Bicycle path and pedestrian construction between Carregal do Sal and Oliveirinha (Q2877485)

From EU Knowledge Graph
Revision as of 23:11, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2877485 in Portugal
Language Label Description Also known as
English
Bicycle path and pedestrian construction between Carregal do Sal and Oliveirinha
Project Q2877485 in Portugal

    Statements

    0 references
    621,820.0 Euro
    0 references
    731,553.0 Euro
    0 references
    85.0 percent
    0 references
    1 December 2020
    0 references
    31 December 2022
    0 references
    MUNICÍPIO DE CARREGAL DO SAL
    0 references

    40°26'0.28"N, 8°0'10.87"W
    0 references
    Promoção da mobilidade em modos suaves e para os ganhos ambientais associados (diminuição do tráfego automóvel e das emissões de GEE), para a promoção de uma mobilidade mais inclusiva, uma vez prevê intervenções que asseguram condições de acessibilidade e segurança aos utilizadores, em particular aqueles mais vulneráveis. (Portuguese)
    0 references
    Promoting mobility in smooth modes and associated environmental gains (decreased car traffic and GHG emissions), to promote more inclusive mobility, as it provides for interventions that ensure conditions of accessibility and safety for users, in particular those most vulnerable. (English)
    7 July 2021
    0 references
    Promouvoir la mobilité dans des modes fluides et les gains environnementaux associés (diminution du trafic automobile et des émissions de gaz à effet de serre), afin de promouvoir une mobilité plus inclusive, étant donné qu’elle prévoit des interventions garantissant l’accessibilité et les conditions de sécurité pour les utilisateurs, en particulier les plus vulnérables. (French)
    5 December 2021
    0 references
    Carregal do Sal
    0 references

    Identifiers

    CENTRO-06-1406-FEDER-000073
    0 references