School Center EB 1/JI of Asseiceira (Q2862690)
Jump to navigation
Jump to search
Project Q2862690 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | School Center EB 1/JI of Asseiceira |
Project Q2862690 in Portugal |
Statements
182,576.0 Euro
0 references
214,795.0 Euro
0 references
85.0 percent
0 references
8 August 2017
0 references
31 December 2018
0 references
MUNICÍPIO DE RIO MAIOR
0 references
A ampliação da EB1/JI de Asseiceira justifica-se pelas reduzidas condições físicas e pela ausência de espaços e recursos técnico-pedagógicos fundamentais para o sucesso e vivência escolares, com características manifestamente desajustadas às atuais exigências educativas. Pretende-se, pois, contribuir para a promoção do sucesso escolar dos alunos e proporcionar similares condições de ensino a todas as crianças e alunos do concelho. (Portuguese)
0 references
The expansion of the EB1/JI of Asseiceira is justified by the reduced physical conditions and the absence of spaces and technical-pedagogical resources that are fundamental to the success and experience of schools, with characteristics manifestly unfit to the current educational requirements. It is therefore intended to contribute to the promotion of students’ school success and to provide similar teaching conditions for all children and pupils in the municipality. (English)
6 July 2021
0 references
L’expansion de l’EB1/JI d’Asseiceira se justifie par la réduction des conditions physiques et l’absence d’espaces et de ressources techniques et pédagogiques fondamentales à la réussite et à l’expérience scolaires, avec des caractéristiques manifestement inappropriées par rapport aux exigences éducatives actuelles. Il est donc destiné à contribuer à la promotion de la réussite scolaire des élèves et à offrir des conditions d’enseignement similaires à tous les enfants et étudiants de la municipalité. (French)
4 December 2021
0 references
Rio Maior, Asseiceira
0 references
Identifiers
ALT20-02-5673-FEDER-000018
0 references