Reconstruction of 110/15 kV Thundering station to enable the development of renewable energy (Q84419)

From EU Knowledge Graph
Revision as of 09:23, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q84419 in Poland
Language Label Description Also known as
English
Reconstruction of 110/15 kV Thundering station to enable the development of renewable energy
Project Q84419 in Poland

    Statements

    0 references
    2,255,663.47 zloty
    0 references
    541,359.23 Euro
    13 January 2020
    0 references
    3,095,000.0 zloty
    0 references
    742,800.0 Euro
    13 January 2020
    0 references
    72.88 percent
    0 references
    20 December 2018
    0 references
    30 September 2020
    0 references
    ENERGA-OPERATOR SPÓŁKA AKCYJNA
    0 references
    0 references
    0 references
    0 references
    Zakres Projektu obejmuje przebudowę stacji elektroenergetycznej GPZ 110/15 kV Grzmiąca celem umożliwienia rozwoju energetyki odnawialnej. Stacja stanowi element sieci dystrybucyjnej na napięciu 110 kV, na której odbywa się transformacja energii elektrycznej na napięcie 15 kV. Stacja 110/15 kV Grzmiąca zlokalizowana jest przy ul. Spółdzielczej 14 w miejscowości Grzmiąca (gmina Grzmiąca) na działkach nr 4/23 i 4/25, obręb 0013-Grzmiąca. Grunt znajduje się w użytkowaniu wieczystym ENERGA-OPERATOR SA (KO1I/00029281/4 i KO1I/00022121/6). Powierzchnia łączna nieruchomości, na których zlokalizowana jest stacja wynosi 1,0425 ha. Gmina Grzmiąca jest położona we wschodniej części województwa zachodniopomorskiego w powiecie szczecineckim. Gmina Grzmiąca jest jedną z 9 gmin powiatu szczecineckiego. Sąsiaduje z gminami Szczecinek, Barwice (p. szczecinecki), Bobolice (p. białogardzki) i Tychowo (p. koszaliński). Celem bezpośrednim Projektu jest zwiększenie potencjału dla przyłączania źródeł energii odnawialnej do sieci, a także zwiększenie niezawodności dostaw energii elektrycznej na obszarze oddziaływania projektu. Celami pośrednimi projektu są: • poprawa parametrów energetycznych dostarczanej energii, • przyczynienie się, poprzez zwiększenie możliwości przyjęcia do sieci większej ilości energii z OZE, do ograniczenia zapotrzebowania na produkcję energii ze źródeł konwencjonalnych, a tym samym zmniejszenie zużycia paliw i, w konsekwencji, obniżenie emisji zanieczyszczeń do atmosfery, • poprawa efektywności pracy systemu dystrybucyjnego. Celem Projektu na poziomie produktu jest: a) modernizacja 1 stacji elektroenergetycznej, b) dodatkowa zdolność przyłączania źródeł odnawialnych do sieci elektroenergetycznej w wysokości 8,36 MW. Celem Projektu na poziomie rezultatu jest: spadek emisji gazów cieplarnianych. Cel ten zostanie osiągnięty poprzez zwiększenie zdolności przyłączania źródeł energii odnawialnej do sieci. Celem Projektu na poziomie oddziaływania jest: popra (Polish)
    0 references
    The scope of the project includes the reconstruction of the power station GPZ 110/15 kV Thundering to enable the development of renewable energy. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV. 110/15 kV Thundering Station is located at ul. Co-operative 14 in Grzmijąca (Grzmijąca commune) on plots No. 4/23 and 4/25, 0013-Budder area. The land is in perpetual use of ENERGA-OPERATOR SA (KO1I/00029281/4 and KO1I/00022121/6). The total area of the property on which the station is located is 1.0425 ha. The municipality is located in the eastern part of the Zachodniopomorskie Voivodeship in Szczecin County. The municipality is one of the 9 communes of Szczecin County. It is adjacent to the gminas of Szczecinek, Barwice (p. Szczecinecki), Bobolice (b.Belagard) and Tychowo (Mr. Kosaliński). The direct objective of the Project is to increase the potential for connecting renewable energy sources to the grid, and to increase the reliability of electricity supply in the area of impact of the project. The indirect objectives of the project shall be: • improving the energy performance of the supplied energy, • contributing, by increasing the ability to take more energy from RES into the grid, to reduce the demand for the production of energy from conventional sources, thereby reducing fuel consumption and, consequently, reducing emissions of pollutants into the atmosphere, • improving the efficiency of the distribution system. The aim of the Project at product level is to: modernisation of 1 power stations, (b) additional capacity to connect renewables to the electricity grid of 8,36 MW. The project’s objective at the result level is to: reduction of greenhouse gas emissions. This will be achieved by increasing the capacity to connect renewable energy sources to the grid. The Project’s objective at the level of impact is to: it’s a good thing. (English)
    14 October 2020
    0 references
    Le projet comprend la reconstruction de la centrale électrique GPZ 110/15 kV Sounding afin de permettre le développement des énergies renouvelables. La station fait partie d’un réseau de distribution de 110 kV sur lequel l’électricité est transformée en une tension de 15 kV. La station 110/15 kV Sounding est située à l’adresse ul. Spółdzielcza 14 dans la ville de Grzminicza (municipalité du son) sur les parcelles nos 4/23 et 4/25, zone 0013-Thundering. Le terrain est utilisé à perpétuité par ENERGA-OPERATOR SA (KO1I/00029281/4 et KO1I/00022121/6). La superficie totale de la propriété sur laquelle se trouve la station est de 1,0425 ha. La commune est située dans la partie orientale de la voïvodie de Poméranie occidentale dans le comté de Szczecin. La municipalité de Szczeecinecki est l’une des 9 communes du district de Szczeecinecki. Elle est adjacente aux communes de Szczecinek, Barwice (p. Szczeecinecki), Bobolice (p. Białogardd) et Tychowo (p. Koszaliński). L’objectif direct du projet est d’accroître le potentiel de raccordement des sources d’énergie renouvelables au réseau et d’accroître la fiabilité de l’approvisionnement en électricité dans la zone touchée par le projet. Les objectifs intermédiaires du projet sont les suivants: • l’amélioration de la performance énergétique de l’énergie fournie, • en contribuant, en augmentant la capacité d’absorption d’énergie renouvelable dans le réseau, à réduire la demande de production d’énergie à partir de sources conventionnelles, réduisant ainsi la consommation de carburant et, par conséquent, réduisant les émissions de polluants dans l’atmosphère, • l’amélioration de l’efficacité du système de distribution. L’objectif du projet au niveau des produits est de: modernisation d’une centrale électrique, b) capacité supplémentaire de raccordement des sources d’énergie renouvelables au réseau électrique de 8,36 MW. L’objectif du projet au niveau des résultats est de: une diminution des émissions de gaz à effet de serre. Pour ce faire, il sera possible d’accroître la capacité de connecter les sources d’énergie renouvelables au réseau. L’objectif du projet au niveau de l’impact est de: bienvenue (French)
    30 November 2021
    0 references
    Das Projekt umfasst den Umbau des Kraftwerks GPZ 110/15 kV Sounding, um die Entwicklung erneuerbarer Energien zu ermöglichen. Die Station ist Teil eines 110 kV-Verteilnetzes, auf dem Strom in eine Spannung von 15 kV umgewandelt wird. Station 110/15 kV Das Sounding befindet sich in ul. Spółdzielcza 14 in der Stadt Grzminicza (Gemeinde des Schalls) auf den Grundstücken Nr. 4/23 und 4/25, Bereich 0013-Thundering. Das Grundstück wird ständig von ENERGA-OPERATOR SA (KO1I/00029281/4 und KO1I/00022121/6) genutzt. Die Gesamtfläche des Grundstücks, auf dem sich der Bahnhof befindet, beträgt 1,0425 ha. Die Gemeinde liegt im östlichen Teil der Woiwodschaft Westpommern im Kreis Szczecin. Die Stadtgemeinde ist eine der 9 Gemeinden des Bezirks Szczeecinecki. Sie grenzt an die Gemeinden Szczecinek, Barwice (Szczeecinecki), Bobolice (S. Białogardd) und Tychowo (S. Koszaliński). Das direkte Ziel des Projekts besteht darin, das Potenzial für die Anbindung erneuerbarer Energiequellen an das Netz zu erhöhen und die Zuverlässigkeit der Stromversorgung in dem vom Projekt betroffenen Gebiet zu erhöhen. Die Zwischenziele des Projekts sind: • Verbesserung der Energieeffizienz der gelieferten Energie, • Beitrag zur Erhöhung der Kapazität, mehr EE-Energie in das Netz aufzunehmen, zur Verringerung der Nachfrage nach Energieerzeugung aus konventionellen Quellen, wodurch der Kraftstoffverbrauch verringert und damit die Schadstoffemissionen in die Atmosphäre verringert werden, • Verbesserung der Effizienz des Verteilersystems. Ziel des Projekts auf Produktebene ist es, Modernisierung eines Kraftwerks, b) zusätzliche Kapazität zur Anbindung erneuerbarer Energiequellen an das Stromnetz von 8,36 MW. Ziel des Projekts auf Ergebnisebene ist es, Verringerung der Treibhausgasemissionen. Dies wird durch die Erhöhung der Kapazität zur Anbindung erneuerbarer Energiequellen an das Netz erreicht. Ziel des Projekts auf der Wirkungsebene ist es, willkommen (German)
    7 December 2021
    0 references

    Identifiers

    POIS.01.01.02-00-0005/18
    0 references