Construction of the S61 expressway. Ostrów Mazowiecka – Szczuczyn (Q85873)

From EU Knowledge Graph
Revision as of 09:27, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85873 in Poland
Language Label Description Also known as
English
Construction of the S61 expressway. Ostrów Mazowiecka – Szczuczyn
Project Q85873 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    1,636,870,479.79 zloty
    0 references
    392,848,915.15 Euro
    13 January 2020
    0 references
    1,925,729,976.23 zloty
    0 references
    462,175,194.3 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°56'55.7"N, 21°45'31.3"E
    0 references

    52°47'26.2"N, 19°51'23.0"E
    0 references

    53°33'18.4"N, 22°25'8.0"E
    0 references

    53°23'31.9"N, 21°57'31.7"E
    0 references

    53°12'29.9"N, 22°16'39.4"E
    0 references

    53°1'21.7"N, 22°14'52.8"E
    0 references
    Projekt ma na celu budowę drogi ekspresowej S61 odc. Ostrów Mazowiecka–Szczuczyn o dł. 91 km. Inwestycja położona jest w północno-wschodniej części Polski i przebiega przez obszar woj. mazowieckiego i podlaskiego. Projektowana droga przebiega częściowo po nowym śladzie głównie po zachodniej stronie istniejącej dk nr 63 oraz częściowo w ciągu istniejącego odcinka dk nr 61. Na całym odcinku przedmiotowej inwestycji przewidziano przekrój dwujezdniowy z dwoma pasami ruchu oraz pasem awaryjnym, dostosowany do prognozowanego poziomu ruchu. (Polish)
    0 references
    The project aims to build the S61 expressway. Ostrów Mazowiecka-Szczuczyn o dł. It’s 91 miles. The investment is located in the north-eastern part of Poland and runs through the Mazowieckie and Podlaskie voivodeships. The projected road runs partly on a new footprint mainly on the western side of existing Dk No 63 and partly within the existing section 61. A two-way cross-section with two lanes and an emergency lane, adapted to the forecast traffic level, is provided throughout the investment. (English)
    14 October 2020
    0 references
    Le projet vise à construire l’autoroute S61 odc. Ostrów Mazowiecka-Szczuczyn depuis longtemps. 91 km. L’investissement est situé dans la partie nord-est de la Pologne et traverse les voïvodies Mazowieckie et Podlaskie. La route prévue suit en partie une nouvelle empreinte, principalement du côté ouest de la dk 63 existante et en partie à l’intérieur de la section existante dk 61. Pour l’ensemble du tronçon de l’investissement, un tronçon à deux voies avec deux voies et une voie d’urgence est prévu, adapté au niveau de trafic prévu. (French)
    30 November 2021
    0 references
    Das Projekt zielt darauf ab, die Schnellstraße S61 odc zu bauen. Ostrów Mazowiecka-Szczuczyn für eine lange Zeit. 91 km. Die Investition befindet sich im Nordosten Polens und verläuft durch die Woiwodschaft Mazowieckie und Podlaskie. Die geplante Straße folgt teilweise einem neuen Fußabdruck hauptsächlich auf der Westseite des bestehenden dk 63 und teilweise innerhalb des bestehenden Abschnitts dk 61. Für den gesamten Teil der Investition ist ein zweispuriger Abschnitt mit zwei Fahrspuren und einer Notspur vorgesehen, der an das prognostizierte Verkehrsniveau angepasst ist. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.03.01.00-00-0054/19
    0 references