Extension and modernisation of the sewage treatment plant in Wągrowiec (Q85266)

From EU Knowledge Graph
Revision as of 09:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85266 in Poland
Language Label Description Also known as
English
Extension and modernisation of the sewage treatment plant in Wągrowiec
Project Q85266 in Poland

    Statements

    0 references
    24,587,065.89 zloty
    0 references
    5,900,895.81 Euro
    13 January 2020
    0 references
    28,925,959.88 zloty
    0 references
    6,942,230.37 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    MIEJSKIE PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SPÓŁKA Z O.O. W WĄGROWCU
    0 references
    0 references
    0 references
    Projekt realizowany w granicach aglomeracji Wągrowiec o wielkości 33 300 RLM. Zakres projektu: Modernizacja oczyszczalni ścieków w Wągrowcu obejmująca część mechaniczną, biologiczną i osadową wraz z współpracującą z oczyszczalnią -główną przepompownią przy ul. Klasztornej i rurociągami tłocznymi L=2x1,8 km. Wdrożenie inteligentnego systemu zarządzania sieciami wodno-kanalizacyjnymi - GIS. Modernizacja oczyszczalni ma na celu zoptymalizowanie przepustowości oczyszczalni oraz zapewnienie stabilności jej pracy, w tym odnotowywanych zakłóceń w procesach nitryfikacji i denitryfikacji. W ramach zadania podniesiona zostanie sprawność węzła do przeróbki osadów. Zakres inwestycji będzie obejmował m.in. budowę nowej przepompowni osadu recylkulowanego, wprowadzenie nowego systemu mechanicznego zagęszczania osadu nadmiernego, budowę wiaty. (Polish)
    0 references
    The project is carried out within the boundaries of the agglomeration Wągrowiec with a size of 33 300 RLM. Scope of the project: Modernisation of the sewage treatment plant in Wągrowiec including mechanical, biological and sediment parts together with the main pumping plant at ul. Monastic and pressing pipelines L=2x1,8 km. Implementation of an intelligent management system for water and sewage networks – GIS. Modernisation of the treatment plant is aimed at optimising the throughput of the treatment plant and ensuring the stability of its operation, including the observed disruption of nitrification and denitrification processes. As part of the task, the efficiency of the node for sediment processing will be improved. The scope of the investment will include the construction of a new recylculated sludge pumping station, the introduction of a new mechanical system of excessive sludge compaction, construction of a shelter. (English)
    14 October 2020
    0 references
    Projet mis en œuvre dans les limites de l’agglomération de Wągrowiec d’une taille de 33 300 EH. Portée du projet: Modernisation de l’usine de traitement des eaux usées de Wągrowiec couvrant les parties mécaniques, biologiques et des boues ainsi que de la station de pompage principale à ul. Couvent et canalisations sous pression L=2x1,8 km. Mise en place d’un système de gestion intelligent des réseaux d’eau et d’assainissement — SIG. La modernisation de l’usine vise à optimiser la capacité de l’usine et à assurer la stabilité de son fonctionnement, y compris les perturbations observées dans les processus de nitrification et de dénitrification. Dans le cadre de cette tâche, l’efficacité du nœud de traitement des boues sera améliorée. La portée de l’investissement comprendra, entre autres, la construction d’une nouvelle station de pompage de boues recyclées, l’introduction d’un nouveau système de compactage mécanique des boues excessives, la construction d’un hangar. (French)
    30 November 2021
    0 references
    Projekt, das innerhalb der Grenzen des Ballungsraums Wągrowiec mit einer Größe von 33 300 EE durchgeführt wird. Umfang des Projekts: Modernisierung der Abwasserbehandlungsanlage Wągrowiec, die mechanische, biologische und Schlammteile zusammen mit der Hauptpumpe in ul umfasst. Kloster- und Druckleitungen L=2x1,8 km. Einführung eines intelligenten Managementsystems für Wasser- und Abwassernetze – GIS. Die Modernisierung der Anlage zielt darauf ab, die Kapazität der Anlage zu optimieren und die Stabilität ihres Betriebs zu gewährleisten, einschließlich beobachteter Störungen bei Nitrifikations- und Denitrifikationsprozessen. Im Rahmen der Aufgabe wird die Effizienz des Schlammaufbereitungsknotens verbessert. Der Umfang der Investition wird unter anderem den Bau einer neuen Pumpstation für recycelten Schlamm, die Einführung eines neuen Systems der mechanischen Verdichtung von übermäßigem Schlamm, den Bau eines Schuppens umfassen. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0061/17
    0 references