Installation of a thermal energy distribution network with biomass generation equipment to serve six buildings in the municipality of Silleda — Phase I (Q3232382)
Jump to navigation
Jump to search
Project Q3232382 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a thermal energy distribution network with biomass generation equipment to serve six buildings in the municipality of Silleda — Phase I |
Project Q3232382 in Spain |
Statements
653,270.14 Euro
0 references
816,587.67 Euro
0 references
80.0 percent
0 references
18 May 2017
0 references
3 December 2018
0 references
CONCELLO DE SILLEDA
0 references
36052
0 references
Instalación de una red de distribución de energía térmica mediante equipos de generación con biomasa, de potencia nominal 1.002 kW y una volumen de almacenamiento de biomasa de aproximadamente 140 m3, para abastecer de calefacción y agua caliente sanitaria a los edificios: Escuela Infantil Galiña Azul, Pabellón de Deportes, Piscina Municipal, Campo de fútbol, Residencia de día municipal y Hotel Spa Vía Argentum. (Spanish)
0 references
Instalation of a District Heating with biomass boiler, with a Nominal Power of 1.002 kW and a biomass accumulation volume of 140 m3, to service the following buildings: Nursery school "Galiña azul", Sports Hall, Municipal Swimming pool, Football Field, Daycare Centre and Hotel spa "Via Argentum". (English)
0 references
Installation d’un réseau de distribution d’énergie thermique utilisant des équipements de production de biomasse, d’une puissance nominale de 1,002 kW et d’un volume de stockage de biomasse d’environ 140 m³, pour alimenter les bâtiments en chauffage et en eau chaude domestique: Galiña Azul École pour enfants, Pavillon des Sports, Piscine municipale, terrain de football, Résidence municipale de jour et Hôtel Spa Via Argentum. (French)
5 December 2021
0 references
Silleda
0 references
Identifiers
048-2018000299
0 references