11,132,323.79 zloty
0 references
13,760,598.01 zloty
0 references
80.9 percent
0 references
5 June 2017
0 references
30 June 2023
0 references
GMINA MIEJSKA LIDZBARK WARMIŃSKI
0 references
Działki - lokalizacja inwestycji: 53/4,66/2 obr. 9, 86/6,98,99/1,99/2 obr. 10, 38/30,23/1,124,125 obr. 9 w jedn. ew. Gmina M. Lidzbark Warm. oraz działki nr 30-47/2, 30-47/5 w obr. ew. Łabno Przedmiotem projektu jest budowa obiektów-urządzeń z zakresu lecznictwa uzdrowiskowego w Lidzbarku Warm.. Zakres inwestycji: 1.Budynek pawilonu zdrowia, 2.Promenady-trasy kinezyterapii złożone ze ścieżek zdrowia 3.Promenada tzw. ul. Leśna -trasa terenoterapii pieszej-Remont odcinka drogi gruntowej tzw. ul. Leśnej 4.Rozbudowa towarzyszącej promenadom oraz budynkowi Pawilonu zdrowia infr. Techn.: 5.Mała architektura 6.Infr. towarzysząca 7.Zagospodarowanie terenu wokół budynku pawilonu zdrowia oraz wzdłuż promenad 8.Przebudowa zbiornika naturalnego 9. Budowa układu kinezyterapii aktywnej – rowerowy układ wysiłkowy 10. Zakup środków trwałych szczegółowy opis zawarto w zał. 10 oraz 5 do WOD. Etapy realizacji proj.: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z pzp. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harm. -zakończenie robót i podpisanie prot. końcowego -końcowe rozliczenie proj. sposób wdrażania zakr. rzeczowego: -podpisanie umowy -realizacja prac -odbiór końcowy i podpisanie prot Projekt wpisuje się w SZOOP RPO WWM realizując Cel tematyczny 6–Zachowanie i ochrona środowiska oraz promowanie efektywnego gospodarowania zasobami,cel szczegółowy:Zwiększona atrakcyjność turyst. zasobów dziedzictwa naturalnego regionu poprzez rozwój publicznej infr. uzdrowiskowej. Z proj. będą mogli korzystać wszyscy Interesariusze projektu. Kontynuowane będzie odtwarzanie funkcji uzdrowiskowej regionu w miejscowościach znajdujących się na zaawansowanej ścieżce uzyskania takiego statusu. Lidzbark Warm. daje niewiele możliwości wypoczynku, rozrywki i rekreacji.Stworzenie funkcji uzdrowiskowej pozwoli stworzyć bogatą ofertę turystyczną w oparciu o posiadane walory przyrodnicze. (Polish)
0 references
Plots – location of the investment: 53/4,66/2 rp. 9, 86/6.98.99/1.99/2 rp. 10, 38/30,23/1,124,125 r. 9 in one e.g. Municipality of M. Lidzbark Warm. and plot No 30-47/2, 30-47/5 in Elbno. The object of the project is the construction of facilities in the field of spa treatment in Lidzbark Warm. Scope of investment: 1.The building of the health pavilion, 2.Promenade- kinesitherapy routes composed of health pathways 3. The promenade of so-called ul. Forest – route of terrain therapy for pedestrian-repair of the section of the ground road so-called ul. 4.Expansion of the accompanying promenade and the building of the health Pavilion infr. Techn.: 5.Small architecture 6.Infr. accompanying 7.Development of the area around the building of the health pavilion and along promenade 8.Reconstruction of the natural reservoir 9. Construction of active kinesitherapy system – exercise bike system 10. The purchase of fixed assets is described in detail in the Annex. 10 and 5 to WOD. Stages of project implementation: —submit an application for dof. —signing a dof contract. selection of the contractor in accordance with —conclusion of the contract with the contractor and commencement of works -implementation of works in accordance with the assumed harm. —the completion of works and the signing of the final report – final settlement of the project for the implementation of the material part: —signing the contract -implementation of the works -final reception and signing of the project is part of the SZOOP ROP WWM implementing the thematic objective 6 – Conservation and protection of the environment and promoting resource efficiency, the objective of szczegółowy:Zwiększona the attractiveness of tourists. The resources of the natural heritage of the region through the development of public spa infra. All project stakeholders will be able to benefit from the project. The restoration of the spa function of the region in the villages located on the advanced path of obtaining such status will continue. Lidzbark Warm. offers few opportunities for leisure, entertainment and recreation. The creation of a spa function will allow you to create a rich tourist offer based on the natural assets. (English)
8 July 2021
0 references
Parcelles — emplacement de l’investissement: 53/4,66/2 rp. 9, 86/6.98.99/1.99/2 p. 10, 38/30,23/1, 124 125 r. 9 dans une municipalité de M. Lidzbark Warm. et la parcelle no 30-47/2, 30-47/5 à Elbno. L’objet du projet est la construction d’installations dans le domaine du traitement thermal à Lidzbark Warm. Portée de l’investissement: 1.Le bâtiment du pavillon de santé, 2.Promenade- voies de kinésithérapie composées de voies de santé 3. La promenade de ce que l’on appelle ul. Forêt — itinéraire de thérapie de terrain pour la réparation piétonne de la section de la route terrestre dite ul. 4.Expansion de la promenade d’accompagnement et de la construction du Pavillon de la santé infr. Technique: 5.Petite architecture 6.Infr. accompagnant 7.Développement de la zone autour du bâtiment du pavillon de santé et le long de la promenade 8.Reconstruction du réservoir naturel 9. Construction d’un système de kinésithérapie active — système de vélo d’exercice 10. L’achat d’immobilisations est décrit en détail dans l’annexe. 10 et 5 à WOD. Étapes de la mise en œuvre du projet: —présenter une demande de dof. signature d’un contrat. sélection du contractant conformément à —conclusion du contrat avec l’entrepreneur et début des travaux — exécution des travaux en fonction du préjudice présumé. —l’achèvement des travaux et la signature du rapport final — règlement final du projet pour la mise en œuvre de la partie matérielle: —signer le contrat -mise en œuvre des travaux — réception finale et signature du projet fait partie du SZOOP ROP WWM mettant en œuvre l’objectif thématique 6 — Conservation et protection de l’environnement et promotion de l’efficacité des ressources, l’objectif de szczegółowy:Zwiększona l’attractivité des touristes. Les ressources du patrimoine naturel de la région à travers le développement de spa public infra. Toutes les parties prenantes du projet pourront en bénéficier. La restauration de la fonction thermale de la région dans les villages situés sur le chemin avancé de l’obtention de ce statut se poursuivra. Lidzbark Warm. offre peu de possibilités de loisirs, de divertissement et de loisirs. La création d’une fonction spa vous permettra de créer une offre touristique riche basée sur les atouts naturels. (French)
4 December 2021
0 references
Identifiers
RPWM.06.02.01-28-0001/19
0 references