Sports Pavilion EB School 2 3 in Alcanede (Q2862783)

From EU Knowledge Graph
Revision as of 15:43, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2862783 in Portugal
Language Label Description Also known as
English
Sports Pavilion EB School 2 3 in Alcanede
Project Q2862783 in Portugal

    Statements

    0 references
    970,302.0 Euro
    0 references
    1,141,532.0 Euro
    0 references
    85.0 percent
    0 references
    1 July 2019
    0 references
    29 October 2021
    0 references
    MUNICÍPIO DE SANTARÉM
    0 references
    0 references

    39°24'54.65"N, 8°49'41.38"W
    0 references
    O projeto consiste na construção de um pavilhão desportivo para a escola EB 2 3 de Alcanede, substituindo as soluções precárias atualmente utilizadas por 275 alunos na prática de desporto escolar, concluindo um esforço para dotar a rede escolar concelhia de condições suficientes para a referida prática. (Portuguese)
    0 references
    The project consists of the construction of a sports pavilion for the school EB 2 3 in Alcanede, replacing the precarious solutions currently used by 275 students in the practice of school sport, concluding an effort to provide the school network with sufficient conditions for this practice. (English)
    6 July 2021
    0 references
    Le projet consiste en la construction d’un pavillon sportif pour l’école EB 2 3 à Alcanede, en remplacement des solutions précaires actuellement utilisées par 275 élèves dans la pratique du sport scolaire, concluant un effort pour doter le réseau scolaire de conditions suffisantes pour cette pratique. (French)
    4 December 2021
    0 references
    Santarém, Alcanede
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000082
    0 references