EDUSI MANAGEMENT AUF BORMUJOS (Q3185480)

From EU Knowledge Graph
Revision as of 14:57, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3185480 in Spain
Language Label Description Also known as
English
EDUSI MANAGEMENT AUF BORMUJOS
Project Q3185480 in Spain

    Statements

    0 references
    280,000.0 Euro
    0 references
    350,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2019
    0 references
    31 December 2023
    0 references
    DIPUTACION PROVINCIAL DE SEVILLA
    0 references

    37°23'19.07"N, 5°59'43.22"W
    0 references
    41091
    0 references
    Apoyar la actividad de gestión del Programa Operativo a través del_x000D_ refuerzo en la gestión de las Estrategias de desarrollo urbano sostenible_x000D_ e Integrado incluidas en el Eje Prioritario 12 de este P.O. Se corresponde_x000D_ con los gastos correspondientes a la contratación de una asistencia_x000D_ técnica externa de apoyo a la Entidad Local en su doble papel,_x000D_ beneficiaria y OIL._x000D_ A su vez, también se cuenta con la asignación de personal para la gestión_x000D_ de la EDUSI, ya sea mediante designación de personal propio o mediante_x000D_ proceso de selección._x000D_ Se incluyen otros gastos generales que puedan ser necesarios para la_x000D_ correcta gestión, e implementación de la Estrategia. (Spanish)
    0 references
    Support the management activity of the Operational Programme through the_x000D_ reinforcement in the management of the Sustainable Urban Development Strategies_x000D_ and Integrated included in Priority Axis 12 of this PO._x000D_ beneficiary and OIL._x000D_ In turn, staff allocation is also available for the management_x000D_ of the EDUSI, either through the designation of own staff or through_x000D_ selection process._x000D_ Other overheads that may be necessary for the correct management and implementation of the Strategy are included. (English)
    12 October 2021
    0 references
    Soutenir l’activité de gestion du programme opérationnel par le renforcement_x000D_ de la gestion des stratégies de développement urbain durable_x000D_ et intégrée inclus dans l’axe prioritaire 12 de ce PO._x000D_ bénéficiaire et OIL._x000D_ À son tour, l’affectation du personnel est également disponible pour la gestion_x000D_ de l’EDSI, soit par la désignation de son propre personnel, soit par le biais du processus de sélection_x000D_._x000D_ (French)
    4 December 2021
    0 references
    Sevilla
    0 references

    Identifiers

    FDU3AN09102
    0 references