Remodeling of the Benlhevai SAR (Q2982600)
Jump to navigation
Jump to search
Project Q2982600 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Remodeling of the Benlhevai SAR |
Project Q2982600 in Portugal |
Statements
32,202.0 Euro
0 references
37,885.0 Euro
0 references
85.0 percent
0 references
1 November 2017
0 references
31 December 2020
0 references
MUNICÍPIO DE VILA FLOR
0 references
A Remodelação da ETAR de Benlhevai drenará graviticamente os afluentes da actual ETAR de Benlhevai. Esta ETAR tem como grande objectivo tratar satisfatoriamente todas das águas residuais urbanas de Benlhevai, dotando a mesma de um sistema satisfatório de tratamento de águas residuais, produzindo-se assim uma mais-valia ambiental e social. (Portuguese)
0 references
The Remodeling of the Benlhevai treatment plant will gravitically drain the tributaries of the current Benlhevai sewage treatment plant. The main objective of this treatment plant is to satisfactorily treat all urban waste water in Benlhevai, providing it with a satisfactory system of waste water treatment, thus producing environmental and social added value. (English)
9 July 2021
0 references
La remise à neuf de la WWTP de Benlhevai drainera sévèrement les affluents de l’actuelle station d’épuration de Benlhevai. L’objectif principal de cette station d’épuration est de traiter de manière satisfaisante toutes les eaux urbaines résiduaires de Benlhevai, en lui fournissant un système satisfaisant de traitement des eaux usées, produisant ainsi une valeur ajoutée environnementale et sociale. (French)
7 December 2021
0 references
Vila Flor, Benlhevai
0 references
Identifiers
POSEUR-03-2012-FC-000859
0 references