Modernisation of selected stations on railway lines 353, 131 and 3 (Q86005)

From EU Knowledge Graph
Revision as of 09:34, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q86005 in Poland
Language Label Description Also known as
English
Modernisation of selected stations on railway lines 353, 131 and 3
Project Q86005 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    73,373,143.21 zloty
    0 references
    17,609,554.37 Euro
    13 January 2020
    0 references
    86,321,344.96 zloty
    0 references
    20,717,122.79 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2022
    0 references
    POLSKIE KOLEJE PAŃSTWOWE S.A.
    0 references
    0 references
    0 references

    52°33'24.1"N, 19°2'30.8"E
    0 references

    52°31'26.0"N, 16°18'54.0"E
    0 references

    52°24'2.2"N, 16°55'11.3"E
    0 references

    52°23'49.2"N, 17°12'54.4"E
    0 references
    Przedmiotowy projekt jest zlokalizowany na terenie woj. wielkopolskiego i kujawsko-pomorskiego. Projekt obejmuje przebudowę 11 dw. kolejowych tj.: 1. Biskupice Wielkopolskie; 2. Janikowo; 3. Kobylnica; 4. Kołodziejewo; 5. Mogilno; 6. Pierzyska; 7. Pobiedziska; 8. Pobiedziska Letnisko; 9. Poznań Główny (Stary); 10. Trzemeszno; 11. Złotniki Kujawskie. Większość dw. (tj. 9) zlokalizowanych jest przy linii kolejowej nr 353 i są to następujące lokalizacje: Biskupice Wielkopolskie, Janikowo, Kołodziejewo, Mogilno, Pierzyska, Trzemeszno, Kobylnica, Pobiedziska, Pobiedziska Letnisko. Pozostałe 2 dw. ujęte w zakresie to: Złotniki Kujawskie leżące przy linii nr 131 i Poznań Główny (Stary) leżący przy linii kolejowej nr 3. Obecny stan techniczny większości dworców jest określony jako średni lub zadowalający, obiekty nie są przystosowane do potrzeb osób niepełnosprawnych, nie spełniają wymogów TSI-PRM oraz współczesnych standardów i oczekiwań pasażerów. Oprócz dw. Poznań Główny (Stary), wszystkie obiekty są czynne tj. prowadzona jest w nich obsługa podróżnych. Wszystkie dworce ujęte w projekcie z wyjątkiem dw. Janikowo, Pobiedziska Letnisko, Poznań Główny (Stary) są objęte ochroną konserwatorską. Zakres prac obejmuje: - przebudowę i modernizację istniejących obiektów 11 dworców wchodzących w zakres projektu, - wykonanie prac wykończeniowych wnętrz i na zewnątrz budynków zgodnie ze specyfikacją szczegółową opracowaną dla każdego z dworców, - dostosowanie obiektów do potrzeb osób niepełnosprawnych zgodnie z wytycznymi TSI-PRM, - zagospodarowanie terenów wokół dworców w tym m.in. wymianę nawierzchni, nasadzenia zieleni, elementy małej architektury, budowa infrastruktury rowerowej, - budowę dróg dojazdowych i parkingów przed dworcami, - przywrócenie historycznego wyglądu obiektów w zakresie podlegającym ochronie konserwatorskiej, - prace rozbiórkowe infrastruktury towarzyszącej, - zintegrowanie dworców z innymi środkami transportu. (Polish)
    0 references
    The project is located in Wielkopolska and Kujawsko-Pomorskie voivodeships. The project involves the reconstruction of 11 double railways, i.e.: 1. Biskupice Wielkopolskie; 2. Janikovovo, 3. Kobylnica; 4. Kołodziejevo; 5. It’s Mogilno; 6. The first one; 7. Pobiedziska; 8. Pobiedziska Summer; 9. Poznań Główny (Old) 10. It’s three times; 11. It’s the Kujawskie Goldworms. Most of them. (i.e. 9) located on railway line No 353 and these are the following locations: Biskupice Wielkopolskie, Janikowo, Kolodziejewo, Mogilno, Pierzyska, Trzemeszno, Kobylnica, Pobiedziska, Pobiedziska Summernisko. The remaining 2 units covered are: Złotniki Kujawskie located on line 131 and Poznań Główny (Stary) located on railway line No. 3. The current technical status of most stations is defined as medium or satisfactory, the facilities are not adapted to the needs of persons with disabilities, do not meet the requirements of TSI-PRM and modern passenger standards and expectations. Except for two. Poznań Główny (Old), all facilities are open, i.e. there is a service for travellers. All stations included in the project with the exception of two. Janikowo, Pobiedziska Summernisko, Poznań Główny (Old) are protected by conservation. The scope of work shall include: — reconstruction and modernisation of existing facilities of 11 stations falling within the scope of the project, – completion of interior and exterior works in accordance with the detailed specification developed for each of the stations, – adaptation of objects to the needs of disabled persons in accordance with TSI-PRM guidelines, – development of areas around the station including, among others, replacement of the manor’s surface, planting greenery, elements of small architecture, construction of bicycle infrastructure, – construction of access roads and car parks in front of the stations, – restoration of the historical appearance of buildings. (English)
    14 October 2020
    0 references
    Le projet est situé dans les voïvodies de Wielkopolska et de Kujawsko-Pomorskie. Le projet prévoit la conversion de 11 logements ferroviaires, à savoir: 1. Biskupice Wielkopolskie; 2. Janikowo; 3. Kobylnica; 4. Kolodziejevo; 5. Mogilno; 6. Pierzyska; 7. Pobiedziska; 8. Pobiedziska été; 9. Poznań Main (Ancien); 10. Trzemeszno; 11. Orfèvres de Kujawskie. La plupart des deux. (c’est-à-dire 9) situé sur la ligne de chemin de fer 353 et il s’agit des emplacements suivants: Biskupice Wielkopolskie, Janikowo, Kołodziejewo, Mogilno, Pierzyska, Trzemeszno, Kobylnica, Pobiedziska Summer. Les 2 autres poids lourds inclus dans le champ d’application sont: Złotniki Kujawskie située sur la ligne 131 et Poznań Główny (ancienne) sur la ligne de chemin de fer 3. L’état technique actuel de la plupart des gares est défini comme moyen ou satisfaisant, les installations ne sont pas adaptées aux besoins des personnes handicapées, ne répondent pas aux exigences de la STI-PRM et aux normes et attentes modernes des passagers. Sauf deux. Poznań Main (Old), tous les objets sont actifs, c’est-à-dire que le service de voyage y est effectué. Toutes les stations incluses dans le projet sauf deux. Janikowo, Pobiedziska Summernisko, Poznań Główny (ancien) sont protégés par la conservation. La portée des travaux comprend: — la reconstruction et la modernisation des installations existantes de 11 stations relevant du projet, — l’exécution des travaux de finition intérieure et extérieure conformément aux spécifications détaillées établies pour chacune des stations, — l’adaptation des installations aux besoins des personnes handicapées conformément aux lignes directrices STI-PRM, — le développement de la zone autour des stations, y compris, entre autres, le remplacement des trottoirs, la plantation de verdure, éléments de petite architecture, construction d’infrastructures cyclables, — construction de routes d’accès et de parkings devant les gares, — restauration de l’aspect historique des installations dans la zone couverte par la protection de la conservation, — démolition des infrastructures d’accompagnement, — intégration des gares avec d’autres moyens de transport. (French)
    30 November 2021
    0 references
    Das Projekt befindet sich in den Woiwodschaften Wielkopolska und Kujawsko-Pomorskie. Das Projekt umfasst die Umstellung von 11 Eisenbahnwohnungen, d. h.: 1. Biskupice Wielkopolskie; 2. Janikowo; 3. Kobylnica; 4. Kolodziejevo; 5. Mogilno; 6. Pierzyska; 7. Pobiedziska; 8. Pobiedziska Sommer; 9. Poznań Main (alte); 10. Trzemeszno; 11. Goldschmiede von Kujawskie. Die meisten von beiden. (d. h. 9) befindet sich auf der Bahnlinie 353 und dies sind die folgenden Standorte: Biskupice Wielkopolskie, Janikowo, Kołodziejewo, Mogilno, Pierzyska, Trzemeszno, Kobylnica, Pobiedziska Sommer. Die anderen 2 dw., die in den Anwendungsbereich fallen, sind: Złotniki Kujawskie liegt auf der Linie 131 und Poznań Główny (Alte) auf der Bahnlinie 3. Der derzeitige technische Zustand der meisten Stationen wird als mittel- oder zufrieden stellend definiert, die Einrichtungen sind nicht an die Bedürfnisse von Menschen mit Behinderungen angepasst, entsprechen nicht den Anforderungen der TSI-PRM und den modernen Normen und Erwartungen der Fahrgäste. Außer zwei. Poznań Main (Alt), alle Objekte sind aktiv, d. h. der Reisedienst wird in ihnen durchgeführt. Alle im Projekt enthaltenen Stationen mit Ausnahme von zwei Stationen. Janikowo, Pobiedziska Summernisko, Posen Główny (Alte) sind durch Naturschutz geschützt. Der Umfang der Arbeiten umfasst: — die Sanierung und Modernisierung der bestehenden Anlagen von 11 Stationen, die in den Geltungsbereich des Projekts fallen, – die Durchführung von Innen- und Außenveredelungsarbeiten gemäß den detaillierten Spezifikationen für die einzelnen Stationen, – Anpassung der Einrichtungen an die Bedürfnisse von Menschen mit Behinderungen gemäß den TSI-PRM-Richtlinien, – Entwicklung des Gebiets um die Stationen, einschließlich u. a. des Austauschs von Gehwegen, der Bepflanzung von Grünanlagen; Elemente der kleinen Architektur, Bau der Fahrradinfrastruktur, – Bau von Zufahrtsstraßen und Parkplätzen vor den Bahnhöfen, – Restaurierung des historischen Aussehens der Einrichtungen in dem vom Naturschutz abgedeckten Gebiet, – Abriss der begleitenden Infrastruktur, – Integration von Bahnhöfen mit anderen Verkehrsmitteln. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.05.01.00-00-0034/18
    0 references