“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II (Q85875)

From EU Knowledge Graph
Revision as of 09:27, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85875 in Poland
Language Label Description Also known as
English
“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II
Project Q85875 in Poland

    Statements

    0 references
    38,024,318.84 zloty
    0 references
    9,125,836.52 Euro
    13 January 2020
    0 references
    44,734,492.76 zloty
    0 references
    10,736,278.26 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2019
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    50°18'4.0"N, 18°39'44.3"E
    0 references

    50°23'29.8"N, 18°36'39.2"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references
    Projekt polega na wykoniu kompleksowych prac budowlanych prowadzących do modernizacji dwóch śluz na Kanale Gliwickim - Łabędy i Dzierżno. Wykonanie prac pozwoli na skrócenie okresu śluzowania na śluzie Łabędy o 7 minut, a na śkuzie Dzierżno o 10 minut. (Polish)
    0 references
    The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English)
    14 October 2020
    0 references
    Le projet consiste à achever des travaux de construction complets menant à la modernisation de deux écluses sur le canal Gliwice — Łabędy et Dzierżno. L’exécution des travaux réduira de 7 minutes la période de fermeture de l’écluse de Łabędy et de 10 minutes sur la Śkuzie Dzierżno. (French)
    30 November 2021
    0 references
    Das Projekt besteht in der Fertigstellung umfassender Bauarbeiten, die zur Modernisierung von zwei Schleusen auf dem Gliwice-Kanal – Łabędy und Dzierżno – führen. Die Ausführung der Arbeiten wird die Sperrfrist auf der Schleuse Łabędy um 7 Minuten und auf der Śkuzie Dzierżno um 10 Minuten verkürzen. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.03.02.00-00-0001/16
    0 references