego; — construction, reconstruction et démolition d’équipements et d’infrastructures techniques station 110/20 kV R-186 Oława. Le projet prévu pour la station 110/20/10 kV R-128 Wrocław Krzywoustego comprendra: • le démantèlement des installations existantes (y compris les appareils de commutation existants de 110 kV, le démantèlement et/ou l’adaptation des éléments d’affectation des sols, le démantèlement des installations d’incubation); • le nivellement du terrain; • construction d’appareils de commutation aériens de 110 kV; • construction de 2 stations de transformateurs d’énergie 110/20/10 kV; • construction d’un bâtiment technique; • construction d’un appareillage intérieur SN 48 pôles; • construction de quatre postes de travail intérieurs de transformateurs pour les besoins du TPW; • réaménagement d’approches linéaires de 110 kV; • construction de connexions de câbles de la SN; • construction d’infrastructures adaptées à la nouvelle configuration de la gare 2. Le projet prévu pour 110/20 kV R-186 Oława comprendra: • le démantèlement des installations existantes (y compris les appareils de commutation existants de 110 kV, le démantèlement et/ou l’adaptation d’éléments d’aménagement du territoire sous la forme, le démantèlement des objets d’incubation); • le nivellement du terrain; • construction d’appareils de commutation aériens de 110 kV; • construction d’un bâtiment technique; • construction d’un appareil de commutation intérieur de 44 pôles de 20 kV; • la construction d’un transformateur intérieur correspond à ses propres besoins de TPW; • reconstruction intérieure de 2 stations de batteries des condensateurs parallèles BKR1 10 kV et BKR2; • réaménagement des connexions de câbles SN; • construction d’infrastructures adaptées à l’aménagement de la nouvelle gare (French)
    30 November 2021
    0 references
    Das Projekt umfasst eine umfassende Modernisierung zweier Kraftwerke, insbesondere: — Bau, Wiederaufbau und Abriss von Ausrüstung und technischer Infrastrukturstation 110/20/10 kV R-128 Wrocław Krzywoustego; — Bau, Wiederaufbau und Abriss von Ausrüstung und technischer Infrastruktur Station 110/20 kV R-186 Oława. Das geplante Projekt für 110/20/10 kV R-128 Wrocław Krzywoustego Station umfasst: • Abbau bestehender Anlagen (einschließlich bestehender 110 kV-Schaltanlagen, Demontage und/oder Anpassung von Flächennutzungselementen, Abbau von Brutanlagen); • Nivellierung des Geländes; • Bau einer 110 kV-Überkopfschaltanlage; • Bau von 2 110/20/10 kV Kraftwerken; • Bau eines technischen Gebäudes; • Bau einer 48-poligen SN-Schaltanlage; • Bau von vier Transformator-Arbeitsplätzen für die Bedürfnisse der TPW; • Neuentwicklung von 110 kV linearen Ansätzen; • Bau von Kabelanschlüssen der SN; • Bau einer an das neue Bahnhofslayout angepassten Infrastruktur 2. Das geplante Projekt für 110/20 kV R-186 Oława umfasst: • Abbau bestehender Anlagen (einschließlich bestehender 110 kV-Schaltanlagen, Demontage und/oder Anpassung von Landbewirtschaftungselementen in Form, Demontage von Brutobjekten); • Nivellierung des Geländes; • Bau einer 110 kV-Überkopfschaltanlage; • Bau eines technischen Gebäudes; • Bau einer Innenausstattung, 44-poliger 20 kV Schaltanlage; • der Bau des Innentransformators steht für die eigenen Bedürfnisse von TPW; • Innenumbau von 2 Batteriestationen paralleler Kondensatoren BKR1 10 kV und BKR2; • Sanierung von SN-Kabelanschlüssen; • Bau einer an das neue Bahnhofslayout angepassten Infrastruktur (German)
    7 December 2021
    0 references

    Identifiers

    POIS.07.01.00-00-0023/16
    0 references