Works at the Water Treatment Station of the Foundation (Q2982602)
Jump to navigation
Jump to search
Project Q2982602 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Works at the Water Treatment Station of the Foundation |
Project Q2982602 in Portugal |
Statements
1,315,702.0 Euro
0 references
1,547,885.0 Euro
0 references
85.0 percent
0 references
1 March 2018
0 references
31 January 2021
0 references
MUNICÍPIO DE VILA DE REI
0 references
Q2991038 (Deleted Item)
0 references
A operação consubstancia-se numa intervenção de substituição de três pontos de tratamento existentes, ineficientes e com riscos de funcionamento, por apenas uma ETAR, e adaptação da rede de saneamento, no sentido de alcançar uma maior otimização dos recursos, garantindo a qualidade do serviço prestado às populações e a sustentabilidade dos sistemas no âmbito do tratamento de águas urbanas, maximizando o cumprimento dos normativos. (Portuguese)
0 references
The operation consists of an intervention to replace three existing treatment points, inefficient and with operational risks, by only one sewage treatment plant, and adaptation of the sanitation network, in order to achieve greater optimisation of resources, ensuring the quality of the service provided to the populations and the sustainability of the systems in the urban water treatment, maximising compliance with the regulations. (English)
9 July 2021
0 references
L’opération consiste en une intervention visant à remplacer trois points de traitement existants, inefficaces et à risque opérationnel, par une seule station d’épuration, et à adapter le réseau d’assainissement, afin d’obtenir un meilleur rapport qualité-prix, en assurant la qualité du service fourni à la population et la durabilité des systèmes dans le domaine du traitement des eaux urbaines, en maximisant le respect de la réglementation. (French)
7 December 2021
0 references
Vila de Rei, Fundada
0 references
Identifiers
POSEUR-03-2012-FC-000883
0 references