Insulated network 6 kV m. Rzeszowa at a voltage of 15 kV – modernisation of three 110/SN stations: Rzeszów Staromieście, Staroniva and Rzeszów Centralna. (Q86097)

From EU Knowledge Graph
Revision as of 09:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q86097 in Poland
Language Label Description Also known as
English
Insulated network 6 kV m. Rzeszowa at a voltage of 15 kV – modernisation of three 110/SN stations: Rzeszów Staromieście, Staroniva and Rzeszów Centralna.
Project Q86097 in Poland

    Statements

    0 references
    17,852,316.83 zloty
    0 references
    4,284,556.04 Euro
    13 January 2020
    0 references
    27,000,666.09 zloty
    0 references
    6,480,159.86 Euro
    13 January 2020
    0 references
    66.12 percent
    0 references
    15 June 2016
    0 references
    30 June 2019
    0 references
    PGE DYSTRYBUCJA S.A.
    0 references
    0 references

    50°0'25.9"N, 22°0'35.6"E
    0 references
    Projekt będzie realizowany w woj. podkarpackim, na terenie m. Rzeszowa w trzech lokalizacjach. Przedmiotem Projektu jest modernizacja trzech stacji WN/SN: Rzeszów Centralna, Rzeszów Staromieście oraz Staroniwa, której celem jest przystosowanie istniejącej sieci 6 kV znajdującej się na terenie miasta Rzeszowa do pracy na napięciu 15 kV. W ramach projektu na stacjach zostaną wymienione transformatory 110/SN na transformatory dwuuzwojeniowe o przekładni 110/15 kV. Z uwagi m.in. na znaczny stopień wyeksploatowania urządzeń 110 kV oraz potrzebę zwiększenia pewności zasilania, w stacjach Rzeszów Centralna i Staroniwa zostanie przebudowana rozdzielnia 110 kV do układu H 5 w technologii GIS oraz przebudowana rozdzielnia SN. W stacji WN/SN Rzeszów Centrala i Staroniwa wybudowany zostanie nowy budynek stacji z wnętrzową rozdzielnią 110 kV w systemie GIS, rozdzielnią 15 kV, stanowiskami transformatorów mocy, transformatorów PW i DG, stanowiskami BKR, innymi pomieszczeniami niezbędnymi do funkcjonowania GPZ. W stacji Rzeszów Staromieście zabudowana zostanie nowa rozdzielnia 15 kV. We wszystkich stacjach zostaną wymienione także transformatory mocy (po dwa w każdej stacji). (Polish)
    0 references
    The project will be implemented in the Podkarpackie Voivodeship, on the territory of Rzeszów in three locations. The subject of the Project is the modernisation of three WN/SN stations: Rzeszów Centralna, Rzeszów Staromieście and Staroniwa, whose aim is to adapt the existing 6 kV network located in the town of Rzeszów to work at a voltage of 15 kV. As part of the project, the 110/SN transformers will be replaced with 110/15 kV double winding transformers. Due to, among other things, the high level of operation of 110 kV devices and the need to increase power security, the Rzeszów Central and Staroniwa stations will reconstruct the 110 kV switchgear for the H 5 system in GIS technology and reconstructed SN switching system. At WN/SN Rzeszów Station, Centrala and Staroniwa will build a new station building with internal 110 kV switching room in the GIS system, 15 kV switching room, power transformers, PW and DG transformers, BKR stations, other rooms necessary for the operation of the GPZ. At the Rzeszów Staromieście station a new 15 kV distribution room will be built. All stations will also be replaced with power transformers (two in each station). (English)
    14 October 2020
    0 references
    Le projet sera mis en œuvre dans la voïvodie de Podkarpackie, à Rzeszów, dans trois localités. Le projet porte sur la modernisation de trois stations du NNO/SN: Rzeszów Centralna, Rzeszów Staromieście et Staroniw, dont l’objectif est d’adapter le réseau existant de 6 kV situé dans la ville de Rzeszów pour fonctionner à une tension de 15 kV. Dans le cadre du projet, les transformateurs 110/SN seront remplacés par des transformateurs à double remontage avec des boîtes de vitesses 110/15 kV. En raison, entre autres, du degré élevé d’utilisation des appareils de 110 kV et de la nécessité d’accroître la sécurité d’alimentation électrique, les appareils de commutation de 110 kV seront reconstruits aux stations Rzeszów Central et Staroniw à H 5 en technologie SIG et à l’appareillage SN reconstruit. Dans les stations WN/SN Rzeszów Centrala et Staroniw, un nouveau bâtiment sera construit avec un appareillage intérieur de 110 kV dans le système SIG, des appareils de commutation de 15 kV, des transformateurs de puissance, des transformateurs PW et DG, des stations BKR, d’autres locaux nécessaires au fonctionnement du GPZ. Un nouvel appareillage de 15 kV sera construit dans la station Rzeszów Staromieście. Les transformateurs d’énergie (deux dans chaque station) seront également remplacés dans toutes les stations. (French)
    30 November 2021
    0 references
    Das Projekt wird in der Woiwodschaft Podkarpackie in Rzeszów an drei Standorten durchgeführt. Das Projekt betrifft die Modernisierung von drei WN/SN-Stationen: Rzeszów Centralna, Rzeszów Staromieście und Staroniw, deren Ziel es ist, das bestehende 6 kV-Netz in der Stadt Rzeszów an eine Spannung von 15 kV anzupassen. Im Rahmen des Projekts werden 110/SN-Transformatoren durch Zweiwickler mit 110/15 kV Getrieben ersetzt. Aufgrund der erheblichen Auslastung von 110 kV-Geräten und der Notwendigkeit, die Sicherheit der Stromversorgung zu erhöhen, wird die 110 kV Schaltanlage an den Stationen Rzeszów Central und Staroniw auf H 5 in der GIS-Technologie und der umgebauten SN-Schaltanlage umgebaut. In der Station WN/SN Rzeszów Centrala und Staroniw wird ein neues Bahnhofsgebäude mit 110 kV Innenschaltanlage im GIS-System, 15 kV Schaltanlagen, Leistungstransformatoren, PW und DG Transformatoren, BKR-Stationen, andere Räume für den Betrieb des GPZ gebaut. Im Bahnhof Rzeszów Staromieście wird eine neue 15 kV Schaltanlage errichtet. Auch Stromtransformatoren (zwei in jeder Station) werden in allen Stationen ersetzt. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.07.01.00-00-0001/16
    0 references