Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems (Q2982854)
Jump to navigation
Jump to search
Project Q2982854 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems |
Project Q2982854 in Portugal |
Statements
382,138.0 Euro
0 references
495,936.0 Euro
0 references
77.05 percent
0 references
1 January 2020
0 references
31 December 2021
0 references
MUNICÍPIO DE POMBAL
0 references
Q2990897 (Deleted Item)
0 references
A candidatura consiste na criação de 70 ZMC's nos 1.390 Km de rede e instalação de 70 medidores de caudal, de 147 válvulas de seccionamento e de 5 sistemas redutores de pressão, nas infraestruturas de AA já existente instalação de equipamento informático de gestão de redes e comunicação, visando a redução de perdas reais de água, que se estimam em 10% após a conclusão da empreitada a levar a efeito no âmbito desta candidatura. (Portuguese)
0 references
The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application. (English)
9 July 2021
0 references
L’application consiste en la création de 70 ZMCS sur le réseau de 1,390 km et l’installation de 70 débitmètres, 147 vannes de section et 5 systèmes de réduction de pression, dans l’installation existante de l’infrastructure AA d’équipements informatiques de gestion du réseau et de communication, visant à réduire les pertes réelles d’eau, qui sont estimées à 10 % après l’achèvement du contrat à exécuter dans le cadre de cette application. (French)
7 December 2021
0 references
Pombal
0 references
Identifiers
POSEUR-03-2012-FC-001297
0 references