Public Drainage and Wastewater Treatment of Figueiró da Serra (Q2982623)
Jump to navigation
Jump to search
Project Q2982623 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Public Drainage and Wastewater Treatment of Figueiró da Serra |
Project Q2982623 in Portugal |
Statements
274,909.0 Euro
0 references
323,423.0 Euro
0 references
85.0 percent
0 references
5 April 2018
0 references
30 October 2020
0 references
MUNICÍPIO DE GOUVEIA
0 references
Q2991041 (Deleted Item)
0 references
O projeto da Drenagem Pública e Tratamento de Águas Residuais de Figueiró da Serra, a implementar na localidade de Figueiró da Serra, surge com vista ao reajuste da rede de drenagem desta localidade, dando cumprimento às normas de descarga dos efluentes. (Portuguese)
0 references
The project of the Public Drainage and Wastewater Treatment of Figueiró da Serra, to be implemented in the locality of Figueiró da Serra, emerges with a view to the readjustment of the drainage network of this locality, complying with the standards of discharge of the effluents. (English)
9 July 2021
0 references
Le projet de drainage public et de traitement des eaux usées de Figueiró da Serra, qui doit être mis en œuvre dans la localité de Figueiró da Serra, a pour objet l’adaptation du réseau de drainage de cette localité, conformément aux normes de rejet des effluents. (French)
7 December 2021
0 references
Gouveia, União das freguesias de Figueiró da Serra e Freixo da Serra
0 references
Identifiers
POSEUR-03-2012-FC-000995
0 references